GARNESS ENGINEERING GROUP, Ltd.
CONSULTANTS & GENERAL CONTRACTORS - r
February 6, 2013
S4 Group
124 E 7th Avenue
Anchorage, Alaska 99501
Attention: Tom Dreyer
office 907 306-8104
Ref: Septic Reserve Map and Test Hole Information for Proposed Sky Manor S/D),
(A Subdivision of Tundra Jewel Ranch S/D; Lot 20)
Mr. Dreyer:
Per the request of our client, John Thomson with C&T Construction, we performed
numerous test holes on the referenced property for the purpose of identifying suitable
septic system sites, as require to subdivide the property. It is our understanding that our
client would like to develop the property into 7 lots with a duplex to be built on each
property. The duplexes shall be limited to 6 bedrooms total (3 bedroom per unit
maximum). Per AMC 15.65.180, septic reserve areas or platted drainfield sites must be
provided in order to subdivide the property.
Attached is a septic reserve site plan which shows the test hole locations, the well
drilled on the property, the proposed water main/service line locations, the proposed
duplex locations, septic reserve areas, and platted drainfield sites. Based upon the soil
percolation rates on lots 1, 2, 3, 4, and 5, septic reserve areas of 10,000 sq.ft are
required for each lot. Test hole #13 (proposed Lot 1) and test hole #1 (proposed Lot 2)
had percolation rates of 3.33 minutes/inch. Test holes #3, #4, #5, #6, #7, and #8 for
proposed lots 3, 4, and 5 had percolation rates of <1 minutes/inch. Lots 3, 4, and 5 will
require 2 foot sand filters with bed type or shallow trench type drainfields. Due to the
limited available area on the proposed Lots 6 and 7, platted drainfield sites will be
required for each lot. Test holes #9, #10, #11, and #12, for proposed Lots 6 and 7, had
percolation rates of<1 minutes/inch. Lots 6 and 7 will require 2 foot sand filters with bed
type drainfields. On the site plan drawing we have provided the design criteria for the
platted drainfield sites for Lots 6 and 7.
SURFACE WATERS: There are no surface waters within 100 feet of the septic reserve
areas or proposed plated drainfield sites.
TOPOGRAPHY: The average topography for the tract of land is a 5 percent slope
running approximately south to north. Bed type drainfields with sand filters are
anticipated for a majority of the proposed lots. There are no concerns in regards to
topography with these type of installations.
3701 E. Tudor Road, Suite 101 *Anchorage,AK 99507-1259
Ph: (907)337-6179 *Fax: (907)338-3246*Website: www.garnessengineering.com
CONCLUSION: Based upon the aforementioned information, we are unaware of any
adverse impacts the proposed septic systems would have on adjacent properties. If
you have any qu-stions, please contact us at 337-6179.
in -rely,
- re. A ca - P.E., M.S.
Presi N-
3701 E.Tudor Road,Suite 101 *Anchorage,AK 99507-1259
Ph: (907)337-6179 *Fax: (907)338-3246*Website:www.garnessengineering.com
1 / \ ----- — — \ • q ����4
/� // /X\ \\ \\ I �ER1lL ARFA I ["EPTIC AREA i / -� \ \ - - G�P ,��
I! I �-I---------T-----t)T
T - 11 /; I S�gDlvis I \\! / I !\\ // \\ '� - �D
\I \ \ / I/ /
DELU�IA/ ' // I �N� �\ LOT 33 II LOT 48 I A�� ` Lt*'.
k \ X ' I LOT 30 I LOT 31 LOT 32 \ I I O • •
LOT 9 I \ \ LOT s OT 28/ �/ I LOT 29 , I \ I I / I <, 0 \>> " •-e�*BOO
I 51 o i ---— '/ � /EFNIESASSLOT NEU 3 S2 I 1I / / / \ / o4p�rs Re°;o<a1oC5 91‹, WE- I I ,so aAssl�c-.Eu RAOAJS liI I\ 1 ,' // \ / ��O000v1 �1� , 2�
t.•. k =+ I NEEDELS LOOP I i >�,.. • \ �/
--------- . . •'v!;f'`'o: ? i ;� ' �-i': �°a,-�^:-.�. '4:•,.• r. .�.- _. ,�.... ;�=„'z-' .-5....;.: .-.va.;t:'..•.:.;: b+ '�' `t '•'
r -= a
SO' EASEMENT RESERVED FOR ROAD
//e/ �'�+•9CJc_liaS' •
// „�-_ - 41_ r -,, r +'. - ���_ •rr- 'mom• •'�' � _ . ��';,` �
„/, „////„/ -__ //,//7//„ --- ,, „/,/„ ////,,,,, //,/ //„,„/,/„///,,, ,,, >�ti. PLANNING CASE
,,,,... .�5,„/,�„ ., /,,,////./ 4„/,/, yo. s ,,,,,,/ „ { 77. .,6,,.x. „/,,,,,,,/,,,,,,/lv►,,,,/, / I
t 1JJ L LLLJ-/-LLLJJ �:�,Y -LL41 J LLL - �4if.�ry JJ LL _z_/....,_4 �'L.,% LL 1J Cl�•r JELL L.LJJ-ECCE �LLLLJJ1GLlJ�LL
\ �• �n '•-+-Y;`!"•C* kg.).�: / `i .f?ti!). �wwwt:Ms wtiwv wtiwwA�w: N•F - r'•
— _ ''"� / r # S11977-1 0
..;.;• : r:7i'['.: �'•Va<:r:LS' \ 5+J X - .w,l:r. niti '+�. - ,` 1
\ /raid t t ...f.; '''1.1'. :.:-1;:, .1'....1-4.1:1
,%z`t`•' Y ).11'/: , i .- .
\ .y'�.i,�.''•t. '`r::d_,y�: (;'-.” \ :z,1.s, y: .t,�:it .ti.. �,�..:,M;n;. >f: : .' .• 1�Z.a.?t�•Y 1;�!:::, !i rhI i
! jt'tlt<•'_., APIA "� ••1-•: 1rt3; .Y \
: ;t�•`.. it'• _• S. ,:44,,,,.......,-...,-.
�f:'”,, ij Yr)t...f?X ., - a i r/~
01 :.' r 'a <.c Vis. tv:
PROPOSED PROPOSED •
ti.- -. / '`•� ?.F 2
ouPErEx PROPOSER PROPOSED PROPOSED 4?TM#6 01P`F” <? / �wviioec uxanow 7 t
w�ki�l OUP= DUPLE( Y - z^.• I .—. >•
.7H/4 / DUPLEX '� f, w r... r yp p
Lot 1 Lot 2 Lot 3 Lot 4 Lot 5 i`”.=� r � • - , -. to •s ii 1 ;� W
I E;�1'! t.. • PILO® 4AM:v , 'i leis IL a
I it ---- . I "'”
-,A: T'Yt£cl�;;.`.' arum 7�'S' '�% C i ` M+1 G
I I / ' �+
10.0O3 SCUT. 1
SEPTIC RESERVE
AREA(60'x 14S ! 1OLIPLEE • -Ii ':%-''''I`-I A
I - , 10 000 SOFT. 10.00 RE VE i I • •i•. , S
I ,0.000 SOFT.
I i SEP„(:RESERVE i 10.DDD SQFf. \ .1 \ 1- 1 DO• W
SEPTIC, AVILA ao x 125 .V,,+w, ►(eo• x ,zs1 1 I �„c RESERVE Lot 6/ I Lot 7 '�`
.x I AREA(eo'x 1u) i i t. ` ' iiii'' 1 f i AREA(60' x 125) I / ! •
G TN/3 I C�,iiiiiiiiii/,��% 6,,, //'''>//ii/ i i 14 � 0 w I
ii ,///f/ , ,,, r,i,,, ,�i, I /�
-/Lu, _ . CIuuLLi.LilGiiJ 1[171..
iLflEfLf�///a1J I ,0iT •''
PROPOSED 2(1 ROOT FASELIEIIT CO }1
... w e
---------i - -I'- / . FOR scut MAN MID WELL HOUSE / N
/ - -- \ • oust Eyw 3. 29 FOOT EASEMENT • \ , / PROPosmSELL'^^SYi.;..: ::,
\ I // J N
/ ,/ \ t FOR nATER MAN \
i \ \ / .1 I - - o
/ / \ \ �-y Wal %•.:::•;•. / — v
I / \' yr\ i/ I , it I / O K N
N w
// /� \ \M UBpIVISIpN \\ ` _ - I 1 I �/ o m o
/ ,� A SEW \\ tib /,, N U
, LOT 11 1 '� ,1 TuNDR LOT 1 N I �/ I LOT 2 o a n.
I I ' \ WELL AND SEPTIC SYSTEM
, ' / ; ON SOUTH/EAST DID OF LOT. } mac 0_
I�,2I ' I I • _ ---J I NO ENCROACHMENT OONCEIi11S. m-i-; =W
I I DOMINO
CUM I I I I o O- >
� ce
1 I / 1 1 I « w
p (/)
>- Z W
LEGEND LOT 6 - DESIGN CRITERIA: LOT 7 - DESIGN CRITERIA: v D Ct
SEPTIC RESERVE MAP NOTES: U
----- PROPOSED WATER SERVICE uE LOGnOII 1. THE TOPOGRAPHY. ROAD LOCATIONS FOR NEEDELS LOOP & WILDW000 DRIVE. AND NEW CLASS A WELL WERE TAKEN FROM A NUMBER OF BEDROOMS: 6 TOTAL - MAXIMUM NUMBER OF BEDROOMS: 6 TOTAL - MAXIMUM L]0
SURVEY PROVIDED BY RODNEY P. KINNEY ASSOCIATES. INC.. THE PROPOSED PROPERTY UES FOR SUBDIVISION ARE SHOWN GALLONS PER DAY (GPD): 900 GALLONS PER DAY (GPD): 900 N C d
M
.. PROPOSED WATER KEY BOX (5' FROEI PROPERTY LINE) PER S4 GROUP PROPOSED PRELIMINARY PLAT. PERCOLATION RATE/S: <1 MINUTE/INCH PERCOLATION RATE/S: <1 MINUTE/INCH d> W
2. ALL PROPERTIES WILL BE SERVED BY THE PROPOSED CLASS A” WATER SYSTEM. PROPOSED APPUCATION RATE: 07 GPD/SQ-FT. PROPOSED APPLICATION RATE: 0.7 GPD/SQ.FT. O p (n
- - PROPOSED WATER MAN 3. TEST HOLES LOCATIONS /1, /2, /4, /5, /6, /7, AND /8 ARE SURVEYED LOCATIONS PER RODNEY P. KINNEY ASSOCIATES, INC. MINIMUM DRAINFIELD SQ.FT.: 1,286 MINIMUM DRAINFIELD SQ.FT.: 1,286 DY co Z
TEST HOLE LOCATION /3. /9, #10. f 11. #12, AND 13 ARE APPROXIMATE LOCATION AND ARE SHOWN BASED UPON FIELD a.m d' Z
PROPOSED SEPTIC TAM LOCATION (FOR LOTS 6& 7) MEASUREMENTS TAKEN OFF THE SURVEYED TEST HOLES, SURVEYED ROAD EDGE, AND MEASUREMENTS BETWEEN NEW TEST M v 0 N
HOLES. LOT 6 — DRAINFIELD DESIGN: LOT 7 — DRAINFIELD DESIGN: I,_
PROPOSED PLATTED DRAINFIELD SITES(FOR LOT 6& 7) 4. LOTS 1 AND 2 HAVE PERCOLATION RATES OF 3.33 MINUTES/INCH AND REQUIRE 10,000 SO-F.T. OF SEPTIC RESERVE AREAS MAXIMUM DEPTH: 10 FEET MAXIMUM DEPTH: 10 FEET 0 E Z C 0
PER AMC 5.180. WIDTH: 15 FEET WIDTH: 12 FEET N 0 _
PROPOSED SEPTIC RESERVE AREAS (FOR LOTS 1 TO 5) 5. LOTS 3, 4, & 5 HAVE PERCOLATION RATES OF <1 MINUTES/INCH AND REQUIRE 10.000 SQ.F.T. OF SEPTIC RESERVE AREAS \ g 1,_
WITH A 2 FEET OF MOA APPROVED SAND FILTER PER AMC 15.65.180. LENGTH: 86 FEET LENGTH: 108 FEET r., g30-PROPOSED DUPLEX LOCATOR (6 BEDROOMS TOTAL - M) 6. LOTS 6 AND 7 HAVE PERCOLATION RATES OF <1 MINUTES/INCH AND REQUIRE PLATTED DRAINFIELD SITES WITH A 2 FEET OF M.0A. APPROVED SAND FILTER: 2 FEET M.OA APPROVED SAND ALTER: 2 FEET 6 S z
MOA APPROVED SAND FILTER PER AMC 15.65.180. (SEE DRAINFIELD SIZE REQUIREMENTS). EFFECTIVE: 0.5 FEET EFFECTIVE: 0.5 FEET L+I\ S
TEST HOLE LDGTIOHS ( SEPTIC RESERVE NOTES) _ 7. ALL PROPERTIES WILL BE UMITED TO A MAXIMUM OF 6 BEDROOMS (3 BEDROOMS PER UNIT). ACTUAL SQ.FT.: 1,290 ACTUAL SQ.FT.: 1,296 a N WN 0
o a
oa�FFF°op
GARNESS ENGINEERING GROUP, Ltd. Qoo F �; y��p•-• CONSULTANTS&GENERAL CONTRACTORS ; II O3701 E. TUDOR ROAD. SUITE 1Ot • ANCHORAGE.AK. 99507 • PHONE: (907)337-6179 • FAX: (907)336-3246•WEBSITE: 9om.ss.oq'vreerinq.com ,/ OSOIL LOG — PERCOLATION TEST (CASE #s11977-1) / DLEGAL DESCRIPTION: TUNDRA JEWEL RANCH; LOT 20 - PROPOSED SKY MANOR, LOT 2 �' '�_79G Hrness:'•�a
PERFORMED FOR: JOHN THOMSON DATE: 6/5/2007 I s •• !�.(2,. ( .•'' •�c.0
DEPTH \I�� P�ofessloo�
(feet) __ ORGANICS TEST HOLE #1 �0000�o
1 LOAM
•••• e SOIL CLASSIFICATIONS
2—;�•:::
.•:.•:•. ° 0 GW : ORG
•....•. . • • GP ij)��_ ML
3 Oe II
.� •
.•:.•�•. GM CL
••.•'•I GC ��, OL
,••';'t<°. 00 Q•00•o c SW )). MH
.
. ...•• . .• •.
•• •
SP % CH
5
•.•.,.•••••
• .•, •�•' � SM '. '� OH
•••••••R es oleos• SC SEE ATTACHED DRAWINGS
•••••a•.
••.••••7 .•. . . DEPTH TO
'•H.•• SP WITH GP GROUNDWATER DATE
••••••• THOUGHOUT
8 ,.,,. (MORE SAND DRY 6/5/2007
• :•�': WITH DEPTH) DRY 6/12/2007
9 :� •:. • DRY 2/6/13
•e:••i•I
••'•••• DRY 5/29/2013
10
•••.•ll••
••••••• CLOCK NET TIME WATER LEVEL NET DROP
11 ;•..,. DATE READING TIME (MINUTES) READING (INCHES)
...•••‘•I
••••*•I 6/5/2007 1 11:00 — 6" -
12 •%•••••
.•:.•11•• 2 11:10 10 3" 3"
13 ••:••••• 3 11:10 - 6" -
•o••+gt
feeNO ' 4 11:20 10 3" 3"
14—•••
•• •• 5 11:20 - 6" -
••6•
• •11••
•••.•.• 6 11:30 10 3" 3"
15 • ,.•.•• 7 11:30 - 6" -
••:••i•.
••••••„•
16 •••••••' 8 11:40 10 3" 3"
B.O.H. 9 11:40 - 6" -
17— 10 11:50 10 3" 3"
11 11:50 - 6" -
18— 12 12:00 10 3" 3"
PERCOLATION RATE 3.33 (MIN./INCH) PERC. HOLE DIA. 6 (INCHES)
19—
TEST RUN BETWEEN 4 FT. AND 5 FT.
20 A FOUR HOUR PRESOAK WAS PERFORMED: ❑ YES U NO
SOILS LOGGED BY: JODY MAUS PERCOLATION TEST PERFORMED BY: BENNY MAUS
COMMENTS: PERCOLATION READINGS WERE WITHIN 1/16 OF INCH.
PERFORMED BY GEG, Ltd. I, JEFFREY A. GARNESS, CERTIFY THAT THIS WAS PERF RMED IN ACCORDANCE
WITH ALL STATE AND MUNICIPAL GUIDELINES IN EFFECT ON THIS DATE: 717a/13
_ �- 000�000004
, .
lee ., :,,, ....,,,, ,e„.7,Zcr....... . ...,.,g
GARNESS ENGINEERING GROUP, Ltd. .P , is -��0
CONSULTANTS&GENERAL CONTRACTORS *:- / 2, r �'�DOD
3701 E. TUDOR ROAD. SIAM ,D, ' SOIL LOG• RHONE:
PER3COLATIONI TEST ' go,.».•."v�."�
ANCHORAGE.AX 99507 7-6179 • FAX: � caml/ VA
(CASE #S11977-1) f A. orness.
LEGAL DESCRIPTION: TUNDRA JEWEL RANCH; LOT 20 - PROPOSED SKY MANOR, LOT 2 i -91. CE 795 vp�
PERFORMED FOR: JOHN THOMSON DATE: 6/5/2007 I I's% •7 Zz .i.• cA��
(feet) i _-:„-_-_,..„-:;=:-
_ _ ORGANICS/LAOM ` e,P 0fess oo.
DEPTH ��� r n o
== TEST HOLE #2 0oo. .
0.• SOIL CLASSIFICATIONS
2 -' 1' SP—SM
0•••. • Q. .o GW ORG
I••• •
3 Ii;iurill GM � CL
4— a. .• r�mg GC ��� OL
a • .o 0 00°c o.0, SW j)) MH
a. . . riARLICY SP i CH
5 a . . MOE SM ' ,//i OH
6 • SC SEE ATTACHED DRAWINGS
a •
•7— • DEPTH TO DATE
a . GROUNDWATER
4
8— + � DRY 6/5/2007
•
a •. GP DRY 6/12/2007
9— • •. DRY 2/6/13
• • DRY 5/29/2013
10— •
•
• DATE READING CLOCK NET TIME WATER LEVEL NET DROP
11 , TIME (MINUTES) READING (INCHES)
•
• • 6/5/2007 1 - - 6" -
12— ,
• 2 - <1 0" 6"
• •
13— , 3 - - 6,. -
•
4 - <1 0" 6"
14— , . . 5 - - 6" -
•
• .• r 6 - <1 0" 6"
15— •
•
B.O.H.
16—
17-
18—
PERCOLATION RATE <1 (MIN./INCH) PERC. HOLE DIA. 6 (INCHES)
19—
TEST RUN BETWEEN 4 FT. AND 5 FT.
20 A FOUR HOUR PRESOAK WAS PERFORMED: ❑ YES II NO
SOILS LOGGED BY: JODY MAUS PERCOLATION TEST PERFORMED BY: BENNY MAUS
COMMENTS:
PERFORMED BY GEG, Ltd. I, JEFFREY A. GARNESS, CERTIFY THAT THIS WASPERF RMED IN ACCORDANCE
WITH ALL STATE AND MUNICIPAL GUIDELINES IN EFFECT ON THIS DATE: `7l 2 Zp2
,obooAp,44
0
de 1` x4 o' •. '•A s4t)
GARNESS ENGINEERING GROUP, Ltd. oo�',•
.:. _ __:.,. .. CONSULTANTS&GENERAL CONTRACTORS az.� x-- '�/ * 4 v. - .. * 0
3701 E. TUDOR ROAD. SUITE 101 • ANCHORAGE.AK. 99507 • PHONE: (907)337-6179 • FAX: (907)338-3246 • WEBSITE: 9ornessengineenng corn
SOIL LOG - PERCOLATION TEST (CASE #s11977-1) �,
LEGAL DESCRIPTION: TUNDRA JEWEL RANCH; LOT 20 - PROPOSED SKY MANOR, LOT 2 9 .J: rey A. orness•. ` $
1 C -79153 .• �O
PERFORMED FOR: JOHN THOMSON DATE: 6/5/2007 I 's J/ ,oe4
DEPTH• ,4e of yo•
(feet) _ = ORGANICS TEST HOLE #3 k,00000���
SP/LOAM SOIL CLASSIFICATIONS
2 Pei r---
• o .o GW ORG
•
•
3 •. .. WI GP ) ML
IIIIIM1 GM l%l CL
4 • •. �Y GC OL
a • Doo.a000•D., SW MH
.
•
• • SP / CH
5_ •
6 •• �akl sc / O� H SEE ATTACHED DRAWINGS
•
6 •.
DEPTH TO
7 • • GROUNDWATER DATE
•
8— • .• DRY • 6/5/2007
• • DRY 6/12/2007
9— • •" GP W/ SOME
• SILT AND DRY 2/6/13
0 .. COBBLES/BOULDERS DRY 5/29/2013
10— _
• • DATE READING CLOCK NET TIME WATER LEVEL NET DROP 1
11 —. , • TIME (MINUTES) READING (INCHES)
•
• • 6/5/2007 1 - - 6" -
12— • .
• 2 - 2 0" 6"
• • - - -
13— „ 3 6"
• 4 - 2 0" 6"
• •
14— s 5 - - 6" -
•
• „,; 6 - 2 0" 6"
15—. •
•
B.O.H.
16—
17—
18—
PERCOLATION RATE <1 (MIN./INCH) PERC. HOLE DIA. 6 (INCHES)
19—
TEST RUN BETWEEN 4 FT. AND 5 FT.
20 A FOUR HOUR PRESOAK WAS PERFORMED: ❑ YES U NO
SOILS LOGGED BY: JODY MAUS PERCOLATION TEST PERFORMED BY: BENNY MAUS
COMMENTS:
PERFORMED BY GEG, Ltd. I, JEFFREY A. GARNESS, CERTIFY THAT THIS WAS ,PERF RMED IN ACCORDANCE
WITH ALL STATE AND MUNICIPAL GUIDELINES IN EFFECT ON THIS DATE: 712
0006op,OO
- o OF �p
GARNESS ENGINEERING GROUP, Ltd. a0): I, T i- \4. *...y0p
CONSULTANTS&GENERAL CONTRACTORS ,-- �� I . 4 - . * DA
3701 E. TUDOR ROAD. SUITE 101 •ANCHORAGE.AK. 99507 • PHONE: (907)337-9179 • FAX: (907)338-3249•WEBSITE: 9ornssssnginssrin9.com -,,
SOIL LOG - PERCOLATION TEST v / 0
//
(CASE #S11977-1)
TUNDRA JEWEL RANCH; LOT 20 - PROPOSED SKY MANOR, LOT 2 f r; • • ess.
LEGAL DESCRIPTION: .•
11" i•. CE-793 V,
PERFORMED FOR: JOHN THOMSON DATE: 6/5/2007 1 1�P •••10-1/3*• Aoo
= ORGANICS #4 44\�00000�6�0
(feet) TEST HOLE
1 Vili LOAM
• SOIL CLASSIFICATIONS
2 •
—
• ..4-1,
o .o GW ^ ORG
3 1611111 GM j CL
MS GP jML
��
4— • • rCre% GC � OL
• .
`'.?.°0°oo•. SW 1 MH
• • 4RRO SP CH
5 • ` MIRE SM ,' .i OH
• •: UftM SC SEE ATTACHED DRAWINGS
6— •
DEPTH TO
7 • • GROUNDWATER DATE
• . :
8— • .� DRY 6/5/2007
DRY 6/12/2007
• •. GP W/ SOME
9 • •. SILT AND DRY f 2/6/13
O , COBBLES/BOULDERS DRY 5/29/2013
10— •
• •• DATE READING CLOCK NET TIME WATER LEVEL NET DROP
11 — • TIME (MINUTES) READING (INCHES)
•
• . 6/5/2007 1 - - 6" -
12— •
• 2 - <1 0" 6"
• • - - -
13— • 3 6..
•
• • •.
4 - <1 0" 6"
14— • 5 - - 6" -
•
• • 6 - <1 0" 6"
15—. • •
B.O.H.
16—
17—
18—
PERCOLATION RATE <1 (MIN./INCH) PERC. HOLE DIA. 6 (INCHES)
19—
TEST RUN BETWEEN 4.5 FT. AND 5.5 FT.
20 A FOUR HOUR PRESOAK WAS PERFORMED: ❑ YES U NO
SOILS LOGGED BY: JODY MAUS PERCOLATION TEST PERFORMED BY: BENNY MAUS
COMMENTS:
PERFORMED BY GEG, Ltd. I, JEFFREY A. GARNESS, CERTIFY THAT THIS WAS PERFORMED IN ACCORDANCE
WITH ALL STATE AND MUNICIPAL GUIDELINES IN EFFECT ON THIS DATE: -7/Z2 -J/3
ooQoppp�
GARNESS ENGINEERING GROUP, Ltd. °.`P., 9 y hp
— ----, •. < ,_ CONSULTANTS&GENERAL CONTRACTORS, _= A
3701 E. TUDOR ROAD. SUITE 101 • ANCHORAGE.AX. 99507 • PHONE: (907)337-6179 • FAX: (907)338-3246 •*EBSWE: gomssssrgi"eeri '• V
ny.tom O
14
VA
SOIL LOG - PERCOLATION TEST (CASE #611977-1)
�/ •
LEGAL DESCRIPTION: TUNDRA JEWEL RANCH; LOT 20 - PROPOSED SKY MANOR, LOT 2 /' -f r A. Gorness.CE-79
•PERFORMED FOR: JOHN THOMSON DATE: 6/5/2007 I sfe rZ v j2••. A�c��
DEPTH• ‘44Qa p { o\'o 0
0
(feet) _ _= ORGANICS TEST HOLE #5 �,O0000�a�.
1
LOAM
SOIL CLASSIFICATIONS
2
•.
GP/ML
• . °:' .o GW J ORG
IIM GP
3 • .. ' 11GM ^
4- rMa GC I I) ryCL I OL
i ••' °° °o•. SW .)) MH
i • SP i CH
5— .
6- •. • . sc SEE ATTACHED DRAWINGS
•• DEPTH TO
7 i • GROUNDWATER DATE
• •
8— i .• DRY 6/5/2007
• • DRY 6/12/2007
_ • •" • GP W/ SOME
9 i ••• SILT AND DRY 2/6/13
10— i .. COBBLES/BOULDERS DRY 5/29/2013
• •• DATE READING CLOCK NET TIME WATER LEVEL NET DROP
11 — i .• TIME (MINUTES) READING (INCHES)
•
• • 6/5/2007 1 - - 6" -
12 i
• 2 - <1 0" 6"
4 i — - -
13— i 3 6"
4 - <1 0" 6"
• •
14— i . 5 - - 6" -
•
• i ,. 6 - <1 0" 6"
15—. ,
•
• •.
16 B.O.H.
17—
18—
PERCOLATION RATE <1 (MIN./INCH) PERC. HOLE DIA. 6 (INCHES)
19—
TEST RUN BETWEEN 4.5 FT. AND 5.5 FT.
20 A FOUR HOUR PRESOAK WAS PERFORMED: ❑ YES El NO
SOILS LOGGED BY: JODY MAUS PERCOLATION TEST PERFORMED BY: BENNY MAUS
COMMENTS:
PERFORMED BY GEG, Ltd. I, JEFFREY A. GARNESS, CERTIFY THAT THIS WAS PE ORMED IN ACCORDANCE
WITH ALL STATE AND MUNICIPAL GUIDELINES IN EFFECT ON THIS DATE: 1 1 Z:Z-if 3
o4p��O0‘
GARNESS ENGINEERING GROUP, Ltd. ,0,/<(...•
��P 49 / r . __1)
1)
CONSULTANTS 8.GENERAL CONTRACTORS W / {+ D
3701 E. TUDOR ROAD. SUITE 101 • ANCHORAGE,AK. 99507 • PHONE: (907)337-6179 • FAX: (907)338-3246 • WEBSITE: 9ornssssnginssrin9.com
SOIL LOG - PERCOLATION TEST (CASE #511977-1) i f 0
L13 EGAL DESCRIPTION:
TUNDRA JEWEL RANCH; LOT 20 - PROPOSED SKY MANOR, LOT 2 / rey A. Gorness
PERFORMED FOR: JOHN THOMSON DATE: 6/5/2007 /119'6 CE 79 `sa
DEPTH• �Dea Pro f .On \o
(feet) _ :ORGANICS �Op000��oo
TEST HOLE #6
1
11011 LOAM SOIL CLASSIFICATIONS
2
• Q . 0 GW ; ORG
• MI GP ML
3 • 161112GM )� CL
4— .• rOrM% GC OL
6 iv
c:,(*).%°ON', S W )) MH
i •.
' •
V4755; SC SEE ATTACHED DRAWINGS
•
DEPTH TO
7 • .. . GROUNDWATER DATE
o • GP W/ SOME
8— • . SILT AND LARGE DRY 6/5/2007
• COBBLES/BOULDERS
• .• DRY 6/12/2007
9 • 0 DRY 2/6/13
• • '. DRY 5/29/2013
10—. •
•
• •
• DATE READING CLOCK NET TIME WATER LEVEL NET DROP
11 —, • .•, TIME (MINUTES) READING (INCHES)
• • 6/5/2007 1 - - 6" -
12—. •
• 2 - <1 0" 6"
' • . _ _ 6 -
13—. • . 3 "
• 4 - <1 0" 6"
14— • • 5 - - 6" -
• •
. • , 6 - <1 0" 6"
15—, •
•.
• •
16 B.O.H.
17—
18—
PERCOLATION RATE <1 (MIN./INCH) PERC. HOLE DIA. 6 (INCHES)
19—
TEST RUN BETWEEN 4.5 FT. AND 5.5 FT.
20 A FOUR HOUR PRESOAK WAS PERFORMED: ❑ YES I.NO
SOILS LOGGED BY: JODY MAUS PERCOLATION TEST PERFORMED BY: BENNY MAUS
COMMENTS:
PERFORMED BY GEG, Ltd. I, JEFFREY A. GARNESS, CERTIFY THAT THIS WAS PIRFOPNED IN ACCORDANCE
WITH ALL STATE AND MUNICIPAL GUIDELINES IN EFFECT ON THIS DATE: 7/ Z7,1133
oo6. pp%o
_o
ooh ./95���0
GARNESS ENGINEERING GROUP, Ltd. . • •.-57 0
CONSULTANTS&GENERAL CONTRACTORS a,:,m -,-',------- "E,. * . >} 0�
3701 E. TUDOR ROAD. SUITE 101 •ANCHORAGE,rut. 99507 • PHONE: (907)337-6179 • FAX: (907)336-3246 • WEBSITE: 90 nhsseng.nw.n9.c• VA
SOIL LOG - PERCOLATION TEST (CASE #611977-1) /. v
�/ 7 fre orness: 0
LEGAL DESCRIPTION: TUNDRA JEWEL RANCH; LOT 20 - PROPOSED SKY MANOR, LOT 2 i1 0 •I CE-7953 •
�Q�
PERFORMED FOR: JOHN THOMSON DATE: 6/5/2007 14 ••. �! 24•13••. AcoO
DEPTH! �OPap ( 2••.le s o\c�o
0
(feet) _ _ORGANICS TEST HOLE #7 �'pppo��oo
1Vr
2 LOAM SOIL CLASSIFICATIONS
• o o GW ::::-.7.-..:=7. ORG
1 -) ML
3— a .• ' M GP GM CL
i 11611191
M % GC I OL
4— /I ; SW 1 MH
• •' 41NRO SP z CH
5— • • iniall SM r' J OH
6- •
�`s ' SC SEE ATTACHED DRAWINGS
7— • , GP w/ SOME GRDEPTH TOOUNDWATER DATE
• SILT AND LARGE
8—. .� COBBLES/BOULDERS DRY 6/5/2007
•
• .• DRY 6/12/2007
9— a • DRY 2/6/13
DRY 5/29/2013
10— 6 .
•
6 • DATE READING CLOCK NET TIME WATER LEVEL NET DROP
11 —. • . TIME (MINUTES) READING (INCHES)
•
• • 6/5/2007 1 - - 6" -
12—. •
• 2 - <1 0" 6"
• .• - _
13— 6 3 6" -
•
4 - <1 0" 6"
14— • : . 5 - - 6" -
•
• , 6 - <1 0" 6"
15—. •
•
• •
16 B.O.H.
17— .
18—
PERCOLATION RATE <1 (MIN./INCH) PERC. HOLE DIA. 6 (INCHES)
19—
TEST RUN BETWEEN 4.5 FT. AND 5.5 FT.
20 A FOUR HOUR PRESOAK WAS PERFORMED: ❑ YES II NO
SOILS LOGGED BY: JODY MAUS PERCOLATION TEST PERFORMED BY: BENNY MAUS
COMMENTS:
PERFORMED BY GEG, Ltd. I, JEFFREY A. GARNESS, CERTIFY THAT THIS WAS/PERF RMED IN ACCORDANCE
WITH ALL STATE AND MUNICIPAL GUIDELINES IN EFFECT ON THIS DATE: 7/ 2 /3
0oo600pp°
_ .• ......„ .�
GARNESS ENGINEERING GROUP, Ltd. ° P11
CONSULTANTS&GENERAL CONTRACTORS . ,.:.�.._,, •A' : /i 9 ..00
3701 E. TUDOR ROAD, SUITE 101 • ANCHORAGE,AX. 99507 • PHONE: (907)337-6179 • FAX: (907)338-3246• WEBrnsq.
SITE: gosssngineerincom � VI
SOIL LOG — PERCOLATION TEST (CASE #S11977-1) �' 0
TUNDRA JEWEL RANCH; LOT 20 – PROPOSED SKY MANOR, LOT 2 � : re - arness:• 0
LEGAL DESCRIPTION: CrERFORMED FOR: JOHN THOMSON /I ". • 79 3 ,tpQ
DATE: 6/5/2007 I �,„ ••, � �°•.sOa
kv
(fee) : _ ORGANICS 44��000Oo���o
feet TEST HOLE #8
1
ig. ! LOAM SOIL CLASSIFICATIONS
2
GP/ML o ,o.. GW ��_
:z� ORG
'. IIML
3 II;II�I".,II GM I CL
4— ` • %%/% GC : OL
• • • SM Do,coo D• SW MH
•o
• • SP 1 CH
•
RINEI�IRINE ,'
5—. •
• .
.i OH
A i antaiSC SEE ATTACHED DRAWINGS
•
• • •' DEPTH TO
7—• • ',, GP W/ SOME GROUNDWATER DATE
. • . SILT AND LARGE
8—. • .' COBBLES/BOULDERS DRY 6/5/2007
. • :
o
GARNESS ENGINEERING GROUP, Ltd. v'`Q•'. SY O
CONSULTANTS&GENERAL CONTRACTORS• r< / • ~ - * oO
3701 E. TUDOR ROAD. SURgn
E 101 • ANCHORAGE.AK. 99507 • PHONE: (907)337-6179 • FAX (907)336-3246• WEBSRE: 9o.nesseneenn9.can
SOIL LOG - PERCOLATION TEST • D
(CASE #511977-1) r . rey• .••• *mess.: ••••
LEGAL DESCRIPTION: TUNDRA JEWEL RANCH; LOT 20 - PROPOSED SKY MANOR, LOT 2 i) CE-79 3 oQ$
PERFORMED FOR: JOHN THOMSON DATE: 1/30/2013 11� ( 3.•'' �c�O
DEPTH P� .'7... �(so
(feet) .E.7.:,7_::_,.'::. ORGANICS �4���pppoo��o
TEST HOLE #9
y LOAM SOIL CLASSIFICATIONS
2
GP/ML o. .o" GW ~ _ ORG
• GP III ML
3 • '` 11;11113 GM� CL
• - 7 GC OL
MH
• SP CH
5— • •
SM / ,j OH
6 •
VZ.,.., SC SEE ATTACHED DRAWINGS
• •
DEPTH TO
7 • , GP w/ SOME GROUNDWATER DATE
• SILT AND LARGE
8— • ..• ' COBBLES/BOULDERS DRY 1/30/13
• •• DRY 1/31/13
9— • , DRY 2/6/13
DRY 5/29/2013
• •
10—
• • DATE READING CLOCK NET TIME WATER LEVEL NET DROP
11 — • ., TIME (MINUTES) READING (INCHES)
• • 1/31/13 1 - - 6" -
12— •
• 2 - <40 SEC. 0" 6"
• • - - -
13— a • 3 6"
4 - <40 SEC. 0" 6"
•
14—, a . 5 - - 6" -
•
• , 6 - <40 SEC. 0" 6"
15—:
•
• •
16—. • .
•
• '•
17 B.O.H.
18—
PERCOLATION RATE <1 (MIN./INCH) PERC. HOLE DIA. 6 (INCHES)
19—
TEST RUN BETWEEN 4.0 FT. AND 5.0 FT.
20 A FOUR HOUR PRESOAK WAS PERFORMED: ❑ YES El NO
SOILS LOGGED BY: JODY MAUS PERCOLATION TEST PERFORMED BY: JODY MAUS
COMMENTS:
PERFORMED BY GEG, Ltd. I, JEFFREY A. GARNESS, CERTIFY THAT THIS WAS P RFOFMED IN ACCORDANCE
WITH ALL STATE AND MUNICIPAL GUIDELINES IN EFFECT ON THIS DATE: 7/l7-'13
7oo600p,O0 AL ,
GARNESS ENGINEERING GROUP, Ltd. p°' �'•,• •. , '; .•- -10.
CONSULTANTS&GENERAL CONTRACTORS,,,,,, / • • 0 % *�O
3701 E. TUDOR ROAD. SUITE 101 •ANCHORAGE.AX. 99507 • PHONE: (907)337-6179 • FAX: (907)336-3246 • WEBSRE:•gomesstngGwtvn9.con
SOIL LOG - PERCOLATION TEST (CASE #511977-1) ••• •• •, •�� p
LEGAL DESCRIPTION: TUNDRA JEWEL RANCH; LOT 20 - PROPOSED SKY MANOR, LOT 2 rlll� •-1• CE A79go3rness:� P
PERFORMED FOR: JOHN THOMSON DATE: 1/30/2013 �1'sc°O
rte. /.Z.7!.(13. F,°oma
DEPTH• % ,eat
(feet) - ORGANICS TEST HOLE # 10 ���000'. '
1 �Ov..•4-4.461
TLOAM SOIL CLASSIFICATIONS
2
GP/ML 0 ° GW ^ ORG
•
IMII GP
3 . • 11 ML
IIII GM / CL
l
` • Fro-m% GC I OL
• • 0SW MH
• • .?.°0°;.%", j))
iEllRe SP i CH
5— , !piing SM .i OH
6—: 4 VA. SC SEE ATTACHED DRAWINGS
•
DEPTH TO
7—• • 6 GP W/ SOME GROUNDWATER DATE
. • • SILT AND LARGE
8—. , •.� COBBLES/BOULDERS DRY 1/30/13
• .• DRY 1/31/13
•
9— • . DRY 2/6/13
• DRY 5/29/2013
10—, ,
•
• DATE READING CLOCK NET TIME WATER LEVEL NET DROP
11 —, , S TIME (MINUTES) READING (INCHES)
• • 1/31/13 1 - - 6" -
12—. ,
• 2 - <1 MIN. 0" 6"
4 • - - -
13—. , •
. 3 6..
• 4 - <1 MIN. 0" 6"
14— , • 5 - - 6" -
•
• 6 - <1 MIN. 0" 6"
15— ,
•
• •
16 B.O.H.
17—
18—
PERCOLATION RATE <1 (MIN./INCH) PERC. HOLE DIA. 6 (INCHES)
19—
TEST RUN BETWEEN 4.0 FT. AND 5.0 FT.
20 A FOUR HOUR PRESOAK WAS PERFORMED: E YES U NO
SOILS LOGGED BY: JODY MAUS PERCOLATION TEST PERFORMED BY: JODY MAUS
COMMENTS:
PERFORMED BY GEG, Ltd. I, JEFFREY A. GARNESS, CERTIFY THAT THIS WAS PERFORMED IN ACCORDANCE
WITH ALL STATE AND MUNICIPAL GUIDELINES IN EFFECT ON THIS DATE: 7/7Z1/3
oo6ppppr
,qs
GARNESS ENGINEERING GROUP, Ltd. ,'0) ' T_
%-'57
.� 0
S
CONSULTANTS&GENERAL CONTRACTOR . •
- -- __u_,,:.,,. ..
,..; -✓ * : 4 it A
3701 E. TUDOR ROAD. SUITE 101 • ANCHORAGE.AX. 99507 • PHONE: (907)337-6179 • FAX: (907)338-3246 • WEBSITE: gornssssss
nginrin9.com ,, O
SOIL LOG - PERCOLATION TEST (CASE 511977-1 r✓ , / P
LEGAL DESCRIPTION: TUNDRA JEWEL RANCH; LOT 20 - PROPOSED SKY MANOR, LOT 2 /1 • ' CE-79 3 O
PERFORMED FOR: JOHN THOMSON DATE: 1/30/2013 1I s,, -// j�/.. A���O�
DEPTH' 1 ! c`�o
0
(feet) = ORGANICS TEST HOLE # 1 1 44�p0000��o
1 ; 5o, s
LOAM SOIL CLASSIFICATIONS
2 • 0 :o GW ORG
. GP/ML GP J ML
3 • 1611111 GM I CL
• '. 'C % GC , OL
4-- • •• I��; SW 1 1 MH
O
• SP J CH
5—. .• of ilIC� SM ' ,,/, OH
6 • �`s, ' ', SC SEE ATTACHED DRAWINGS
•
7 + •i, GP W/ SOME GROUNDWATER
. • SILT AND LARGE
8—. • .' COBBLES/BOULDERS DRY 1/30/13
• • •
6 DRY 1/31/13
9—. • .• DRY 2/6/13
• • '. DRY 5/29/2013
10—, •
' • •• DATE READING CLOCK NET TIME WATER LEVEL NET DROP
11 —, . TIME (MINUTES) READING (INCHES)
• '. 1/31/13 1 - - 6" -
12— •
• 2 - <1:40 MIN. 0" 6"
13— • .• ' 3 - - 6" -
•
4 - <1:40 MIN. 0" 6"
14— • .• • 5 - - 6" -
e.
• • . 6 - <1:40 MIN. 0" 6"
15- . .
16 B.O.H.
17—
18—
PERCOLATION RATE <1 (MIN./INCH) PERC. HOLE DIA. 6 (INCHES)
19—
TEST RUN BETWEEN 4.0 FT. AND 5.0 FT.
20 A FOUR HOUR PRESOAK WAS PERFORMED: ❑ YES U NO
SOILS LOGGED BY: JODY MAUS PERCOLATION TEST PERFORMED BY: JODY MAUS
COMMENTS:
PERFORMED BY GEG, Ltd. I, JEFFREY A. GARNESS, CERTIFY THAT THIS WAS PER ORMED IN ACCORDANCE
WITH ALL STATE AND MUNICIPAL GUIDELINES IN EFFECT ON THIS DATE: -7b,`�'3
000 oopp04
GARNESS ENGINEERING GROUP, Ltd. °'� y�0
CONSULTANTS&GENERAL CONTRACTORS =,.._ ' * . * OD
SOIL LOG
3701 E. TUDOR ROAD. SUITE 101 • ANCHORAGE.� • PHONE PERCOLATION37-6179 • FAX: TEST ST ��'� ,,
.....naN+..,in9`°m
(CASE #511977-1) W�"` r rn ss
LEGAL DESCRIPTION: TUNDRA JEWEL RANCH; LOT 20 - PROPOSED SKY MANOR, LOT 2 l� t C .73 e •' vpSp
PERFORMED FOR: JOHN THOMSON DATE: 1/30/2013 11 s� f 3,. As '
1 �� /I'('2`u , �d
PTH �4Pa p o�
51
DE _
(feet) • = ORGANICS � �OOo���o
TEST HOLE #12
qtyi„,; LOAM SOIL CLASSIFICATIONS
2
• GP/ML + .o GW ::::::=:::: ORG
• _ . . GP j _ ML
3 ' • URN GM I�� CL
• • rcmGC I OL
4 • O°o°o SW 1) MH
• • kARIRO SP i CH
5 a •. DIME SM .i OH
6— • PANti SC SEE ATTACHED DRAWINGS
• ' DEPTH TO
7— • , GP W/ SOME GROUNDWATER DATE
• SILT AND LARGE
8— • .' COBBLES/BOULDERS DRY 1/30/13
• .• DRY 1/31/13
9— • • DRY 2/6/13
• '. DRY 5/29/2013
10— _
• • DATE READING CLOCK NET TIME WATER LEVEL NET DROP
11 , .• TIME (MINUTES) READING (INCHES)
• • 1/31/13 1 - - 6" -
12—. • .
• 2 - <30 SEC. 0" 6"
13 . . 3 - - 6,.
•
4 - <30 SEC. 0" 6"
14— , . 5 - - 6" -
•
a • , 6 - <30 SEC. 0" 6"
15— •
•
• .
16 B.O.H.
17—
18—
PERCOLATION RATE <1 (MIN./INCH) PERC. HOLE DIA. 6 (INCHES)
19—
TEST RUN BETWEEN 4.0 FT. AND 5.0 FT.
20 A FOUR HOUR PRESOAK WAS PERFORMED: ❑ YES U NO
SOILS LOGGED BY: JODY MAUS PERCOLATION TEST PERFORMED BY: JODY MAUS
COMMENTS:
PERFORMED BY GEG, Ltd. I, JEFFREY A. GARNESS, CERTIFY THAT THIS WAS PEFFORtyIED IN ACCORDANCE
WITH ALL STATE AND MUNICIPAL GUIDELINES IN EFFECT ON THIS DATE: If 2 Z/a
0006000.
OF 4
..., 1,/ ....... g '((*..—.— -0.6A
GARNESS ENGINEERING GROUP Ltd. a...^ _ r4,' •.!r-00
CONSULTANTS&GENERAL CONTRACTORS - `�t T 000
1701 E. TUDOR ROAD, SUITE 101 • ANCHORAGE.AK. 99507 • PHONE: (907)337-6179 • FAX: (907)336-3246 •WEBSITE: 9on.ssenginetring.com
SOIL LOG - PERCOLATION TEST / 0
(CASE #S11977-1) /• •: •• • iipp 0
LEGAL DESCRIPTION: TUNDRA JEWEL RANCH; LOT 20 — PROPOSED SKY MANOR, LOT 2 //) .•
J f rCE-79 3 Hess, ���
PERFORMED FOR: JOHN THOMSON DATE: 1/30/2013 I14i, ' :II.i (3,••' A,cfX
DEPTH __—� \—— 4e •71...... ...<•47
0
(feet) _ _ ORGANICS TEST HOLE #13 ��0000'
>� LOAM SOIL CLASSIFICATIONS
2 �• •�
— —
••••••••
3 :�•: : • • GP ML
.•:••N• GM �1� CL
••••4 .0 /3'� GC OL
•�•••.• o000 o SW MH
••:••N• QOQ°O oc
.....t. 1".1 SP CH
5 . •
•5 e:•i•• • SM .; OH
••••••e•
6 . • • q SC SEE ATTACHED DRAWINGS
•
•.•. •• I
•••• e DEPTH TO
7 •
�`:;;�. SP WITH GP GROUNDWATER DATE
........ THOUGHOUT
8 ,54•,,. (MORE SAND DRY 1/30/13
•e:.•1♦•• WITH DEPTH) DRY 1/31/13
•••••••
9—•S'•.•e■
••••••• DRY 2/6/13
ot•01164
S....,• DRY 5/29/2013
••:•••••
•••••
11 —.��,.1 DATE READING TIME (MINUTES) READING (INCHES)
.•..•:11,••
1:*.s.' 1/31/13 1 - - 6" —
12—••••...•
.•:eV• 2 — 10 2-3/4" 3-1/4"
13—t
••:;.••••■ 3 — — 6" —
� .t•
•e'•ei•• 4 — 10 2-3/4" 3-1/4"
14—•••• :• 5 — — 6" —
•••••.• 6 — 10 3" 3"
15 ••:•••••
•b;.• 7 — — 6" —
••e•e•• 8 — 10 3" 3"
••••• •• 9 — — 6" —
••••••.•
17 •• ••••• 10 — 10 3" 3"
B.O.H.
11 — — 6" —
18— 12 — 10 3" 3"
PERCOLATION RATE 3.33 (MIN./INCH) PERC. HOLE DIA. 6 (INCHES)
19— -
TEST RUN BETWEEN 4 FT. AND 5 FT.
20 A FOUR HOUR PRESOAK WAS PERFORMED: ❑ YES U NO
SOILS LOGGED BY: JODY MAUS PERCOLATION TEST PERFORMED BY: JODY MAUS
COMMENTS: PERCOLATION READINGS WERE WITHIN 1/16 OF INCH.
PERFORMED BY GEG, Ltd. I, JEFFREY A. GARNESS, CERTIFY THAT THIS WAS PERFORMED IN ACCORDANCE
WITH ALL STATE AND MUNICIPAL GUIDELINES IN EFFECT ON THIS DATE: it 2 Z./(3
GARNESS ENGINEERING GROUP, Ltd.
CONSULTANTS & GENERAL CONTRACTORS
July 11, 2013
Municipality of Anchorage
Development Service Department
On-Site Water & Wastewater Program
4700 Bragaw Street
P.O. Box 196650,
Anchorage, Ak 99519-6650
(907) 343-7904
Ref: Waiver Request for Proposed Lot 7, Skyview Manor Subdivision (S11977-1)
Ms. Wockenfuss:
Per your direction, we are requesting a waiver to the 40,000 sq.ft. minimum lot size for a
septic system for the proposed Lot 7, Skyview Manor S/D. This subdivision of Lot 20;
Tundra Jewel Ranch S/D will subdivide the property into seven (7) separate lots. Lots 1
through 6 meet the 40,000 sq.ft. requirement, but Lot 7 is just shy of the minimum
square footage requirement (38,706 sq.ft.). The following is justification for this waiver:
• The septic reserve area for Lot 7 will be required to be shown as platted
drainfield sites on the plat as shown on our septic reserve map. The platted
drainfield sites meet all MOA wastewater requirements and we have shown
that there is adequate space for these three (3) drainfield sites. The well for the
subdivision is already drilled and has been surveyed. The septic reserve map
shows the accurate location of this well and the 200 foot well radius. In short,
there is adequate area for the proposed septic system for proposed Lot 7.
Based upon this justification, we request this waiver be granted.
If you have any questions, please contact us at 337-6179. Thank you for your
assistance.
Sincerely,
'y L . - • ess, P.E., M.S.
Pre•.idIt
3701 E.Tudor Road,Suite 101 * Anchorage,AK 99507-1259
Ph: (907)337-6179 *Fax: (907)338-3246 * Website: www.garnessengineering.com
Municipality of nc orage , �,, ,
P.O. Box 196650 •• 4700 Elmore Road , ,
\--.._.____- Anchorage, Alaska 99519-6650 • (907) 343-7904 • Fax (907) 343-7997 1).h<�r t m 'ii t
http://www.muni.org/Onsite
Development Services Division
On-Site Water and Wastewater Program
**** VARIANCE/WAIVER REVIEW ****
Legal Description: Proposed Skvview Manor, Lots 1-7 S11977
Engineer: Garness Engineering Group
Applicant: C &T Construction, Inc
Your request for a waiver of the required minimum lot size of 40,000 square feet for proposed
lots in a new subdivision has been approved. The approved lot size for proposed Lot 7 is 38,706
square feet.
Waiver is Granted: X Waiver is not Granted:
Date: 9103 Approved by: /d- A-rfc�. 7,-i-1--
Name of Rev' wer
Rec#: 65549 Amount: $200 Date Paid: 7/19/13
**** VARIANCE/WAIVER REVIEW ****
,, OF 74„, THE STATE Department of Environmental
�7,' AConservation
ofALASKADIVISION OF ENVIRONMENTAL HEALTH
trih� " =” Drinking Water Program
c GOVERNOR SEAN PARNEL[.
pp, 555 Cordova Street
ALA$ Anchorage,Alaska 99501
Main:907.269.3076
Fax: 907.269.7650
thomas.brannan@alaska.gov
September 6,2013
File: 2100.07_DW: Sky Manor
PWSID: 218807
Mr.Jeff Garness,P.E.
Garness Engineering Group,Ltd.
3701 E.Tudor Road,Ste. 101
Anchorage,AK 99507
Re: Sky Manor Wellhouse,Tundra Jewell Ranch Subdivision,Lot 20
New Community Groundwater System- Construction Approval
Dear Mr. Garness:
On June 11,2013 this office received your request for Construction Approval for the above referenced
project. The intent of this letter is to issue Construction Approval for the improvements detailed in
your submittal and outlined below.
Project Description
This project proposes to develop an untreated groundwater drinking water system to serve seven future
duplex housing units in the Tundra Jewell Ranch Subdivision in Chugiak,Alaska.The well to supply this
system was completed on May 14, 2007.The 6" steel cased well was drilled to a depth of 272'and was
grouted with bentonite chips to 20'below ground surface. The well provides a sustained yield of 20 GPM
(gallons per minute) and accesses a presumed semi-confined aquifer,penetrating intermittent lenses of tight
slits, sands,gravels,and mixes thereof. Sampling of the raw water showed it to be free of regulated primary
contaminants. Water will be supplied to the system by a Grundfos well pump,model 25S20-11.Water storage
for the system is provided by two 1,000 gallon tanks plumbed in parallel. From the storage tanks,distribution
system pressure is provided by two Grundfos pumps,model CRE5-9. At the entry point to the distribution
system a 2"Badger master meter,model M120 LL,will be installed.The distribution main for this new
system will consist of approximately 750 linear feet of 3"HDPE (high density polyethylene)pipe and service
connections will be through 1" type"K"copper lines. Also included in the project is the installation of
valves, cathodic protection,and other related appurtenances.
Capacity Development
The owner of this system,John Thomson,provided financial and managerial information. From the
information provided, this system will cost approximately$550 per month to operate;this includes utilities,
engineering,and sampling costs.The total 30 year replacement cost of critical system components is
estimated to be approximately$24,000.This cost will be shared across the 14 housing units. Amortizing this
cost back to present value at a 2% discount rate shows that a fee of approximately$50.00/month/unit should
adequately fund this water system.This fee is comparable with other utilities in the area;however this
estimate does not include any wastewater treatment/disposal costs.Wastewater treatment/disposal systems
will be owned, operated,and maintained by the individual homeowners.
Construction Approval
The submitted engineering plans and supporting information have been reviewed and are approved in
accordance with Alaska Drinking Water Regulations (18 AAC 80). The enclosed Construction and Operation
Certificates,with the Approval to Construct section completed, constitutes written approval.Deviations from
approved plans which affect capacity, flow,pressure,operation,compliance, materials of major system
130906_Sky Manor_218807_CA.docx Page 1 of 3
Mr.Jeff Garness,P.E. September 6,2013
components (particularly any components which do not meet NSF Standard 61),must be approved by DEC
prior to their construction or implementation.
For information on this system's required future water quality monitoring please contact Leticia Tadina (269-
7517), the Drinking Water Environmental Program Specialist for your area.
Interim Approval to Operate
As part of your submittal requesting Interim Approval to Operate,please provide written verification of the
following:
1. Construction of the water system has been completed under the direction of a professional engineer
licensed to practice in the State of Alaska and in accordance with the engineering plans and
specifications;
2. Water distribution lines have been successfully pressure tested;and
3. Water distribution lines,wellhouse plumbing,and the well have been flushed,disinfected,and
sampled for total coliform in accordance with current AWWA Standards C651,C653,and C654
respectively. Provide the location in the system where each sample was taken (plan or station
numbers),the time and date of each sample,and the results for each sample.
4. Certification Form showing that a Priority Measures Plan has been completed. For more
information,please contact Tyler Fanning,269-8924 and visit the Drinking Water Security webpage
at http://dec.alaska.gov/eh/dw/security/security ret s.html
Final Approval to Operate
Final Approval to Operate should be requested within 180 days of receiving Interim Approval to Operate. As
part of your submittal requesting Final Approval to Operate,please provide the following:
1. Record Drawings,stamped and signed by an engineer licensed in the state of Alaska,confirming that
the system meets the requirements of 18 AAC 80. `Record Drawings"refers to the original plans
prepared for construction and department approval,revised to reflect how the system was
constructed or installed.
2. Verification that the water system is being operated by a person appropriately certified for this
system in accordance with 18 AAC 74,Water&Wastewater Certification&Training. For further
questions please contact Ken Smith with the Operator Certification and Training Program at 465-
5136.
3. A Water System Inventory Form completed by an engineer that was involved in the system design or
construction oversight.This form will be used as a baseline for future sanitary surveys, and can be
found on the Drinking Water Program website:
http://dec.alask-t.goviehidwipublicationsi forms.html
Construction Approval Expiration
If the applicant fails to construct,install,renovate, or improve the public water system within two years after
the department issues an Approval to Construct under Drinking Water Regulations 18 AAC 80.210(c), the
approval is void and the plans and information required under 18 AAC 80.210(a) must be resubmitted for the
department review and approval. If during the two-year period the site conditions,plans and information,and
requirements in this chapter do not change,and if the applicant pays the fee required by 18 AAC 80.1910, the
department will grant the applicant an extension.
Construction Approval Limitations
Any changes,constructed or natural,which affects the conditions to which these approval was granted will
void these approval. Issuance of these approvals does not imply the granting of additional authorizations,nor
obligate any federal, state,or local regulatory body to grant required authorizations.This is not an approval of
omissions or oversights by this office or noncompliance with any applicable regulation.The Department's
approval to operate does not guarantee correctness of the functional design or waiver the owner's
responsibility for continued compliance with State regulations.
130906_Sky Manor_218807_CA.docx Page 2 of 3
Mr.Jeff Garness,P.E. September 6,2013
Appeal Process
Any person who disagrees with these decisions may request an adjudicatory hearing in accordance with 18
AAC 15.195- 18 AAC 15.340 or an informal review by the Division Director in accordance with 18 AAC
15.185. Informal review requests must be delivered to the Division Director,Elaine Busse Floyd,555
Cordova St.,Anchorage,Alaska 99501,within 15 days of receipt of this decision.Adjudicatory hearing
requests must be delivered to the Commissioner of the Department of Environmental Conservation,Larry
Hartig,410 Willoughby Avenue,Suite 303,Juneau,Alaska 99801,within 30 days of this decision. If a hearing
is not requested within 30 days, the right to appeal is waived. More information on the Department's
administrative appeals process can be found at the following website:
http://www.dec,state.ak.us/commish/ReviewGuidance.htm.
If you have any questions regarding this plan review please do not hesitate to contact me.
Sincerely,
T.W. Brannan,E.I.T.
Environmental Engineering Assistant I
End.: Construction and Operation Certificate for Public Water Systems
Cc w/Encl: John Thomson
11404 Jessie Mae Cr.
Eagle River,Alaska 99577
Bcc: Leticia Tadina,ADEC Drinking Water Program,via email
Ken Smith,ADEC Operator Certification and Training,via email
Tyler Fanning,ADEC Drinking Water Program,via email
130906_Sky Manor_218807_CA.docx Page 3 of 3
Alaska State of Alaska Department of Environmental Conservation v of 1•44,
''/DEC Drinking Water Program -,. , ..9r
.01
PUBLIC WATER SYSTEM -• �; •
itCONSTRUCTION AND OPERATION CERTIFICATE "Alik___
" Approvals listed below are for compliance with the requirements of the State of Alaska '' ;: 4- •
Drinking Water Regulations 18 AAC 80. Any approvals granted do not imply or grant any "^ '
other federal,state or local authorizations that may be required.
Water System Name: Sky Manor PWSID: 218807
Water Source: Groundwater Classification: Community
57 System Wide Approval E 1VIodification Approval
Project Description:
New untreated community groundwater system to serve 84 persons,existing well is 272' deep. Includes the installation of
well pump,two 1,000 gal. storage tanks in parallel,two distribution pumps,and distribution main.Distribution main is 750
LF of 3"HDPE.Also includes valves,cathodic protection,and other related appurtenances.
A. APPROVAL TO CONSTRUCT
Plans submitted in accordance with 18 AAC 80.205 by Mr.Jeff Gamess, P.E.have been received and are
r.7 2.2 = -. . submitted r conditionally approved;see attached letter
"„------k . Environmental Engineering Assistant I 9/6/2013
T.W.Brann.1 ' a�ng Engineer) (Title) (Date of Approval)
If applicant fails to construct, alter, install, or modem the system within two years of the date of approval to construct,
approval is void, and plans must be resubmitted for Department review and approval(as per 18 AAC 80.215(a)).
Approved Change Order
Change(contract order number or description):
(Reviewing Engineer) (Title) (Date of Approval)
B. APPROVAL TO OPERATE
This section must be completed and signed by the Department before any water is made available for public use.
Interim Approval to Operate:
This interim approval to operate expires on .It is illegal to operate a public water system beyond the
expiration date without Final Approval to Operate from the Department.
(Reviewing Engineer) (Title) (Date of Approval)
Interim Approval Extension:
This interim approval to operate has been extended to .
(Reviewing Engineer) (Title) (Date of Approval)
Interim Approval Extension:
This interim approval to operate has been extended to .
(Reviewing Engineer) (Title) (Date of Approval)
Final Approval to Operate
Record drawings and other documents submitted to the Department, or an inspection by the Department, has confirmed
that the public water system was constructed in substantial conformance to 18 AAC 80.
(Reviewing Engineer) (Title) (Date of Approval)