MEMORANDUM
May 30, 1984
Community Planning Department
Health and Environmental Protection
Case #S-6787A Lots 1, 2 Deer Horn Subdivision
This department requires a note on the plat adressing
an engineered designed mound sewer system and lift
station being required for Lots 1 and 2 Block 1. This
is due to a high water table condition. With the above
note on this plat, this Department can sign off the
proposed subdivision.
John W.~ Lynn
Environmental Specialist
JWL/ljw
· ,~:IU~ICIP'=~LITY OF ANCHORAGES%
Departmen ~, ~f Health & Environmental' :otection
Environmental Health Division
Case Review Worksheet
Case Number) I Date Received
S-6787 ~/ February 2, 1983
SubdiviSion or Project Title:
Deer Horn Subdivision
Comments Due By
February 17,
1983
( ~ublic sewer available
~ Community water available
CoComments~
DEER HORN SUBDIVISION
contour map
FROM MUNICIPAL CONTOUR MAP 1977: Scale 1"--200'
~; 6 7 8 7 I,,~AR 1. 6 '1983
N
~ ." /{.~
l; \'
DEER HORN SUBDIVISION
slope analysis for septic
systems:
LOT BLOCK AREA (LESS THAN 25~)~
2 ! 12,000 SF
3 2 11,000 SF
4 2. 2O,000 SF
5 2 12,000 SF
October
S A
& ENGINEERS, INC.
$
7125 OLD SEWARD HIGHWAY ° ANCHORAGE, ALASKA 99502
22,. tgg2
DEER HORN SUBDIVISION
SOILS INVESTIGATION
Site Conditions:
The proposed project is located in the Peters Cre~k
area, more specifically located in the SE l/~, SE l/~, NW
1/4 of Sec. ~, Township l~ N, Range I West, Seward Meridian.
The parcel is t0.0 acres. The vegetation is birch
trees and alder.
Proposed Construction:
The proposed residential subdivision will consist of a
minimum of 1/2 acre lots with a community water system. The
water will be supplied by the adjoining subdivision of North-
woods. The zoning in this area is "U" - unrestricted. Deer
Horn Subdivision is within the special study rural
development area.
Field Exploration and Soils Condition:
The soils investigation was performed by S & 5 Engi-
neers, Inc. The project engineer for the soils investiga-
tion was 3ames Sawhill. Eight test .holes were excavated
with..a Case backhoe. The test hole logs and their locations
are attached.
Recommendations: m
Ali test hole~, excavated in Block 2 indicate that
these lots are suitable for septic systems. Ground water
was encountered in one hole, but it is at a depth
that will allow the septic system to function properly.
Ground water was encountered at shallow depths in Lots
I and 3, Block 1. We propose to install a curtain drain
system to intercept the water riding on the dense
gravel/sand encountered at 6~. This will lower the water.
table in Block [ and allow the septic system to function
.properly. We propose to install the curtain drain system
this year, so that we may verify the water elevations on
ruction on these lots.
these lots next year~ prior to con~t
3ohh-E. Swan~"n, F.E.
8 7 MAR ]. 6 1983
EAGLE RIVER ANCHORAGE HOMER
:.& ENGINEERS, INC.
s
7125 OLD SEWARD HW~'.
ANCHORAGE, ALASKA 99503
349 -6561
SOILS LOG - PERCOLATION TEST
I I PEftCOLATION
TEST
LEGAL DESCRIPTION; ~ I~¥v~,, ~''
SLOPE
10
12
14
IS
16
17
18
19-
COMMENTS
TEST RUN OETWEEN
"3'/-~ //' 'Ye,-,, c.;~,,~,
/
DATE:
· ENGINEERS, INC,
7125 OLD SEWARD HWY.
ANCHORAGE, ALASKA 99503
549 -6561
II PERCOLATION
SOILS LOG - PERCOLATION TEST
PE;IFORMEO FOR:
LEGAL DE SCI[I IP 1'ION:
I
5
6
7
8
9
10
11
12
!'.,
14
· 15
16
17
18
19
20
SLOPE
II
",, I I
' '"'"k '
I/I..
III
III
III
114
I,r¢
II.
SITE PLAN
WAS GROUND WATER
ENCOUNTERED?
IF YES, AT WHAT
DEPTH?
PERCOLATION RATE Iminulellie~ch J
TEST RUN OETWEEN ~* . FT AND t~T ' F~I'
COMMENTS
PERFORMED
CERTIFIED 0¥:
DATE: "'
& ENGINEERS, INC.
7t25 OLD SEWAR0 HWY?~;''
ANCHORAGE, ALASKA 99503
549-6561
SOILS I.()(; I'EIICOI.AI'I(IN I'1'SI
4
6
7
8
9
10
12
13
14
15
16
17
18
19
'20-
COMMON'rs
..Department,of Health & Environmental ~4otection
Environmental Health Division
Case Review Worksheet
Case N-mher I Date Received
S-6567~ September 28, 1982 '
Subdivision or Project Title:
Comments Due By
October 20, 1982
Blocks 1, 2 Deer Horn subdivision with Vacation
Public sewer available
( ) Community water available
Comments:
MEMORANDUM
DATE:
TO:
FROM:
SUBJECT:
November 15, 1982
Planning Department
llealth and Environmental Protection
S-6567~ Deer Horn Subdivision ~l~
This department received the redesign(November 15, 1982) for the
subject case. The department can approve this design. However,
the 100 foot creek setback just north of Lots 4 and 5 must be shown
on the plat.
Also, mentioned in previous comments regarding monitoring water
table and submitting to this department the monitoring data, with
as-builts of curtain drain for Lots 1 and 2 prior to final approval.
John T';. Lynn
Environmental Specialist/
L/1jw ' '
91-010 (5/78)
Municipality of Anchorage
Planning Dept,
Pouch 6 650
Anchorage, Alaska
Regarding:
DeerHorn Subdivision
Case No. S 6567
SE ~,SEZ NWl
Sec~ TI§N R1W S.M.
Slope Calculations
Cul de saC
1ST. ?Oft.drops 18ft. in elevation. This equals a 26% slope
Entire 135ft. drops 20 ft in elevation. This equals a IS%slope.
LOTS
1North
North .200ft. alon.t East line. 70 % of lot length drops 6l ft. This
equals a 32% slope.
North 130ft. along west line. 52% of 'lot length drops lOft. This
equals a 31% slope.
Average Slope is 18% throughout entire lot length.
2North
North 130 ft. along east line. 52% of lot length drops lOft. This
equals a 31% slope.
North lO0ft, along I/est line. 17% of lot length drops 25ft. This
equals a 25?0 slope.
Average Mope is 15% throughout entire lot length.
3N
North llOft, along east line. 51% of lot length drops
equals a 23% slope.
North 135ft along I/est line. 65% of lot length drops 22ft.
a 17% slope.
Average Slope is 13% thrughout entire lot length.
25ft. This
This equals
lN
North 130ft. along East line. 65% of lot length
equals a 17% slope.
South 1/.Oft along West line. 100% of lot length
equals a 16% slope.
Average slope is 1/.% throughout entire lot length.
drops 22ft.
drops 22ft.
This
This
5N
Average slope is 22%.
6N
South 19Oft. along East line. 81% of lot length drops 46ft.
23% slope.
South I80ft. along west line. 72% of lot length drops 48ft.
27% slope.
Average slope is 20% through entire lot length.
This equals a
This equals a
7N
South 180ft. along Uest line. 72% of lot length drops &gft.
27% slope.
Average slope is 20% throughout entire lot length,
This equals a
gN
Average slope is 3Z through entire lot length.
9N
Average slope is 2% through entire lot length.
Average slope is 0%
1S
Average slope is 0%.
2S
Average slope is 6Z.
3S
Average slope is 8%.
~CROUND WATER LEVELS
Soil test holes were dug on approx. Oct. 15, 1982 on lots # 1S and 3S. With
in 30 hours after the test holes were dug, ground water was observed stand-
ing in both holes approx. 3ft. below the ground level. On October 25, 1982,
standing ground water was measured at 34 inches below ground level in test
hole 1S and llin. below ground level in testhole 3S.
PROJECTIONS FROM TEST RESULTS IN NEARBY TESTS
IS, 2S, & 3S 2ft-6ft belou surface.
1N, 2N, 3N, 4N, 9N, & ION- §ft. to 8ft. below surface.
5N, 6N, 7N, 2fi to 4fi below surface.
On site septic systems could not be installed on the less then half acre lots,
under these severe ground water conditions.
DRAINAGE
The North half of lots 5N, 6N, and 7N, lie within the lowest portion of
one of the major east to west drainage courses in the North half of Section
4. This drainage course also serves the North half of the Northwoods 320 acre
subdivision and the majority of the Deer Park I and Deer Park 2 subdivisions.
This drainage course has been designated "Green Belt" in the Northwoods
subdivision to the East.
ESTABLISHED DEVELOPMENT TREND
Deer Park 1 and Deer Park 2 Subdivisions, adjoining the proposed sub~
division to the North, Northwest, and West ts 1 to 1% acres per
(26 lots on 40 Acres, or 1.54 acres per lot overall.)
Foxhlll Subdivision, adjoining the proposed subdivision to the South is I to
acres per lot. (25 lots on 30 acres, or 1.2 acres per lot)
Recent request for subdivision of Knik View Estates, located 132Ofc North,
and 66Oft. West of proposed Deer I{orn Subdivision was denied for basically
the same reasons. There is presently a petition underway by 60~ of the
land owners in the area to have the NW/4 of Section 4 zoned R-7.
ROADS
The Deer Itorn Subdivision will be served by a segment of Deer Park Drive .
which is not dedicated. This portion of Deer Park Drive is extremely
narrow and has not been improved or upgraded due to its undedicated status.
RECObIMENDATIONS
The preliminary plot be redrawn to take ground water, slope, terrain, top-
ography, drainage, groundwater, and existing development norms, into con-
sideration. Taking all of these criteria into consideration, the subject
10 acre parcel cannot be subdivided into the 13 lots as proposed.
September
& ENGINEERS, INC.
S W L,~UN!CIPAU'D~ CF ANCHORAG~
7125 OLD S~ARD HIGHWAY · ANCHORAG~ A~S~ ~2
22, 1982 c~
.R. ECEI.V. ED
DEER HORN SUBDIVISION
PRELIMINARY SOILS INVESTIGATION
Site Conditions:
The proposed project is located in the Peters Creek
area, more specifically located in the SE 1/~ SE l/~ NW
1/~ o! Section ~ Township 15 N~ Range I West~ Seward Meri-
dian.
The parcel is 10.0 acres. The vegetation is birch
trees and alder.
Proposed Construction:
The proposed residential subdivision will consist of a
minimum of 1/2 acre lots with a community water system. The
water will be supplied by the adjoining subdivision of North:-
woods. The zoning in this area is "U" - unrestricted.
Field Exploration and Soils Condition:
The soils investigation was performed by,S & S Engi-
neers, Inc. The project engineer for the soils investiga-
tion was 3ames Sawhill. Two test holes were excavated with
a Case backhoe. The test hole logs and their;locations are
attached.
Recommendations:
The gravel and sandy gravel soils in Deer Horn Subdivi-
sion are suitable for septic systems. A more detailed soils
investigation will have to be performed after preliminary
plat approval to verify the suitability o! each lot. No
problems are expected.
3
1982
e ~GLE RIVER ANCHO~GE HOMER
'265 0
t:::~E
27·
October 22,
& ENGINEERS, INC.
S W
7125 OLD SEWARD HIGHWAY · ANCHORAGE, ALASKA 99502
1982
DEER HORN SUBDIVISION
IdUNICIPALITY OF ANCHORAOI~
DFPT. Ct: I'.e,'LT:!
ENVIR 9;.l,',~.~l' jA_
GOT P, 8 lg82
RECEIVED
SOILS INVESTIGATION
Site Conditions:
· ,..,.:-- .The proposed.,p~oject 'iS.,~:~!°ca~ed .in. the,,<Peters,..Creek.-.:....~:::; ..... .
' '"area, more specifically located- ln.the-SE;,l/~, SE
1]~ of Sec. 4, Township 1§ N, Range I West, Seward Meridian.
The parcel is 10.0 acres. The vegetation is birch
trees and alder. ·
· 'Proposed Construction: '- ........ .' ' '" ''*
The proposed residential subdivisT6n'will Eo'nslst"ola ........
'minimum o! 1/2 acre lots with a community water system. The ;':
water will be supplied by the adjoining subdivision o! North-
woods. The zoning in this area is 'U" - unrestricted. Deer
Horn Subdivision is within the special study rural
development area.
Field Exploration and Soils Condition:
The soils-investigation was periormed by 5 & S
neers, Inc. . The project engineer for the soils
tion was 3ames Sawhill.. Eight test holes were
with a Case backhoe. The test hole logs and their
are attached.
Engi2'
investigao..
excavated.,''
locations'.
Recommendat ions:
All test holes excavated in Block 2 indicate that
these lots are suitable for septic systems. Ground water
was encountered in one. hole, :but, it', is at a depth
that will allow the septic system'to' function properly.
Ground water was encountered.at.shallow depths in Lots
I and 3, BloCk 1. We propose to install a curtain drain
system to intercept ~the · water riding on the 'dens&
gravel/sand encountered, a't :':6e:'' '.This will.:..lower the water
· table in Block I and allow.;.~the ,septic sy,stem to function ....
"." :. properly. .We' propose,' tb ..'install'-the curtain drain '.system .~:.'. ,...,
· ~ '.this year, so that we'rn~.:.'verify', the wat~'r .'.'el'evatlbns,~',on;-..
these lots next 'year, .prior; to co.n~tructlon on these lots. .u,;~':
· . -~ · . .. ,. , .o : .~;'.Q :~?.
& ENGINEERS, INC.
s
7125 OLD SEWARD 'H~/~';:" ':':":'; .... u' '%~L'S'rOG' '?'"'"'"~'
ANCHORAGE, ALASKA 99503
349 - 6561 13 PEnCOLAT~ON
TEST
SOILS LOG - PERCOLATION TEST
PERFORMED FOR:
I~EGAL DESCRIPTION:
9 $
SLOPE SITE PLAN
10-
WAS GROUND WATER
11 ~_~r&,~t ~ ~a/ ENCOUNTERED?
15-
16-
17-
18-
19-
-- ' PERFORME~O... BY: '
Date Time
PERCOLATION RATE '- ; Vi.~;,! (t~ .I
Net
& .'ENGINEERS, INC.
s
ANCHORAGE, ALASKA 99503
349 - 6561 '"" --I--- PERCOLATION
TEST
SOILS LOG - PERCOLATION TEST
PERFORMED FOR:
LEGAL DESCRIPTION:
I
5
7
" 8
10
11
12
SL SITE PLAN
'II
~ l{
~11
:' 1~1
I1~1.
I11
-Ill
'Ill'
ILl
=ILL
II.
WAS GROUND WATER
ENCOUNTERED?
IF YES, AT WHAT
OEPTH?
Read;rig Date Time
I LO' 'l
I
JOHN [. SWANSON..'
1834-E
& ENGINEERS, INC.
· t~ 7125 OLD SEWARD .H'WYJ.*'J f"~. ,, '.-,--= LU. . ''
ANCHORAGE, ALAS~:A 99~03 ' ' =
349-6561 e.c( lat.~N ..
SOILS LC)C; PEIiCOLATIC)N TES1
.~,
7
8
9-
10-
11
12
13
IF YES. AT WHAT
DEPTH~
" S
1834-[
,o .. ,,-... ..,.:~:;¢~-/;)
' ,~s~ ,~, ,,w,, ~. ' . ' Z'-:'_ ..... '
ENGINEERS, INC. ANCHORAGE, ALASKA 9'9503 ...... *:' :"
..... 349-6561 "' ;~/' .Encot^:nO~
~ rEST
S
7
8
,9
10
I!
'12
~,. SOILS LOG -- PERCOLATION TEST
PE.,o.~o ,o,,' ~...... t%o,-~, ,, _, ~ ,,^,E ,.,,OR,~EO: ~..,~__-'.'.'.'.'.'.'.'.'.~__
/ SLOPE SITE PLAN
I
WAS GROUND WATER
ENCOUNTEREO?
P
E
,,, f.O' txt/_'
· .. 19 ' q"~ F'//O~" O'A~: '1' ' : ' ' ' ' '*"" :;"
~-~,,,,___//_... .:. . . ........ '.....i'~:'",
& ENGINEERS, INC. ANCHORAGE, ALASKA'99503 -
s ~ 349-656~
SOILS LOG -PERCOLATION TEST
/ SLOPE
· o'- z' ~,'~ .~/So.~-
5
6
7
8
9
10
11
'12
SITE PLAN
IF YES, AT WHAT
20 ~ ' '
FT
'~lJ~J~k ~ 7125 OLD SEWARD .'WY,
ENGINEERS, INC, ANCHORAGE, ALASKA 99503
~ 349 - 6561 '/~"E'COCAhON
tEST
SOILS LOG -PERCOLATION TGSI
SITE PLAN
ENCOUNTERED)
! I · WAS GROUND WATER
'12 IF YES. AT WHAT
ENGINEERS, INC.
7125 OLD SEWARD HWY..
ANCHORAGE° ALASKA 99503
549 -6561 ·
SOILS LO(3 -PERCOLATION TEST
rEST
I
5
6
7
8
9
SLOPE SITE PLAN
11
'12
WAS GROUNO WATER
ENCOUNTERED~
IF YES. AT WHAT
Time
':' & ENGINEERS, INC.
7125 OLD SEWARD H'WY.
ANCHORAGE, ALASKA 9950:5
349 -6561
SOILS LOG .- PERCOLATION TE$1
I
2
3
7
8
9
10
II
'12
13-
14
15
16
!7
18
19
20-
SITE PLAN
WAS GROUND WATER ~)_ S
ENCOUNTERED? S/~/~ ~
,F'ES. ATW.AT
DEPTH) ....
JOHN £ SWANSON
1834-E
'"' ' ~< ~ 7 '"'" · :.'
TEST RUN BETWEEN FT AND , ~T ·
'-. : ~ · , .. . ,..,. . ..:~.,.~,' ]
COMMENTS '." ' ' ...... ' ' '~ ': · ' ' ' ~ = ~ ' :~'~ ' ';'~," ,
.......... ....' . ~" ; ". .... ' /0/'~.~-/~' " "
& ENGINEERS, INC.
$
7125 OLD SEWARD HIGHWAY · ANCHORAGE, ALASKA 99502
October 22~ 19g2
Municipality of Anchorage
Platting Section ..-
632 W. 6th Ave,
Anchorage~ Alaska 99501
ATTN:
RE:
Christine Broders
Deer Horn Subdivision
Dear Christine:
This letter is in response to your request for addition-
al information concerning the water system for Deer Horn Sub-
division, The water will be supplied by Chugiak Utilities~
Inc. This utility company is currently supplying water for
North Woods Subdivision which is adjacent to Deer Horn Sub-
division to the west. The well is located in Tract "A"~ of
North Woods Subdivision~ approximately gOO feet from Deer
Horn Subdivision.
Enclosed is a letter from George C. Wilmoth~ President
o! Chugiak Utilities~ inc.~ stating they will supply water
to this subdivision. This must be approved by Alaska Public
Utilities. We have verbal approval from the commission.
If you have any further questions~ please call me at
3t~9-6561.
TRS:dd
3ob 2623
EAGLE RIVER ANCHORAGE ' HOMER
{907) 694.9846 {907) 349.6561 (907) 235-8179
George C. Wilmoth
308 G Street, Suite 211
Anchorage, AK 99501
S & S Engineers Inc
ATrN: Jim Sawhill
7125 Old Seward
Anchorage, AK 99502
October 21, 1982
This is to inform you of our intentions to extend our present water
service to inclt, a~ the property described as T15N R1W Sec 4 S.M.
which is proposed to be known as Deer Horn Subdivision. Our
existing system at Northwoods Subdivision will acco~odate the pro-
posed subdivision. However, this offer is subject to the extension
approval of the Alaska Public Utilities.
Sincerely,
George C. ~Wilmoth
President
Chugiak Utilities Inc.
De r n
MUNICIP'~LITY OF ANCHORAGE
Departme~hof Health & Environmenta]'~otection
· ~vironmental Health Divisi~
Case Review Worksheet
S-6673 December 2, 1982
Subdivision or Project Title:
Comments Due By
December 17, 1982
Deer IIorn Subdivision
( ) Community water available
October 22,
& ENGINEERS, INC.
S -
7125 OLD SEWARD HIGHWAY * ANCHORAGE, ALASKA 99502
SOILS INVESTIGATION
Site Conditions:
The proposed project is located in the Peters Creek
area, .more specifically located in the 5E l/~, 5E 1/~, NW
t/q of Sec. q~ Township 15 N~ Range ! West~ Seward Meridian.
The parcel is lO.0 acres. The vegetation is birch
trees and alder.
Proposed Construction:
The proposed residential subdivision will consist o! a
minimum o! 1/2 acre lots with a community water system. The
water will be supplied by the adjoining subdivision of North-
woods. The zoning in this area is "U" - unrestricted. Deer
Horn Subdivision is within the special study rural
development area.
Field Exploration and Soils Condition:
The soils investigation was performed by S & 5 Engi-
neers, Inc. The project engineer for the soils investiga-
tion was 3ames Sawhill. Eight test holes were excavated
with a Case backhoe. The test hole logs and their locations
are attached.
Recommendations:
All test holes excavated in Block 2 indicate that
these lots are suitable for septic systems. Ground water
was encountered in one hole, but it is at a depth
that will allow the septic system to function properly.
Ground water was encountered at shallow depths in-Lots
I and ~3, Block 1. We propose to install a curtain drain
system to intercept the water riding on the dense
gravel/sand encountered at 6t. This will lower the water
table in Block I and allow the septic system to function
properly. We propose to install the curtain drain system
this year, so that we may verify the water elevations on
these lots next year~ prior to construction on these lots.
3oh~-/i E. Swan~'~
3~fl~ 2'23 . (~__I~C./ ~
S b b7 3
EAGLE RIVER ANCHORAGE HOMER
(907) 694.9846 (907) 34~6561 (907) 2358179
'* '& 'ENGINEERS, INC,
7125 OLD SEWARD HW~',
ANCHORAGE~ ALASKA 99503
349-6561
SOILS LOG - PERCOLATION TEST
PERCOLATION
TEST
8
SLOPE
SITE PLAN
10-
I1
~ROFESSIO~
20-
WAS GROUND WATER /) t"} S
E
~<o.~., $;1~
IFYES, ATWHAT
OEPTH, /~A. __
Reedlng Oate Time
Time
Net
S,
'. & *ENGINEERS, INC.
7125 OLD SEWARD HWY.
ANCHORAGE' ALASKA 99503
349 -6561
PERCOLATION
TEST
SOILS LOG - PERCOLATION TEST
LEGAL DESCRIPTION: ~,, .) ~. '- ~'~o*~--
I
5'
6-
7-
8-
9-
10-
11-
12
:'.,
14
15-
16
SLOPE
'7.~'- Iq'
WAS GROUND WATER
ENCOUNTEREO~
IF YES. AT WHAT
OEPTH?
SITE PLAN
P
E
17,
18
19
20
JOHN E SWANSON..'
1834-E
.5"
/: :52
PERCOLATION RATE (mlnuleslinch I
TEST RUN 8ETWEEN ~-"~° . FT ANO ~ ' . F.T
COMMENTS
PE~F~flMEO 0¥:
' · &' ENGINEERS, INC. ANCHORAGE, ALASKA 99503
SC)ILS LOG PEr{COLATI[)N TESI
3
7
8
9
tO
Il
12
I :~
14
SLOPI SITE PlAN
15
16
17
18
19
JOHN E SWANSON
1834-E
20
PERCOLATION RATE
TEST RUN OETWEEN
COMMENTS
PE RI:ORMEI) 0¥:
', &* ENGINEERS, INC.
s
7125 OLD SEWARD H'WY,
ANCHORAGE, ALASKA 99503
349 -6561
PERCOLATION
tEST
PEHFOHMED FOR
LEGAL OE$CfIIPTION
I
5'
6
7
8
9
10
11
'12
14 ,
16
19
'20
SOILS LOG -- PERCOLATION TEST
SLOPE SITE PLAN
P
E
IF YES. AT WHAT : ~ !
Read;rig Dale Time
P'EflCOLATION RATE
Time
(minute$11nchl
FT
&'ENGINEERS, INC.
7125 OLD SEWARD H'WY.
ANCHORAGE, ALASKA 99503
349 -6561
SOILS LOG -PERCOLATION TEST
LEGAL DESCRIPTION __
I
2
3
4
5
6-
7-
8-
9-
10-
11
14-
20-
COMMENTS
PERFORMED BY:
< ,z'7o $; t~ / %,o.,.,~
PERCOLATION RATE d/'*~ ('~g~' {m;fluUlllinCh!
TEST'RUN 6ETWEEN , FT AND ~ * FT
~- ~-~ =~: .... ,,.~..,..~ · ..
& ENGINEERS, INC.
7125 OLD SEWARD H'WY.
ANCHORAGE, ALASKA 99503
3~9-esm
TEST
SOILS LOG -PERCOLATION TEST
I
5
6
7-
8-
9-
1'1
I.I
Iii
Ill
III
Ill
III
II1~
I I1~
II1'
/Il
t_11
/.?J t
,. ,~, ~,fl I
-~ '
./,,
~ Kill
10-
I1
14-
15-
16-
~- /
18-
19-
20-
COMMENTS
PE~FORMEO 8¥:
WAS GROUND WATER
ENCOUNTERED~
IF YES. AT WHAT
DEPTH)
fle~d;ng
TEST'RUN OET1NEEN ,~t ,- FT AND "'7' . FT
/,~..//j..;..,~ ~,.,,D,..~..~.~ . ~-_~,
.* &' ENGINEERS, INC.
7125 OLD SEWARD H'WY.
ANCHORAGE, ALASKA 99503
349 -6561 ·
SOILS LOG .- PERCOLATION TEST
I I PERCOLATION
TEST
SLOPE SITE PLAN
I
5
6
7
8
9
I0
II
'12
'13
14
15
16
!7
18-
20-
WAS GROUND WATER
ENCOUNTERED?
IF YES. AT WHAT
DEPTH~
Read;rig
4
COMMENTS
PERCOLATION RATE
TEST'RUN BETWEEN
Time Time
/:/o I1-;.
I,'.~ o I~_~;..
I : q7 ~7~;..
;T ANO
(m;nule$llnch)
FT
· - ' : ENGINEERS, INC.
s
7125 OLD SEWARD HWY.
ANCHORAGE, ALASKA 99503
349 -6561
SOILS LOG -- PERCOLATION TEST
7
8
9
I0
11
'12
'13
14
PLAN
WAS GROUND WATER
ENCOUNTERED?
IF YES, AT WHAT
DEPTH~
P
Net Depth to " Ntt
T~me Water D,oP
15
16
~7
18-
'19 -
20-
COMMENTS
, ". J01
. SWANSON
)ROFESSIO~
PERCOLATION RATE
TEST'RUN BETWEEN
unicipa i of
POUCH 6-650
ANCHORAGE, ALASKA 99502-0650
(907) 264-4111
TONY KNOWLES.
~fA YOII
DEPARTMENT OF HEALTH AND ENVIRONMENTAL PROTECTION
March 16, 1983
James Sawhill
S & S Engineers, Inc.
7125 Old Seward Highway
Anchorage, Alaska 99502
Subject: S-6673 Dee~ Horn Subdivision
This will continue correspondence concerning the proposed
Deer }lorn Subdivision(S-6673) ending with your letter of
January 27, 1983.
We appreciate receiving the additional information contained
in your above referenced letter, and submit herewith the
following comments:
(1)
The curtain drain design and configuration should mitigate
the ground water problems in the southeast portion of the
proposed subdivision. We do suggest, however, that the
outfall of the curtain drain be extended well into the
drop-off portion of Lot 1,.which is approximately 150 feet
north of the south line of Lot i instead of the 80 feet
shown on y6ur map. There should also be a water monitoring
station on Lot 1 to determine if the curtain drain has
had any detrimental effect on Lot 1.
(2)
Your area and slope summary and plat coupled with the
available topography maps does indicate that there are
areas on Lots 3, 4, and 5 of sufficient size to support
the on-site disposal systems and replacements. This
assumption, of course, is contingent upon there being no
shallow groundwater underlying these areas. Assuming that
these areas(shaded areas) are to be used for on-site disposal,
then there can be no driveways, parking areas or construction
within these areas. This could present problems of access
to Lots 4 and 5 and to the building site on Lot 4, particularly
with the 100 foot creek setback restriction.'
James Sawhill
S & S Engineers,
March 16, 1983
Page Two
Inc.
(3)
Prior to final plat approval, monitoring of the ground
water(using the 1" perforated standpipe or other means
acceptable to the DHEP) in all eight(8) perc holes(or
monitoring stations) must be conducted at least once
each month for a three(3) month period. The final month
of this three(3) month period must fall between June 1
and October 15.
Should you have any further questions concerning our comments,
please contact this office at 264-4720.
Sincerely,
Robby Robinson
Environmental Engineering
Program Manager
RWR/ljw
cc: Jerry Weaver
Planning Department
Note: we are in dire need of the topography map for this area
T15N R1W Section 4
January 27,
S
& ENGINEERS, INC.
S W
7125 OLD SEWARD HIGHWAY · ANCHORAGE, ALASKA 99502
1983
John Lynn
Department of Health & Environmental Protection
825 L Street
Anchorage, Alaska 99501
REs Deer Horn Subdivision Preliminary Plat
Dear John:
Enclosed is the information you requested for approving
the prelim~nary plat of Deer Horn Subdivision. We have
slightly modified the plat to address the platting staff's
concerns on slope. We have completed an area and slope
table which we have also enclosed.
We have provided a curtain drain design sheet which
indicates our groundwater monitoring locations. My under-
standing is that a member of your staff noted groundwater at
a higher elevation on Lot 3, Block 2 than is noted on our
soils logs. We intend to install a monitoring pipe at this
location to verify this. If higher water is indeed noted we
will install a curtain drain in this area to handle the
problem.
We have provided a topo sheet which indicates areas
that meet the health requirements for septic systems. Each/
slope-effected lot has an area greater than 10,000 sgua~e
feet which is less than 25% slope.
If you have any questions or require any additional
information please call me at 349-6561.
Sincerely,
E~n~TnSeeSrawhill
JS:mbs
Job 2623
EAGLE RIVER ANCHORAGE HOMER
N
DEER HORN SUBDIVISION
contour map
N
DEER HORN SUBDIVISION
slope analysis for septic
systems:
LOT BLOCK AREA (LESS THAN 25~}
2 i 12,000 SF
3 2 11,000 SF
.4 2. 20,000 SF
5 2 12,000 SF
DEER HORN SUBDIVISION
AREA AND SLOPE SUMMARY
LOT
2
1
2
3
4
5
6'
7
BLK
1
1
2
2
2
2'
2
2
2
AREA R-W AREA TOTAL AREA SLOPE
(SQ. FT.) (ACRES)
29,000 12,150 41,150 .94 3.33
25,500 13,000 38,000 .87 12.57
27,715 3,450 31,165 .71 13.57
26,800 ·3,345 30,145 .69 10.85
39,000~9.__~_
_7,500
29,000
12,129 51,129 1.17' 14.51
~A
~'8i 68,481 ~1.'57-+~.~____1_6__.33~
3,250 32,250 .74· 2.98
28,000 9,270 37,270 .86 3.21
SLOPE CALCULATED USING R-10 FORMU'LA'
S = lXLX.0023 A
.... 5::'-'z.: ..
./
DATE:
TO:
FROM:
SUBJECT:
vt[, m p hty of
MEMORANDUM
February 4, 1983
Planning Department - Jo Ann
Health and Environmental Protection
Case #S-6673: Deer Horn Subdivision - Prelimimary Approval
This department has reviewed the revision of the subdivision
with the curtain drain design on the plat and other data, as
monitoring of water table, also, data addressing topography
and slope as to assure lots can support on-iste sewer systems.
This department can now approve the preliminary plat for
Deer tlorn Subdivision.
John W. Lynn
Environmental Specialist
JWL/ljw
91-010 (5/78}
Jan. 5, 1983
Mr. Jerry %;eaver, Planning Dept.
5-6567 l~er }lorn S
Ad(]~-n~ua to Comments of ll/15~q~_
This Department recommends a 100' setback easement from the
existing drainage course along thc northern boundary of the
proposed subdivision. This drainage course serves as the
primary drainage for a portion of the Deer Park Subdivision
and all of the Morth%~oods Subdivision.
The relnaining l~rtion of lots 4 and 5 lying outside of the
100' setback is situated on a 25% slope· Conventional on-
site waste water disposal facilities could not be utilized
under this severe slope condition.
There appear to be some discrepancies concerning the presence
of shallow ground water under a sizeable l~rtion of the pro-
posed subdivision. Thc Department reco~menns that additional
tests and ground water levels bc r~nitored on each proposed
lot at a test site approved by thc Department· These omserT
~shp~.~d_be_gond~ed duri_~3__thO-~er.iOd__Q~_Ap~ 1
~~Pt- 1, at a fr~-~a~-~%~y not to exceed 16 day~, so as
to allo%~ fo~-~tabilization of ground %;ater conditions.
This Department recommends that
held until the above conditions
preliminary approval be with-
are completely satisfied.
RCP.~I1/su/D29
Robert C. Pratt, Acting
..J M L LABORATORIES, INC.
· · 7127 Old Seward Highway · Anchorage, Alaska 99502
.'. SOIL AND MATERIALS TESTING
907-344-8551 "
LETTER OF TRANSMITTAL
............ :--TO: ....... ALASKA DEVELOPMENI CONSULTANTS:
ATTENTION:
SUBJECT:
OUR JOB NO.
An6horage, AK
STEVE WEATHERMAN
FOX'HILL (Triad)
83-347.39 (46A)
. Transmitted herewith is/are the following:
'Two Daily Reports - 347,39 da~ed 7/26/83:
347.46A dated 1119/83
-TRIAD ENGINEERING
JML LABORATORIES, INC.
DATE 12/28/83:
IIIGIIEBUIIo:'* = ~ ' ~':*: '"'?*~' "' ''-''~ - '** ':~ * *: :-,=-' ,',. ',., :.~ , i
AND ~SOCIATES INC.':~,~'::=~;~'";" .... '~ asn,~ ........ . ......
r I
· .:.,- I ' ~ ~ F~t"~ ' * -~--._.~.,, ~' -,:,'~--=-~.,, ".:. DATE. - ..~ *- ' ':-
F
R
0
M
DATE
MESSAGE
REPLY " ' - ' '
· SIGNED ......... ~ ............... ~, ...... , '
DETACH AND FILE FOR FOLLOW-UP