HomeMy WebLinkAboutSHANGRI-LA LT 3 Municipality'of Anchorage .
Development Services Department
Budding Safely Division
On-Site Water and Wastewater Program. 4700 S. Bragaw SL
P.O. Box 196650 Anchorage. AK S951~-6650 Page
vMw.d, anchorage.ak, us (907) 343-7g04
ON-SITE WASTEWATER DISPOSAL SYSTEM AND/OR WELL INSPECTION REPORT
Permit Number: <~ ~ O O,5"~q PID Numbe~ ' O '?- O - C:>
.~m. DECt. O ~r'~~' Wastewater System: [] New [] Upgrade
~*'"' -7~ et7 Er'on ~,erey ~/.~ A~-6 99.r'oz ABSORPTION FIELD
PRone: Nun'.~ et
So~ Eadr~: Total Dep~ from
LEGAL DESCRIPTION I. ~.. ,,~,~,, . it. ¥ ~,.
O. ~ n.
Well: ~ New ~ Upgrade q~- ~' n. t ~ ~'
I
SEPARATION DISTANCES ~ Septic D Holding ~ S.T.E.P. D Othe~
To Septic AbsoCtion LiR Holding Pub~t~
'i
"'~'"" BENCH MARK
~o~ ~ / ~C~. Engineers St~mp
R~viewed *nd spproved by: ~ ~ Date: ~/3/~ "~' '
TBM
113'
PERMIT NO: SW030059
PAGE 2 OF 2
PID NO: 020-043-21
SWING TIES:
FROM: COR. "A" COR. "B" MON. "C" T.H. /~ ~.~
#
, TO:
S.T.C.O."D" ~24' 95' 92.5'
S.T.C.O. "E" 120' a2' 89'
DBL C O "F" t19' 8t' 87'
_ ~ T..c.o."~" .~' ~.s' ~' /~
~~ ~ ~,. ~.~. , ~ ~6 ~1 .~. l;~1~ /
~ ~R. C.O. 'T' 153.5' . 38' 45'
PROPOSED ' A
~ 12 AL N4.BDRM
00' FO~T LONG SOIL ~. TRENC
' ~ ~ ~ w, 7.6' G~VEL BELOW DIST. PIPE
WELL SITE . ~
P~N VIEW '~ ~.~o,~ ~. ~.~ ~
~,, ~-,~'.**...~' ~c.%~ ~.
3'+ SOIL COVER
BOT. TRENCH
PROFILE VIEW
NOT TO SCALE
~39-FOOT LONG
~SOIL ABS. TR.
7.6'
INV.
BOT. T.H. #1
ELEV. 84.1'
M.T. DRY 3/12/03
99.0
2'+ SOIL COVER
i1250.GALLON !: INV.
S?T,CTANKI ~ g9.2'
LOT 3, SHANGRI-LA S/D
SEPTIC SYSTEM INSTALLATION
AS-BUILT INSPECTION REPORT
FLATTOP TECHNICAL SERVICES
14530 ECHO STREET
ANCIIORAGE, ALASKA 99516
SCALE: AS NOTED
DRAWN BY TFM
JULY, 2003
FRO~I : ALPI~ DRILLING FAX NO. : c~37 345 02~2 Jul, 31 2003 ll:44APl PI
Borehole Data:
So~l Type, 'Fhiclmes.~ & Watrr Strata
Municipality-of Anchorage
Department of Health and Human Services
825 *L' Street
P.O. Box 196650 ^nchor~je, AJask$ 99519-6650
Rick Mystrom hRpltw~'w Ci. ancflomge, ak.u~
Mayor
Permit Number: #$W 030059 Date of Issue: 4-01-03
Date Started: 6-17-03- Date Completed: 6-18-03.
IA'gal Description: Sh~rRlr[Ja ..l_ot 3
Property Owner Name & Addr~s: Dean Ford
9441 Abbott Loop Road
Annotate, Ata. s.k.a 99504
Depth (ft) Method of Dtn'lllng [] air rotary
From To
Casing ~Ype:
Stick-up 0 J
gravelly cobbly silt 3 11
bedrock 11 347
Parcel Identification Number: 020-043-21
Is well k~.-.g~d at approved permit location? [] Y~ [] No
[] cable tool
Wall Thickness: .250 inches
Diameter:. _6 inches Depth: 20 feet
Liner Type: ~
Diameter: ~ inches Depth: feet
Casing stickup above ground: ~ feet
Static water level (fi-om ground level): 34 feet
Pumping level: 347 feet after
~ hours pumping ~ gpm
Recovery Rate: ~ gpm
Method of Te~ting: a/r t/~
Well Intake Opening Type:
[] Open End [] Open Hole
[] Screened Start ~ feet Stopped feet
[] Perforations S~'t ~ feet Stopped feet
Grout Type: benton~e_ ~anules Volume: I bg
Depth: Start 0 feet Stopped .9 fcct
Pump: Intake Depth feet
Pump size ~ hp Brand Name ·
Well Dbinfecte8 Upon Completion? [] Yes [] No
Method ofDbinfection: ch/odne toblets
Comment~:
Well Driller:. Alpine Drilling & Enterprises
PO Box 110496
Anchorage Alaska 99511
Attention: The well driller shall provide a well log to the property, owner within 30 days of completion and the property
MUNICIPALITY OF ANCHORAGE
Deve/opment Services Department
On-Site Water & Wastewater Program
4700 South Bragaw Street
P,O, Box 196650, Anchorage, AK 99519-6650
(907) 343-7904
4l:
ON-SITE WASTEWATER DISPOSAL SYSTEM I WATER SUPPLY PERMIT
Initial
Date Issued: Apr 01, 2003
Expiration Date: Mar 31, 2004
Permit Number: SW030059
Legal Description: SHANGRI ' LA LOT 3
Design Engineer: 0019 Flattop Technical Services
Owner Name: DEAN FORD
Owner Address: 9441 ABBOTT LOOP ROAD
ANCHORAGE, AK 99504-4221
Parcel ID: 020-043-21
Site Address: 9441 ABBOTT LOOP ROAD
Lot Size: 47685 SQ. FT.
Total Bedrooms: 4 Permit Bedrooms: 4
This permit is for the construction of:
r~ Disposal Field [] Septic Tank [] Holding Tank [] Privy
[] Private Well [] Water Storage
All construction must be in accordance with:
1. The attached approved design.
2. All requirements specified in Anchorage Municipal Code Chapters 15.55 and 15.65 and the State of Alaska
Wastewater Disposal Regulations ( 18AAC72 ) and Drinking Water Regulations ( 18AAC80 ).
3. The engineer must notify DSD at least 2 hours prior to each inspection. Provide notification by calling
(907) 343-7904 ( 24 hours ). ( Not required for a Water Supply Permit only ).
4. From October 15 to April 15, a subsurface soil absorption system under construction during freezing weather
must be either: A. Open and closed on the same day.
B. Covered, sealed, and heated to prevent freezing.
Received By:
Issued By:
Date:
Date: ~'~///0.~
Municipality of Anchorage
Development Services Department
Building Safety Division
On-Site Water and Wastewater Program
4700 South Bragaw St.
P.O. Box 196650 Anchorage, AK 99519-6650
www.ci.anchorage.ak.us
(907) 343-7904
ON-SITE SEWEPJVVELL PERMIT APPLIcATIoN
FOR A SINGLE FAMILY DWELLING
Parcel
Permit Number.SWO ~O0oZ-?'
Property owner(s)
Mailing address (1)
Mailing address (2)
p~m
'7'=/zo
Day phone
Zip Code
Legal description (Lot, Block & Sub'd.) ~ ;/' 2,, [,~ r;
Legal description (Section, Township & Range)
Lot Size ~' 7.~ 4 ~ Acre~ · Number of Bedrooms
THIS APPLICATION IS FOR:
Sewer Only
Sewer and Well
Sewer Upgrade
THIS PROPERTY CONTAINS:
Hot Tub
Swimming Pool
Therapy Pool
[] Well Only []
[] Water Storage []
[] Jacuzzi []
[] Water Softening Unit []
I certify that the above information is correct. I further certify that this application is being made for a
Single Family Dwelling and is in accordance with applicable Municipal Codes.
(Signature of property owner or authorized agent)
Permit Fees: ~0o ~-~.,e'-O ~
Date of Payment: ,.?///7 [ O ~
Receipt Number: 3 ~ "~'-'"~' ~'
(Rev. 1~00)
Waiver Fees:
Date of Payment:
Receipt Number:
C~ & EN~ON~NT~ ENG~EER~G · ENERGY CONSERVA~N ~
~IEO~RE F. MOORE, P.E. 145~0 ECHO
PH: (907) 3454355 ~CHO~GE, ~KA 99516
March 14, 2003
M.O.A. DSD
P.O. Box 19-6650
Anchorage, AK 99519
Dear Sirs:
The purpose 6fthis letter is to provide the required design narrative in support of our application for
a permit to construct waste~vater disposal facilities on Lot 3 of Shangri-La S/D, located on Sandpiper
Drive. Soils logs, perc test results, a site plan, design drawings and specifications are enclosed for your
review.
The prop6~ed system will be constructed in the vicinity of test hole # 1. As can be seen from the soil
log, the native material between 3.5 and 12 feet is a clean sandy gravel with a measured perc rate of less
than one minute per inch. Despite the rapid pere rate, the presence of sand between 12 and 18.5 feet
should provide adequate filtration of septic tank effluent to avoid the necessity of installing a sand filter.
Using the soil application rate of 1.2 gpd/sq, ft. specified in the wastewater ordinance, this proposed 4-
bedroom residence requires a total absorption area of(4 x 150)/1.2 = 500 square feet. The proposed 40-
foot long trench design with an effective gravel depth of 7.5 feet has a total absorption area of 600
square feet.
The topography of the lot in the area of proposed construction slopes do~m towards the north at
approximately 5%.
The proposed project will have no significant impact on present or future water supply and
wastewater disposal systems serving adjacent properties, nor will it have any significant impact on
reserved space-surface and subsurface, or on drainage.
Please give me a call at 345-1355 if you have any questions on this submittal.
Sincerely,
Ted Moore, P.E.
SITE FOR SIMILAR
................................... INSTALL '--J '/-~115 5"~-
LOT3 1250-GALLON-- ,? ~---I~ .... --
..~,S.F~PTIC TAN K
............ ~
,, ~ ~ ss.~,~ CONST~UOT ~ ~OT~
/ <~ ~ ~,' 'X ~OOTLON~ ~AOA,~
,' /.d ~/~~ '~ /S°~L A~S. m. ,
/" ~' ~~ ~
~ R100' ~ DRY 1~ BG~
', PROPOSED / /
',f .........................
,, SANDPIPER DRI~
LOT 8 LOT 9
~ACAN~ ~ACAN~
~,.' ,{ '.~'~,, LOT 3, SHANGRI-~ SlD
? 49~ 1,'~ 5*; ~ WELLAND SEPTIC SYSTEM
****************************~z SITE P~N
~ % ~H~ODO~ F ~E ~ ~ F~OP ~Cl~ICAL SERVICES 1 INCH = 50 FEET
V:..:'- .... 14530 ECItO S~EET D~WN BY TFM
ANCIIO~G~ A~S~ 99516 ~RCH, 2~3
'~G~.t" NOTE: THIS IS NOT A SURVEYED P~T.
ALL LOCATIONS SHOWN ARE APPROXIMATE.
CONSTRUCT 40-FOOT LONG
SOIL ABSORPTION TRENCH --
W. 7.5' EFFECTIVE GRAVEL
4" DIA. F-810 PERF.
INSTALL
SEPTIC TANK
4" DIA. D-3034
NON-PERF. PIPE
40
~4" D-3034 FROM HOUSE
(INSULATE UNDER DRIVE)
DBL. C,O.~
PLAN VIEW
SCALE: 1" = 10'
TUBE
4" DIA. F-810
PERF. PiPE
- 2 1/2 SEWER GVL.
CROSS-SECTION "A" - "A"
SCALE: 1" = 5'
LOT 3, SHANGRI-LA S/D
SEPTIC SYSTEM INSTALLATION
PLAN AND CROSS-SECTION
FLATTOP TECHNICAL SERVICES
14530 ECHO STREET
ANCIIORAGE, AK, 99516
SCALE: AS SIlOWN
DRAWN BY: TFM
MARCH, 2003
JTESTHOLEtf ] J
FLATTOP TECHNICAL SERVICES
14530 ECHO ST.
ANCHORAGE, ALASKA 99516
SOILS LOG - PERCOLATION TEST
LEGAL DESCRIPTION: Lq t_3~_S h_a _ng d_- La_S~D
DATE PERFORMED: Maml~5~2003
PERFORMED FOR: DeanEord
DEPTH
(feet) Pt.
1
SM Reddish sandy loam
2
GM Coarse gray silty gravel
GP Coarse dean black sandy gravel
Many cobbles and boulders
Sidewalls relatively stable
SLOPE
10-
Depth to Groundwater
;-'~N o~g r0un~dwate r_
Monitor__tube_dry.__
Date
_3/5/03 .
3/12/03
SLOPE -'; · --
15-
16-
18 -i
COMMENTS:
SP/GP Coarse gravelly sand
Many cobbles and bouldem
Lenses of cleaner sand
Date Clock Net Time Percometer Net Drop
Reading Time (minutes) Reading (inches)
J_.~/~5 5-.~a!!0 .n_pres0a_k 12L40:_50 21 3/8
12:_4_1 :_50 1 !.672
5-~al[0n resoak 12:44 23 _3~8
#1 ' 12:35 1 !9_ ' 4 3j8
~ 12:_46 I 16.7./8 2-1_J/8 '
~3_ 12:46:3o j, 1/2 16 1__~ dry
PERCOLATION RATE <<1 (minutes/inch) PERC HOLE DIAMETER 8"
TEST RUN BETWEEN 5.0 FT AND 5.5 FT
__SP. materi~al includin_g_d, ear]_sa_n.d I__e_n_ses.sb0u!~.p_rqvi~_de_adequat. e_ fi_~ltmtio._nto._aK0id__n_eec~_for i___mp0~ed_saqd filter
PERFORMED BY FLATTOP TECHNICAL SERVICES. I~'.g~/f' ~ CERTIFY THAT THIS TEST WAS PERFORMED IN
ACCORDANCE WITH ALL STATE AND MUNICIPAL GUIDELINES IN EFFECT ON THIS DATE, DATE:
q~l~ttop TocI~nical $~
14530 Poc~ Street, A~cboroOe, AK 99516
Pltone (907) $45-1355
Lot 3, Shangri-La S/D
Sandpiper Drive
Wastewater Disposal System Installation
Specifications
1.0 General:
1.1 The scope ofthe project consists of installing a 1250-gallon septic tank that discharges into a
40-foot long soil absorption trench containing a total of 8 feet of sewer gravel.
1.2 Construction shall be as depicted on the approved site plan and design drawings. Minor
deviations from these drawings may be allov~ed or required by the engineer conducting the inspections.
All construction procedures and material specifications shall conform to Municipal and State
requirements. All separation distances shall be in confo,mance with Municipal requirements, unless
specifically waived.
1.3 The contractor shall be responsible to obtain any necessary utility locates, and to work around
any buried utilities.
1.4 The contractor shall provide adequate cover material and rough grading over all system
components to ensure that proper drainage is achieved after settlement and that there are no residual
depressions. Insofar as possible the contractor shall minimize damage to trees and existing lawn areas.
1.5 Unless specifically agreed otherwise, the homeowner shall be responsible for finish grading
after the soil is compacted, as well as placement of topsoil and reseeding all areas disturbed by the
construction.
2.0 Septic Tank:
2.1 The new 1250-gallon, 2 compartment septic tank shall be Municipally approved and shall be set
level on undisturbed soil. Each compartment shall be equipped with a watertight manhole cover and a
4" cleanout. Ifthe tank is buried less than 4 feet, it shall be insulated with 2 inches of approved burial
type, rigid insulation.
2.3 All pipe connections to the tank shall be equipped with waterproof mechanical couplings. The
waste line from the residence to the septic tank shall have a minimum slope of 1/4'" per foot, and the
waste line between the tank and the soil absorption system shall have a minimum slope of 1/8" per foot.
A cleanout shall be installed 1 - 4 feet from the building foundation, and a double cleanout shall be
installed within 5 feet downstream of the septic tank. All portions of the sewer line that pass under the
driveway and parking areas shall be insulated with 4 inches of rigid, burial type foam insulation.
3.0 Soil absorption system:
3.1 The soil absorption system shall be constructed by excavating a 40-foot long trench to a depth of
12.0 feet below original ground level. Ifthe alignment ofthe trench does not follow an existing contour
of the land, the maximum depth of the trench at the south end shall be 12.5 feet.
3.2 The bottom of the excavation shall be level. Any compacted or smeared surfaces shall be raked
to alloxy proper infiltration. Sand for leveling or serving as filter material shall comply with Municipal
specifications.
3.3 A total of 8.0 feet of approved sewer gravel shall be placed in the bottom ofthe excavation with
the perforated distribution pipes laid level such that the pipe inverts are no less than 7.5 feet above the
bottom of the sewer gravel. Sewer gravel shall be 0.5" - 2.5" screened gravel, with less than 3% passing
the #200 sieve.
3.4 Monitor tubes and cleanout pipes shall be of 4" diameter and installed in the locations shown on
the design drawings. The portion of the monitor tube extending through the sewer gravel shall be
perforated.
3.5 Approved filter fabric shall be placed over the entire top surface of the sewer gravel. A
minimum of 2 feet of soil cover is to be placed over the filter fabric. If the soil cover thickness is less
than 3 feet, two inches of rigid, burial type insulation is to be placed over the entire top surface of the
gravel, in addition to the filter fabric.
3.6 The top surface of the cover material shall be raised a minimum of 6 inches higher than the
surrounding terrain to allow for subsequent settlement, and shall be graded to smooth contours. Fill
slopes shall be no steeper than 3:1.
3.7 Unless specifically agreed otherwise the homeowner shall be responsible for arranging to have
the site finish graded after the backfill material has stabilized, and for placement of adequate topsoil and
seed to promote rapid revegetation of all areas disturbed by the construction.
4.0 Inspections:
4.1 A total of 4 engineering inspections will be required during the course of the project: (1) initial
stakeout with the contractor to establish the location ofthe system and to discuss the plans,
specifications and construction procedures, (2) after the native material has been excavated to expose the
infiltrative surface to ensure that it is level and at the right elevation, and conforms with the soil test
information, (3) after the sewer gravel is in place and the distribution pipes have been laid and connected
up to the septic tank, but prior to placement ofinsulation or filter fabric, and (4) after rough backfill and
grading is complete. The septic tank requires one inspection after it is set level and the piping
connected, but prior to backfill. This inspection may be incorporated with any of the above inspections.
4.2 The installer shall coordinate the timing of the inspections with the engineer sufficiently far in
advance to ensure the availability of the engineer.
Al 3ine,Drilling & Enterprises INVOICE
i Domestic- Commercial '.' :.i b
Pump&~. O. Box Water ,1049~ Systemsf -°l~Te ~°ca'i°n
Anchorage, Alaska 99511
TO= ~q y~ ~ri- Lq
QUAN i ~; Y DESCRIPTION AMOUNT
~ot ~" I,Ootex' k)d~ L~,Ilin,~
L~BOR HOURS I::IAI'E AMOUNT TOTAL MATERIAL
TOTAL LABOR
PAY THIS AMOUNT ~'100
Thank You ~. ~ C~
(I Hereby Acknowledge ltte Sa~s~aCtoty Completion ol lhe Above Desc..dbed Wo~k.) [.0~ ~
TERMS: ACCOUNTS PAYABLE AT lOTH OF MONTH FOLLOWING PURCHASE.
SERVICE CHARGE AT RATE OF 1.5% PER MONTH WILl. BE CHARGED ON OVERDUE ACCOUNTS.
poxcel i.t>. ~ oao-oq~ol