HomeMy WebLinkAboutMOUNTAIN PARK ESTATES BLK 8 LT 4Mountain Park
Estates
Block 8
Lot 4
#017-39! -38
Municipality of Anchorage
Development Services Department
Buitdi~ Safety Division
On-Site Water and Wastewater Program, 4700 S. Bragaw SL
P.O. Box 196650 Anchorage, AK 99519-6650
www.cJ.ancherage.ak.us (907) 343-7904
O
Page I of '~
ON-SITE WASTEWATER DISPOSAL SYSTEM AND/OR WELL INSPECTION REPORT
Permit Number: S [4~ O Z O '~ ~'~'
LEGAL DESCRIPTION
Su~Msi~
Range: S~
Yield:
Well: [] New [] Upgrade
Classification (Private, A, e, C): Total Depth: Cased
~¢3'1~ ~ ~""~::~"~-, 3 ~ 7 Ft. I ~ / FL
SEPARATION DISTANCEs
TFrom'~..,~ Septic AbsorpUen
Tank Field
we, lob/~ 1~7
Curtain Drain
Remarks:
PID Numberi Ot '7 - 3'5~/ - '~o~
Wastewater System: [] New [] Upgrade
ABSORPTION FIELD
E] Other:
11. ,~ Pt.
9. Y
Gmvd Le~
Ft. ~ ~
TANK
[] Septic [] Holding ~ S.T.E.P.
[] Other:
Li~ Holding
Station Tank
-
Pub[idPfivat~ Manufacturer, Capacity:
Material: Number of Compartments:
->'z,r" £ Fce t '7_
V..:: LIFT STATION
Size: Manufacturer,
/~ 'Pump or level at: I High water alarm at:
Pump Make & Model Elect~l
/ ~ 0.~1 I/~,. ~/0 Inspectionsperfc?edby:~f.~
BENCH MARK
Lcc3!ion and Desc~ptJcn:
Assumed Elevation:
Inspections performed by: Fl~-~f T¢_c.4 ..,C'~'C Dates: 1
D ovelopmen~.Sery. ,~e.~Dopa~rnen.t Ap, royal
(,R..,.ev, i:.,eo~ed 8 nd ap p roved by: ~-~¢~ Date: J2//
Engineer's Stamp
e I . OR .
/
PERMIT NO: SW020266
LOT 4
BLOCK 8
PID NO: 017-391-38
DRIVE
PAGE 2 OF 2
"'"A~,'
TBM , '..',, '~ .... , . . .
\ ~__lS00-C~L -. ,, ,
· ~STEP TANK ''- ', FROM: COR. "A" COR. "B'
~ '" -.. '~ TO:
T - ~1.25" ~ S.T.C.O. "C" 13.5' 56.5'
'~'~ ~PVC ~~ R 100' ...,~~ ST ~H"D" t9' .... 66'
~ T.H. -- , .....
'. TR. M.T. E 73 92
~LL~.~L~J ~ , -. TR. M.T. "F" g0' 58.5'
''~:~'j_ ~, ~ -''... ,/ / w. 9.4' EFF. G~VEL
SCALE. 1~.~ ~U , -..., ~ ~~ ,,,,o.
":'-'"':~ ' BOT. TR.
ELEV. 1~.8'
4'+ ,SOIL
COVER BOSOM T.H. ~1 18.25' B.G.L.
~WATER ~ 16,16' B.G.L. 718102
INV. INV.
94.1' 94.2'
CROSS SECTION
NOT TO SCALE
LOT 4, BLOCK 8, MOUNTAIN PARK ESTATES
SEPTIC SYSTEM INSTALLATION
AS-BUILT INSPECTION REPORT
FLATTOP TECHNICAL SERVICES
14530 ECHO STREET
ANCHORAGE, AK 99516
SCALE: AS NOTED
DRAWN BY TFM
NOVEMBER, 2002
Rick Mystrom
Mayor
Municipality of Anchorage
Department of Health and Human Services
825 "L" Street
P.O. Box 196650 Anchorage, Alaska 99519-6650
http:tlwww.ci,anchorage.ak, us
Permit Number: #SW 020266 Date of Issue: 8-1-02
Date Started: 8-26-02 Date Completed: 8--29-02
Legal Description:
Property Owner Name & Address:
Parcel Identification Number: 017-391-38
Is well located at approved permit location? [] Yes [] No
Mountain Park Estates
Gene Richardson
PO Box 232171
Anchorage, Alaska 99523
' Borehole Data: Depth (ft)
Soil Type, Thickness & Water Strata From To
stick-up 0 2
silt 2 11
gravelly silt 11 42
gravelly sandy silt 42 47
gravelly silt 47 134
gravelly sandy silt wet 134 138
bedrock 138 307
Method of Drilling [] air rotary [] cable tool
Casing type: steel
Wall Thickness: .250 inches
Diameter: _6 inches Depth: 141 feet
Liner Type: ~
Diameter: ~ inches Depth: ~ feet
Casing stickup above ground: _2 feet
Static water level (from grOund level): 135 feet
Pumping level: 307 feet after
2 hours pumping -7 gpm
Recovery Rate: _7 gpm
Method of Testing: a__/r
Well Intake Opening Type:
[] Open End [] Open Hole
[] Screened Start ~ feet Stopped ~ feet
[] Perforations Start ~ feet Stopped ~ feet
Grout Type: bentonite # 8 Volume: 1 bgs
Depth: Start O feetStopped ~ feet
Pump: Intake Depth ~ feet
Pump size ~ hp Brand Name ~
Well Disinfected Upon Completion? [] Yes ~-] No
Method of Disinfection: chlorine tablets
1gpm 140 145
Comments:
Well Driller:
Alpine Drilling & Enterprises
PO Box 110496
Anchorage Alaska 99511
Attention: The well driller shall provide a well log to the proPerty owner within 30 days of completion and the property
RightFA~
1012312002 6:06 PAGE 171 RightFAX
Znspectlon Report
Municipality of Anchorage, Building Safety Division
4700 South Bragaw
[NSPECTZON: VOZCE 343-8300 ZNSPECTZON: FAX (g07)24g-7777
Name
Address
Legal
Subdivision
Comments or Directions
GENE P~CHARDSON
5900 BRISTOL DR
BK8 LT4
MOUNTAZN PARK ESTATES
CALL 30 MIN B4 TO MEET
[NFO: 343-8211
Permit 02-1060
Phone 350-8788
Inspection Date 10/23/2002
Xnspectlon Rough Electrical
[] NO NON¢OMPUANCE OBSERVED
~"~[] CORRECTIONS ESSENTIAL AS EXPLAINED BELOW
[] WILL RE-EXAMTNE AT NEXT
INSPECTION []
COMMENTS: (for inspector use only)
Relmpectlon N
DO NOT CONCEAL UNTIL REINSPECTION
MUNIC/PALITY OF ANCHORAGE
Development Services Department
On-Site Water & Wastewater Program
4700 South Bragaw Street
Box 196650, Anchorage, AK 99519-6650
(907) 343-7904
ON-SITE WASTEWATER DISPOSAL SYSTEM / WATER SUPPLY PERMIT
Initial
Date Issued: Aug 01, 2002
Expiration Date: Aug 01, 2003
Permit Number: SW020266
Legal Description: MOUNTAIN PARK ESTATES BLK 8 LT 4
Design Engineer: 0019 Flattop Technical Services
Owner Name: Gene Richardson
Owner Address: PO Box 232171
Anchorage, AK 99523-
Parcel ID: 017-391-38
Site Address: 005900 BRISTOL DR
Lot Size: 20400 SQ. FT.
Total Bedrooms: 4 Permit Bedrooms: 4
This permit is for the construction of:
[] DisposaIField [] Septic Tank [] Holding Tank [] Privy
[] Private Well [] Water Storage
All construction must be in accordance with:
1. The attached approved design.
2. All requirements specified in Anchorage Municipal Code Chapters 15.55 and 15.65 and the State of Alaska
Wastewater Disposal Regulations ( 18AAC72 ) and Drinking Water Regulations ( 18AAC80 ).
3. The engineer must notify DSD at least 2 hours prior to each inspection. Provide notification by calling
(907) 343-7904 ( 24 hours ). ( Not required for a Water Supply Permit only ).
4. From October 15 to April 15, a subsurface soil absorption system under construction during freezing weather
must be either: A. Open and closed on the same day.
B. Covered, sealed, and heated to prevent freezing.
Received By:
Issued By:
Parcel I.D.
Municipality of Anchorage
Development Services Department
Building Safety Division
On-Site Water and Wastewater Program
4700 South Bragaw St.
P,O. Box 196650 Anchorage, AK 99519-6650
www.ci.anchorage.ak.us
(907) 343-7904
ON-SITE SEWER/VVELL PERMIT APPLICATION
FOR A SINGLE FAMILY DWELLfNG
Permit Number SW C)Z.O ~d)$
Property owner(s)
Mailing.address (1)
Mailing address (2)
Legal description (Lot, Block & Sub'd.) Lo J' ¥/
Legal description (Section, Township & Range)
Lot Size ~ L'JDO Acre ¢,~q. Ft. }
THIS APPLICATION IS FOR:
Sewer Only
Sewer and Well
Sewer Upgrade
THIS PROPERTY CONTAINS:
Hot Tub
Swimming Pool
Therapy Pool
Day phone
Zip Code
Number of Bedrooms
[] Well Only []
[] Water Storage []
[] Jacuzzi []
[] Water Softening Unit []
[]
1 certify that the above information is correct. I further certify that this application is being made for a
Single Family Dwelling and is in accordance with applicable Municipal Codes,
(Signature of property owner or authorized agent)
Permit Fees: 1 ~0 ~ ~ C,'O ="~".,,z"O Waiver Fees:
Date of Payment: ~ '7" .,,,~O/-O,,,Z, Date of Payment:
Receipt Number: ..,,'~ ~ ~ ~) ~ Receipt Number:
(Rev. 12/00)
CIVIL & ENVIRONMENTAL ENGINEERING · ENERGY CONSERVATION & ANALYSIS
THEODORE F. MOORE, P.E.
PH: (907) 345-1355
M.O.A. DSD
P.O. Box 19-6650
Anchorage, AK 99519
July 27, 2002
14530 ECHO ST.
ANCHORAGE, ALASKA 99516
Dear Sirs:
The purpose of this letter is to provide the required design narrative in support of our application for
a permit to construct wastewater disposal facilities on Lot 4, Block 8, Mountain Park Estates, located at
5900 Bristol Drive. Soils logs, peru test results, a site plan, design drawings and specifications are
enclosed for your review.
The proposed system will be constructed in the vicinity of test holes #1 and #2. As can be seen from
the soil log, the native material between 2.5' and 11 feet varies from a sandy silt to a silty sand with
measured pert rates of 16 - 24 minutes per inch. Using a slightly conservative soil application rate of
0.45 gpd/sq, ft. this proposed 4-bedroom residence requires a total absorption area of(4 x 150)/0.45 =
1334 square feet. The proposed 75-foot long trench design with 9 feet of effective gravel has a total
absorption area of 1350 square feet.
The topography of the lot in the area of proposed construction slopes down towards the north at 35%
until it flattens out to form the low-lying northern portion of the lot. Because of concerns about possible
seasonal high groundwater levels in the low-lying portions of the lot, I have designed the absorption
trench to be positioned up on the higher slope with the long axis paralleling a natural contour of the la~d.
This, of course, necessitates the use ora STEP tank to pump effluent up into the trench. We are
requiring the contractor to provide fill as necessary to ensure that an imaginary line projecting
downwards at 25% from the top of the sewer gravel does not daylight within 35 feet.
The proposed project will have no significant impact on present or future water supply and
wastewater disposal systems serving adjacent properties, nor will it have any significant impact on
reserved space-surface and subsurface, or on drainage.
Please give me a call at 345-1355 if you have any questions on this submittal.
Sincerely,
Ted Moore, P.E.
WELL--
LOT 2
BOCK 8
R 100'
R 100'
t
,, ,, BLOCK 8
, ~ R 100'
DRIVE
"<- ~ ' OT 16, BLOCK
, ,' ,,--.~.O/. O~/~.~ "'"",~ACANT)
PROP.
/ LOT
LOT 3
BLOCK 8
500-GAL
1.25" PVC--
SITE FOR SIM. . ...-..s ...
REPL. TRENCH '~,__#
_-_-_ -_-_-_-_s T.H. ";
1
#2
LOT 22 75-FOOT LONG
BLOCK 8
9.0' EFF. GRAVEL
LOT 21
BLOCK 8
SEPTIC
AREA
,,'" ,r'I~,. '"-,
,,,' / ',,, ,
,' / ,~ ~
,,'/ ~ iR JP~Ex ~7
, t ',
/~x -~,~[~ / ,,
LOT 5
BLOCK 8
N
SEPTIC
AREA
LOT 20
BLOCK 8
(VACANT)
LOT 4, BLOCK 8, MOUNTAIN PARK ESTATES
PROPOSED WELL AND SEPTIC SYSTEM
SITE PLAN
FLATTOP TECHNICAL SERVICES 1 INCH = 50 FEET
14530 ECHO STREET DRAWN BY TFM
ANCHORAGE, ALASKA 995J 6 JULY, 2002
NOTE: THIS IS NOT A SURVEYED PLAT.
ALL LOCATIONS SHOWN ARE APPROXIMATE,
FOUNDATION C.O. ~
4" DIA. D-3034 FROM HOUSE
1500-GALLON
STEP TANK
~ 75-FOOT LONG SOIL ABSORPTION TRENCH
1.25 DI.A,. SCHED. 40 PVC ~ / ~ ~
~ %,,,~. PLAN VIEW
~ . ~- ~ SCALE: 1"
~°" 4" DIA. MON. TUBE
~z 2' SOIL COVER
PROVIDE ADDITIONAL FILL AS NECESSARY 1~_~
TO CR~TE 25% SLOPE SURFACE FROM / ~
f ............
1/2" - 2 1/2" SEWER
BOTTOM OF EXCAVATION
CROSS-SECTION "A - A"
SCALE: 1" -- 5'
LOT 4, BLOCK 8, MOUNTAIN PARK ESTATES
SEPTIC SYSTEM CONSTRUCTION
PLAN AND CROSS-SECTION
FLATTOP TECHNICAL SERVICES SCALE: AS SHOWN
14530 ECHO STREET DRAWN BY: TFM
ANCHORAGE, AK, 99516 JULY, 2002
TEST HOLE
FLATTOP TECHNICAL SERVICES
14530 ECHO ST.
ANCHORAGE, ALASKA 99516
SOILS LOG -- PERCOLATION TEST
LEGAL DESCRIPTION: Lot 4, Block 8, Mountain Park Estates
DATE PERFORMED: July 1, 2002
PERFORMED FOR: Gene Richardson
DEPTH i~
(feet) ~ Pt.
1-
SM Reddish sandy loam
2-- Dry
ML/SM Light gray sandy silt
Damp, sidewalls smear
Drier w. depth
Pockets of sandier material
SLOPE
T.H. T.H.
11
12--
13--
14--
SM Gray silty sand
Cleaner w. depth
Damp @ bottom
15--
ater seep
16 Sandy silt
17 Wet
18
18.25 B.H.
19--
Depth to Groundwater Date
Seep ~..15' - 6" 7/1/02
Water @ 16' - 2" 718102
Date Reading
7/01 12" Presoak
Resoak
, Start
#1
Add water
#2
Add water
#3
0% i~. ~
SLOPE :
Clock
Time
3:30:30
4:00:30
4:01
4:31
4:31:30
5:01:30
IPercometer Net Drop
Net Time ~
(minutes) Reading (inches)
27 3/8
27 3/8
23 3/8
30 21 5/16 2 1/16
23 1/2
30 21 9/16 1 15/16
23 9/16
30 21 11/16 1 7/8
20--
COMMENTS:
PERCOLATION RATE 16 (minutes/inch)
TEST RUN BETWEEN 8.5 FT AND 9.0
Due to high silt content in soil, use 0.45gpd/sq. ft. for design soil application rate.
PERC HOLE DIAMETER
FT
PERFORMED BY FLATTOP TECHNICAL SERVICES. I F,-~ ~ CERTIFY THAT THIS TEST WAS PERFORMED IN
ACCORDANCE WITH ALL STATE AND MUNICIPAL GUIDELINES IN EFFECT ON THIS DATE. DATE: "~ / '2__ '~ t~ ~ ~.
TEST HOLE # 2
LEGAL DESCRIPTION:
DATE PERFORMED:
PERFORMED FOR:
DEPTH
(feet)
2--
3--
7
8--
10--
18
FLATTOP TECHNICAL SERVICES
14530 ECHO ST.
ANCHORAGE, ALASKA 99516
SOILS LOG -- PERCOLATION TEST
Lot 4, Block 8, Mountain Park Estates
July 1, 2002
Gene Richardson
Pt.
SM Reddish sandy loam
SM/ML Dark gray gravelly silty sand
Variable texture
Does not smear
SLOPE
:
· i
Depth to Groundwater
No water
Monitor tube dry
Date
7/1/02
7/8/02
ML/SM Dark gray sandy silt
Very little gravel
No water
Date
7/01
Reading
12" Presoak
Resoak
Start
#1
Add water
Add water
SITE PLAN
T.H. T.H.
Clock
Time
3:39
4:09
4:09:30
4:39:30
4:40
5:10
: 35%~
0% /
Net Time Percometer Net Drop
(minutes) Reading (inches)
31
27
30 25 3/4 1 1/4
27 1/8
30 25 15/16 1 3/16
27 1/8
30 25 7/8 1 1/4
19--
20--
COMMENTS:
PERCOLATION RATE 24 (minutes/inch)
TEST RUN BETVVEEN 5.75 FTAND 6.25
Due to high silt content in soil use 0.45 gpd/scl, ft. for design soil application rate.
PERC HOLE DIAMETER
FT
PERFORMED BY FLATTOP TECHNICAL SERVICES. I~-~"'/,J..~..,~[- ~ CERTIFY THAT THIS TEST WAS PERFORMED IN
ACCORDANCE WITH ALL STATE AND MUNICIPAL GUIDELINES IN EFFECT ON THIS DATE. DATE: -;7 / 2 '7 / ~ ~.
~Ffattop CTecfmicaf Services
14530 ~,c[io Street, ~nc~orage, 91~ 99516
Lot 4, Block 8, Mountain Park Estates
5900 Bristol Drive
Wastewater disposal system installation
Specifications
1.0 General:
1.1 The scope of the project consists of installation of a 1500-gallon STEP tank that pumps effluent
through a 1.25" diameter PVC pipe up to a 75-fo0t long soil absorption trench containing a total of 9.25
feet of sewer gravel.
1.2 Construction shall be as depicted on the approved site plan and design drawings. Minor
deviations from these drawings may be allowed or required by the engineer conducting the inspections.
All construction procedures and material specifications shall conform to Municipal and State
requirements. All separation distances shall be in conformance with Municipal requirements, tmless
specifically waived. Prior to the start of construction the property owner shall arrange for a
surveyor to accurately mark the west property line in the vicinity of the proposed trench.
1.3 The contractor shall be responsible to obtain any necessary utility locates, and to work around
any buried utilities.
1.4 The contractor shall provide adequate cover material and rough grading over all system
components to ensure that proper drainage is achieved after settlement and that there are no residual
depressions. Additional soil material shall be placed as necessary to ensure that a 25% downward
sloping line projecting outward from the top of the sewer gravel does not daylight within 35 feet of
the absorption trench.
1.5 Unless specifically agreed otherwise, the homeowner shall be responsible for finish grading
after the soil is compacted, as well as placement of topsoil and reseeding all areas disturbed by the
construction.
2.0 Septic Tank:
2.1 The new 1500-gallon, 2 compartment STEP tank shall be Municipally approved and shall be set
level on undisturbed soil. Each compartment shall be equipped with a watertight manhole cover and a
4" cleanout. If the tank is buried less than 4 feet, it shall be insulated with 2 inches of approved burial
type, rigid insulation.
2.2 All pipe connections to the tank shall be equipped with waterproof mechanical couplings. The
waste line from the residence to the septic tank shall have a minimum slope of 1/4'" per foot. A
cleanout shall be installed 1 - 4 feet from the building foundation
3.0 Lift station:
3.1 The lift station shall be installed in the second compartment of the STEP tank which has an
additional 250 gallon capacity. The lift station package shall be an "Orenco" system as supplied by
Anchorage Tank.
3.2 The contractor shall be responsible to obtain the necessary Municipal electric permit and
inspection, and shall provide a copy of the electrical inspector's report to the engineer overseeing the
construction of the wastewater disposal system.
3.3 The lift station shall be equipped with a watertight, insulated manhole riser and cover extending
a minimum of 6" above final grade with positive surface drainage away from the manhole. The
contractor shall be responsible for determining the necessary length of the manhole riser.
3.4 The on, off, and alarm floats shall be set at the elevations specified by the lift station supplier,
and their proper operations shall be verified by the contractor. The high level alarm shall be mounted
inside the residence.
3.5 The discharge line from the lift station to the soil absorption system shall be 1.25" dia. Sched 40
PVC. All pipe connections in the distribution system shall be glued, and the ends of all pipes capped.
4.0 Soil absorption system:
4.1 The soil absorption system shall be constructed by excavation a 75-foot long trench to a total
depth of 11.5 feet below ground level on the low side. The long axis of the excavation shall parallel an
existing contour of the land.
4.2 The bottom of the excavation shall be level. Any compacted or smeared surfaces shall be raked
to allow proper infiltration.
4.3 A total of 9.25 feet of approved sewer gravel shall be placed in the bottom of the excavation
with the perforated distribution pipes laid level such that the pipe inverts are no less than 9.0 feet above
the bottom of the sewer gravel. The distribution pipe shall be 1.25" diameter schedule 40 PVC with
3/16" diameter holes drilled in the bottom at 24" spacing. Sewer gravel shall be 0.5" ~ 2.5" screened
gravel, with less than 3% passing the #200 sieve.
4.4 Monitor tubes and cleanout pipes shall be of 4" diameter and installed in the locations shown on
the design drawings. The portion of the monitor tube extending through the sewer gravel shall be
perforated.
4.5 Approved filter fabric shall be placed over the entire top surface of the sewer gravel. A
minimum of 2 feet of soil cover is to be placed over the filter fabric. If the soil cover thickness is less
than 3 feet, two inches of rigid, burial type insulation is to be placed over the entire top surface of the
gravel, in addition to the filter fabric.
4.6 The top surface of the cover material shall be raised a minimum of 6 inches higher than the
surrounding terrain to allow for subsequent settlement, and shall be graded to smooth contours. Fill
slopes shall be no steeper than 3:1. Additional soil material shall be placed as necessary to ensure
that a 25% downward sloping line projecting outward from the top of the sewer gravel does not
daylight within 35 feet of the absorption trench.
4.7 Unless specifically agreed otherwise the homeowner shall be responsible for arranging to have
the site finish graded after the backfill material has stabilized, and for placement of adequate topsoil and
seed to promote rapid revegetation of all areas disturbed by the construction.
5.0 Inspections:
5.1 A minimum of 4 engineering inspections will be required during the course of the project: (1)
initial stakeout with the contractor to establish the location of the system and to discuss the plans,
specifications and construction procedures, (2) after the native material has been excavated to expose the
infiltrative surface to ensure that it is level and at the right elevation, and conforms with the soil test
information, (3) after the sewer gravel is in place and the distribution pipes have been laid and connected
up to the septic tank, but prior to placement of insulation or filter fabric, and (4) after rough backfill and
grading is complete. The STEP tank requires one inspection after it is set level and the piping
connected, but prior to backfill. This inspection may be incorporated with any of the above inspections.
5.2 The installer shall coordinate the timing of the inspections with the engineer sufficiently far in
advance to ensure the availability of the engineer.