'~ Municipality of Anchorage Page !
Department of Health and Human Services
Division of Environmental Services
On-Site Services Secfio~ 825 'L' S~eet Room 502
P.O. Box 196650 Anchorage. AK 99519~650
wew.ct.anchorage.ak.us (907) 343-4744
ON-SlIE WASlEWAI~R DISPOSAL SYSTEM ANDIOR WELL INSPEClION REPORI
Permit Number: SW000242 PID Number: 011-122-33
Stacy & Heidi Tomuro WastewaterSystem: New
P.O. Box 190664 Anchorag% AK 99519 ABSORPTION FIELD
341-3332 Four (4) Deep Trench
LEGAL DESCRIPTION 1.2 c~e 10.5
2 6 Skyhills No. 3 3.5 F,. 7
9.5 F,. 37.5
Well: City Water o,,,~ ,.,~: 4 ..
F,. n 525 ~e ASTM D3034 PVC
.. Spinell Homes 8/11-14/00
· ,..:~-~,. i.,,,...~.,:.,, ic.~, ,~,~o.~,,.:.,~ TANK
SEPARATION DISTANCES E3 septic [-] Holding f-I S.T.E.P. l'-) Othec.
Tank FWd Sta~o. Tank S~-,~,U,~ Anchorage Tank 1,250
w., >200' >200' N/A N/A >25' Steel Two (2)
Mu.s~'"w~ >100'>5. >100'>10. N/AN/A N/AN/A ~ ~,,: LIFIo~STATION,~.~,~ - NONE ON LOT
~.,.~ >5' >10' N/A N/A *'~"~'~"~ ~'~"~"~
c~.,.~,None Noted ~""~°"'~
""='": BENCH MARK
Garage Slab
100.0
E~ginee~$ Stamp
Inspections performed by: Mike Anderson Dates: 1" 8/11/00 ,.
2~ 8/14/00
Department of Health and I-~.uman Services approval
I 2 --
.......... Municlp~lit~ of Anchorage ....
DEVELOPMENT SERVICES DEPARTMENT
4700 South Bragaw Street Anchorage, AK 99519-6650 - 343-7904
On-Site Wastewater Disposal System or Well Inspection Report
Permit Number SW000242
£VENSON COURT
PID NO. 011-122-33
LOT 2
75..'.'.%1'
20' l&[ £A.~[MENT
Page20~3 ' ~
LOT 6
29.6
Four
Bedroom
Home
A B
Sl 59.3 65.0
S2 68.3 73.5
C4 121.0 128.5
M1 122.1 125.5
C5 120.9 123.5
S1
C2
C3
Alternate Site THC
THB
SCALE 1" = 40'
LOT 7
Municipality of Anchorage
DEVELOPMENT SERVICES DEPARTMENT
4700 South Bragaw Street Anchorage, AK 99519-6650 - 343-7904
On-Site Wastewater Disposal System or Well Inspection Report
Permit Number $W000242
PID No. 011-122-33
Page 3 of 3
52.2
· 80~ 0
91 o0
· brainfield .l~ock ·
80.3
73.4
63.5
·i
PROFILE AS,BUILT
10'
Municipality of Anchorage
Department of Health & Human Services
825 L Street, Anchorage, AK 99502-0650
SOILS LOG * PERCOLATION TEST
Performed For:. StncyTemuro
Legal Description: Let 6. Block 2. Sky Hills. Phase III
SLOPE
Date Performed:
"g.'%. ^
,.%',,._~.' ._, -, -;~_~,
{:..'2.:~~~ .....................
...',3-~4-
SITE PLAN
8
9
10
11
12
13
14
15
16
17
18
OG~T
Fine Sand
Some Silt
SP
Was Groundwater
Encountered? No S
If Yet, What Depth? L
Depth to Water O
After Monitoring P
Date: E
Bottom of
Hole
Reading Date Gross Net Depth To Net
Time Time Water Drop
I 14-Aug 1:10 1"
2 1:20 10 6.13'
3 1'21 1.25"
4 1:31 10 6.25" 5'
5 1:32 1 ·
6 1:42 10 6" 5'
Perc. Rate: 2 Min./Inch Perc. Hole Diameter:. 6'
Test Run Between 4 Ft. and 5 FL
Comments: Percolation Cavity Presoaked Prior to Testing.
Performed By: Mike Andemon. I, ~ Certify That This Test Was Performed
In Accordance With Ail State and Municipal Guidelines In Effect On This Date: 8111100
Municipality of Anchorage -__
~ I~ r ~epartment o~
~ ~ Ih~blic Works
Bttildlng Safety Dn s on
P.O. Box 19GG50 * 4700 S. Bragaw Street
~Machoragc, Alaska 90519-C'G50 · (907) 843-8301
h t tp://wwxx-.cLm~cho~lgc.nk.us
6/8/2001
Stacy & Heidi Tomuro
PO Box 190664
Anchorage AK 99519
Subject:
On-Site Water and/or Wastewater Permit.
Permit Number: SW000242
Parcel ID: #011-122-33
Dear Staey & Heidi:
An On-Site Water/Wastewater Permit, number SW000242, issued by this office for a single-family
system, will expire on July 18, 2001. This permit was valid for 365 calendar days.
If this was a well permit and the well has been drilled, a well log must be sent to this office for
documentation of the installation and to close the permit.
If this permit was for a wastewater disposal system, an original as-built inspection report must be sent to
this office for review, approval and documentation. This as-built inspection report must be signed by
the licensed Professional Engineer who inspected the installation of the system. As-built inspection
reports are required to be submitted within 30 days of the completion of the system.
If no system was installed under this permit, and you are still planning to install a well or wastewater
disposal system, a new permit must be obtained from this office. A ne~v permit may be issued free of
charge for a second year if the application for the renewal is received on or before the date of expiration
of the original permit.
When applying for a new permit, the fees are: $320.00 for a wastewater permit and $120.00 for a well
permit.
If you have any questions, please call this office at 343-7904.
Manager
On-Site Water and Wastewater Program
enc: Copy ofpermit
ANDERSON ENGINEERING
P.O. BOX 240773
ANCHORAGE, AK 99524
522-7773 522-6779 (FAX)
-June 30,2000
Municipality of Anchorage
Department of Health and Human Services
825 "L" Street
Anchorage, AK 99502-0650
Subject: Lot 6, Block 2, Skyhills Subdivision, Phase Ill
Septic System Design and Permit Application
Impacts to Adjacent Properties
Dear Onsite Services Engineer:
The owner of Lot 6, Block 2, Skyhills Subdivision, Phase III intends to construct a four-
bedroom home on thelot. We are therefore applying for a permit to construct a new
septic system on the lot to serve the new house. The attached Site Plan and backup
documentation identify the location and configuration of the new septic system and the
parameters used in the design. The lot is served by the Municipal water system and
the system will be constructed a minimum of 10' from the water service line.
The test holes placed on the lot in October of iast year at the locations shown revealed
poody graded sand with some silt with a percolation rate of 2 minutes per inch.- No
groundwater was encountered in either test hole and none was found during the
ensuing water-monitoring period. We are therefore proposing to construct a deep
trench system with a maximum depth of 10.5' below the odginal ground surface. The
length of the trench will be 37' with an effective depth of 7'.
The ground surface on the lot slopes from nodh to south at varying slopes usually
sometimes as steep as 20%. The new system will be constructed parallel to the slope
in conformance with Municipal requirements at the flattest area on the lot. Effluent will
fall from the septic tank a total of 11' to the distribution pipe in the trench. The total
distance will be neady 70' and the slope of the line will be approximately 15%. Grading
will be accomplished once the system is completed so drainage is away from the trench
and septic tank but in the direction of the current drainage pattern. No surface water
will accumulate in the trench area.
If the system Is constructed 'in accordance 'with our design the following statements
apply:
1. The System, if constructed as designed, will have no adverse in, pact on the wells
in the area or those to be constructed in the future.
'2.
The system, if constructed as designed: will have no adverse impact on existing
septic systems in the area or those to be constructed in the future.
Lot 6, Block 2, Skyhills Subdivision, Phase III
'June 30, 2000
Page Two
The system, if constructed as designed, will have no adverse impact on reserve
space, either surface or subsurface, on any lots located in the area.
The system, if constructed as designed, will have no adverse impact on drainage
patterns in the area The current drainage pattern will be maintained..
Sincerely,
Michael E. Anderson, P.E.
Attachments
L
'N COURT '. :"'"'..... ' '"'.. _, __
';"-[ THIS PROJECT-
'h
: 20
19 - '
t
5
23'
- A - 24
"' ~ 1P 41,626 ~q. fL :
AREA MAP ~?p .~
". SCALE 1" = 100' \ ~"~' '
.'. .,.,..:::.':' .'....:..'.." '' :
· ~0.041 ~.fL
~®.'
41.573
'. 33
45.103
!8-3-A 28~
H89"~'28'£ 768,34'(R)
COURT
2
Four
Bedroom -'
House
Lye De'
TH
'! 190' I
,~ DRAINACE-.
LOT 6, BLOCK 2, SKYHILLS SUBDIVISION
PHASE III
DESIGN FACTORS:
SYSTEM REQUIREMENTS:
Four Bedroom Home
Parc. Rate: 2 Min./Inch
Application Rate: 1.2 GPD/SF
Deep Trench System
1,250 Gallon Septic Tank
7' Dralnfield Rock
4 Bedrooms X 150 GPD I 1.2 GPD/SF = 500 SF of Absorption Area
500 SF/14 SF/ LF of Trench -- 35.7 LF Trench Length
Therefore: Construct a Deep Absorption Trench System With One Lateral 36'
in Length with 7' of Dralnfleld' Rock Beneath the Distribution Pipe.
Distribution Pipe in Trench' Placed at 3.5' Below the Original Ground Surface.
Total Depth to be 10.5' From Original Ground Surface. Insulate or Mound Over
Trench to Provide a Minimum of 3' of Cover.
6';
'Natural
Backfill
Geotextile'
Fabric
Perforated
PVC (Slots Do~n)
,eld
Rock
I 3' I".
TYPICAL DEEP TRENCH SECTION
NOTE: Grade Area Over Trench ,o Drain Away.
Provide 3' Cover Over Trench and 4' Over Tank or I~Z~~ ~ _ .~¢~ .
Maintain 10' Separation From Lot Line. ~,~.~.(/~..%j/~~'' '* ....... %..~ .
Maintain 10' Separation From Water Service Line.
Municipality of Anchorage' '
Department of Health & Human Services
825 L Street, Anchorage, AK 99502-0650
SOILS LOG - PERCOLATION TEST .
Performed For:. Bob Klein
· Legal DescHp{i0n: Lot 6. Block 2_ Sky Hills. Phnse III
'SLOPE
OG/PT
1
11
Was Groundwater
' Encountered? No
If Yet, What Depth?
Depth to Water ;
Fine Sand After Monitoring None
Some Silt · Date: 10/10/99
SITE PLAN.
0% 10%
'12
· 13
;4
15
17
10
· SP
Bottom of
Hole
Reading Date Gross: Net DepthTo Net
·" Time Time' Water Drop
I 23-Sep 10:21 1'~
2 10:31 10 6" 5"
· 3 10:32 1.25'
4 10:42 10 6.25' 5'
5 10:43 - 1"
6 10:53 10 6" ' 5"
Perc. Rate: 2 Min.Jln~:h Perc. Hole Diameter: 6'
Test Run Between 7 FL and 8 Ft.
Comments: Percolation Cavity Presoaked Prior to Testing.
Performed By: Ed Sanderson, - . I, ~j.~ Certify That This Test Was Perform~ed
In Accordance With ,,cji State and Municipal Guidelines In Effect On This Date: 10/20/99
Municipality of Anchorage
Department of HeaRh & Human Services
825 L Street, Anchorage, AK 995020650
SOILS LOG - PERCOLATION TEST
Performed F~: Bob Klcin
Legal Description: Lot 6_ Block 2 Sky_ Hills.. Phase Ill
SLOPE
OG~T
Fine Sand
Some Silt
13
14
15
16
17
Was Groundwater
Encountered? ' No
If Yet, What Depth?
Depth to Water
After Monitoring. None
Date: 10/10/99
SP
Bottom of
Hole
S
L __0% - 10%
O
P
E
Reading Date Gross . Net Depth To Net
Time Time ~/ater Drop
I 23-Sep 9:15
2 · 9:25 · 10 5.75" 5'
3 9:26 · " · 1.25"
4 9:36 10 6.25" ' . 5'
· 5 9:37 1"
6 9:47 10 6' 5'
I
Perm Rate:. 2 Min./Inch ' . Perc.' Hole Diameter:. 6'
Test Run Between .7 Ft. and 8 FL
Comments: Percolation Cavity Presoaked Prior to Testing.
Performed B~,: ~ I. ~ Cer~fy That Thi,~ Test Was Performed ..
In Accordance With All State and Municipal Guidelines In Effect On This Dale: 10/20/99
ON-SITE WASTEWATER DISPOSAL SYSTEM
CONSTRUCTION AND MATERIAL SPECIFICATIONS
SUBJECT: LOT 6, BLOCK 2, SKYHILLS SUBDIVISION, PHASE III
GENERAL:
The scope of this project includes the procurement and placement of a
new 1,250 gallon septic tank at the location shown on the Site Plan. It
also includes the construction of a new 37' long x 3' wide x 7' effective
depth absorption trenches. Distribution pipe will be placed at 3.5'
below the odginal ground surface. The total depth from original ground
surface will be 10.5'. All components of the septic system must be a
minimum of 10' from the water service line serving the new house on
the lot.
Construction shall be in accordance with the approved site plan,
design drawings, Municipal Permit with any special provisions or
conditions, and all applicable State and Municipal Wastewater
Disposal Regulations.
The Contractor shall be responsible for obtaining all underground utility
locates and for the layout of the septic system and verification of the
location of all lot lines.
Unless specifically agreed otherwise, the contractor shall be
responsible for final grading areas subsequently depressed from soil
settling. Property owner shall be responsible for revegetation of
affected areas unless specifically agreed otherwise.
Contractors installing wastewater disposal systems must be certified
by the Municipal Department of Health and Human Services for
system installations. Owners installing their own systems must receive
prior approval from D.H.H.S. before beginning system installation.
SEPTIC TANK INSTALLATION
1. The new 1,250 gallon septic tank must be procured from an approved
source and installed at the location shown on the plans.
A septic tank is to be constructed by a certified septic tank
manufacturer. Construction shall include two 4" cleanouts for pumping
access.
3. The septic tank shall be sufficiently bedded to prevent settling or
shifting of the tank.
4. All standpipes on the septic tank shall extend a minimum of 12 inches
above final grade.
5. Tanks installed without 4' of ~:over shall have a minimum of 2" of direct
burial insulation.
A foundation cleanout shall be installed one to four feet from the
building foundation. Two cleanouts are required between the tank and
the drainfield.
Lot 6, Block 2, Skyhills Subdivision, Phase III
June 30, 2000
Page 2 of 3
7. Final grading over the tank shall be such that a positive slope exists
away from the septic tank.
DRAINFIELD CONSTRUCTION:
1. The drainfield shall be constructed to the dimensions shown on the
design. The bottom of the trench shall be within 2" of level.
Distribution piping must be placed level with perforations down atop a
level bed of drainfield rock. Rock should then be placed over the pipe
to provide a minimum of 2" of cover·
3. A silt barder or geotextile fabdc must be placed between the drainfield
rock and the natural soil backfill.
4. Monitor tubes must be 4" in diameter and installed at the locations
shown on the design. The portion below ground must be perforated.
Contractor shall vedfy the septic tank and drainfield are a minimum
100' away from any private water wells in the area, 150' from a Class
"C" Well or 200' from any community well.
Direct bury insulation must be placed over the distribution system if
less than 3' of backfill depth is available. Finish grade over the trench
must be mounded to prevent settlement or depressions.
7. Grade area surrounding the absorption trenches to drain away·
A minimum 2' of accepting soil is required below the drainfield rock for
a 5' wide trench. Contractor shall vedfy this condition pdor to
placement of the rock. All pockets of unacceptable materials must be
removed and replaced.
MATERIAL SPECIFICATIONS:
1. Septic tanks must be constructed by a municipally approved septic
tank manufacturer.
2. The following pipe materials are approved for use in septic system
installations in the Municipality of Anchorage:
Cast Iron (perforated and solid), ASTM D3034 or P.V.C. (perforated
and solid), ASTM F810 or H.D.P.E. (perforated, but not solid) and
ASTM D2662 or A.B.S. (perforated and solid).
3. Insulation shall be at least 2" thick extruded direct burial polystyrene
(Dow Chemical Co. Styrofoam HI or equal).
4. Septic tank inlets and outlets shall be fitted with watertight couplings
° (Caulder, Femco, or equal). '
Lot 6, Block 2, Skyhills Subdivision, Phase III
June 30, 2000
Page 3 of 3
5. A permeable geotextile fabric (Typar, Mirafi or equal) must be installed
between the final drain rock layer and the native soil layer.
6. All drain rock shall be .5" to 2.5" in diameter with less than 3% passing
the #200 sieve.
INSPECTIONS:
Municipal Ordinance requires a minimum of tWo inspections. These
inspections must be conducted under the supervision of a professional
engineer registered in the State of Alaska. The first inspection must be
conducted after the excavation of trenches, beds or pits and before the
installation of any gravel. A septic tank may be set in place, but may not
be backfilled.
The second inspection must be conducted after the placement of the
geotextile fabdc, gravel, distribution piping, standpipes, cleanouts and
insulation. No backfill should be in place at the time of inspection.
Contractor shall provide a copy of all field survey layout and construction
notes for use in preparing the certified as-built of the completed system.
ANDERSON ENGINEERING
P.O. BOX 240773
ANCHORAGE, AK 99524
522-7773 522-6779 (FAX)
MEMORANDUM
DATE:
TO:
FROM:
SUBJECT:
June 17, 2002
Jeff Poet
Mike Anderson, P.E.
Lot 6, Block 2, Skyhills Subdivision No. 3
Septic System As-Built
We resurveyed the septic system elevations for the s.u, bject lot and modified the as-built
accordingly. The septic tank has slightly more than 5 of cover. The water service line
has been added and a third test hole was completed near the end of the absorption
trench. All comments from your previous review have now been satisfied. Please let
me know if you have further questions.