ON-SITE WASTEWATER INSPECTION REPORT
Permit Number: OSP191327 PID Number: 051-081-08-000
Dwelling: ❑■ Single Family (SF) ❑ with ADU ❑ Duplex (D) ❑ Two Single Family Project:❑ New ❑ Upgrade
Name
Moore Oliver & Venita Fam Trst
ABSORPTION FIELD
❑t Deep Trench ❑ Wide Trench ❑ Bed ❑ Mound
Site Address
21902 Knik Vista St. Chugiak, AK 99567
❑ Other
Phone
Number of Bedrooms
Soil Rating
Total depth from original grade
907-242-5089
3
0.45 GPD/SF
14.0 Ft.
LEGAL DESCRIPTION
Depth to pipe invert from original grade
5.0 Ft.
Gravel depth beneath pipe
9.0 Ft.
Subdivision Block Lot
LT 58
Fill added above original grade Gravel length
1.5 Ft. 57 Ft.
Township Range Section
T1 5N R1 W SEC 5
Gravel width Beds: Number of Lines Distance between lines
2.5 Ft. Ft.
SEPARATION DISTANCES
To
Septic
Absorption
Lift Station
Holding
Sewer
Total absorption area
Number of trenches
Dist. between trenches
From
Tank
Field
Tank
Line
1026 Ft2
1
Ft.
Well
116
145
TANK 9 Septic ❑ S.T.E.P. ❑ Holding ❑ Other
Manufacturer
Infiltrator
Capacity
1000 Gal.
Surface Water
800'+
800'+
Material
Number of compartments
Lot Line
95
59
NA
Polypropylene
2
Foundation
10
44
LIFT STATION
Manufacturer
Capacity
Remarks
Extended TH #2 an additional 3 ft to verify
Gal.
no impermeable layer. Monitored for groundwater
Alarm location
Electrical installed by
for 7 days; none found. Revised soils log attached.
PIPE MATERIAL House to tank PVCTank to PVC
drainfield
Installer
Fischer Bros. Excavation, LLC
*All PVC ASTM D3034Drainfield PVC CO/MT PVC
Inspector Scott Roelfs, PE (VEI Consultants)
BENCH MARK (Assumed elevation) 524.7 ft
Inspection v, 9/24/19 9/25/19
Location and description
2nd
31" 9/25/19 4`h 10/3/19
Finish Floor of House
ON-SITE WATER AND WASTEWATER SECTION APPROVAL
Engineer's Stamp
4%-0 0,
Conditional Approval: Date
Q�.• / �`�
1 •rr
.: � •• 9TH ��� •'.
00131Scott Thackery Roelfa �: •C,-00
�: •, CE ! $ 4 .; �6AW
Septic System
00--m-65
Approved Date a� ab s
� F,'•.) �%v��' ,c.��
Note: this approval does not include well permit requirements.
pP P q`j`,ESS''�tti
.,,
� k
trcev uoiuzn o/
T I I
I �<
o —
��Ga
N
72
100• WEl RADIUS
73A / 73B
EPTIC
YSTEMS /
II
z
o F��
59
58
SEPTIC SYSTEM •
PLAN - Pg 2
PROFILE - Pg 3
So'
,00,
3 -BEDROOM
HOUSE
WELL
• iH#1 TH#Z
0
�TM�
\
EF—
72
100• WEl RADIUS
73A / 73B
EPTIC
YSTEMS /
II
y
GRA SSER RD
EXISTING
SEPTIC
SYSTEM
70,
I
8A
�G
5
RECORD DRAWINGS
z
o•
So'
,00,
y
GRA SSER RD
EXISTING
SEPTIC
SYSTEM
70,
I
8A
�G
5
RECORD DRAWINGS
r/
I 511
moo
Rqa uS \
NE HOUE ?��4
FOR
77�Wl
O \ CO
PROPOSED
3 -BEDROOM
HOUSE
FINISH FLOOR
ELEV = 524.7
(BENCHMARK)
�4,
DESIGN CRITERIA
No. OF BEDROOMS: 3
GALLONS PER DAY: 450 GPD
PERCOLATION RATE: 35 MIN/INCH
ALLOWABLE APPLICATION RATE: 0.45 GPD/SF
MINIMUM EFFECTIVE ABSORPTION AREA: 1000 SF
DEEP TRENCH
MAXIMUM DEPTH: 15.5'
WIDTH: 2.5'
LENGTH: 57'
DEPTH OF SEWER ROCK: 9.0'
EFFECTIVE DEPTH: 9.0'
EFFECTIVE ABSORPTION AREA: 1026 SF
m#1
221'
BEND so 4" PVC
10'.
L
9
h+#
— — — — —DEEP TRENCH —
L' — — — — — — — — — —
DOUBLE 571 x 2.5'W x 9' DEPTH BELO II
CO
POTENTIAL REPLACEMENT SYSTEM
�
/
1000 GALLON POLYETHYLENE SEPTIC TANK (INFILTRATOR)
MANWAY RISER (20"0 MIN) SERVING FIRST COMPARTMENT
4"0 STANDPIPE TO OTHER COMPARTMENT
2" INSULATION IMMEDIATELY OVERTOP TANK
NE GARAGE CORNER
\ FOR SWING TIES
LOT 58, SEC ION 5, T15N, R1 W,
\II\ SEWARD MERIDIAN
I � \
PRO OS
\ ED DRIVE
I _
10' 20'
h
—
co
M T
ERF PIPE
59.3 I
TO
IL'.
RECORD DRAWINGS
SWING TIE DISTANCES (FT)
COMPONENT
FROM NE HOUSE CORNER FROM NE GARAGE CORNER
FOUNDATION CLEANOUT
3.1
35.6
TANK MANWAY
12.5
39.8
TANK STANDPIPE
17.1
42.1
DOUBLE CLEANOUT
31.6
49.1
WEST MONITORING TUBE
44.8
55.8
TRENCH CLEANOUT
100.1
99.8
EAST MONITORING TUBE
100.3
99.0
59.3 I
TO
IL'.
RECORD DRAWINGS
............................................................................
Co IMT
NO GRD
WATER
10/3/19
........................................................ MT ..
........... __
DOUBLE
NO GRID WATER 10/3/19
CID
0 9 fl I /- FINISHED GRADE
525 0 MANW S ANDPIPE 525
FINISH FLOOR ELEV = 524.7
.(BENQJAMARK)
TH,y -
TOP OF HOLE = 523.1
ZEXISTING
BTM OF HOLE = 502.1
NO'GRD WATER 7/29%19
AND 10/3/19
GROUND
520 11Z%I 1 11 111 1 1 lif 520
22 '
4" PVC BEND
2%
INVELEV = 519.50 ................................. .... oy,....... ........... ......
4' PVC i =1= `fes, i�—_4_PERFQRA7ED_ P�C� _� =
TANK INLET ELEV = 519.27//
.... ...........
INV ELEV
.. .......
= 518.54.. .... � o.
TANK OUTLET ELEV 519.020 o
1000
GALLON `. . .
....................... �.
TANK
515
DEEP
515
..��. OF ANG,,♦
1�`P�� •�S♦•� 510
o� o� `oma o `0 0 0 `0 0 0 o I 510
i �'�' : J •� 0+00 BTM TRENCH ELEV = 509.5
••
AF�=� 49th ��
�.....:: .. .................cl:.....� 0+50..........................................
_ 1+00
SULTANTS
........
Lr•••••�••:• 13451 RUDN KOF CIRCLE
......::........1�.......
SCOTT T. ROELFS w Aw
118 4,W SEPTIC SYSTEM RECORD DRAWINGS
� VEI LOT 58, SECTION 5
*j FO ....... TOWNSHIP TOWNSHIP 15N, RANGE 1W, SEWARD MERIDIAN Consultants
�NI ;��5�;..•' R E C 0 R D DRAWINGS VERT
CALF 1:=2 DATE: 1/15/2D GRID: NWI457 Pg 3 OF 3
PERT SCALE: 1'=2'
VEIConsultants
Civil Engineering and Surveying Consultants
Serving All of Alaska
1345 Rudakof Circle, Suite 201
Anchorage, Alaska 99508
FAX: (907) 338-5386
Phone: (907) 337-3330
SOILS LOG — PERCOLATION TEST
PERFORMED FOR: Oliver and Venita Moore DATE PERFORMED: 6/26/19, extended 9/25/19
LEGAL DESCRIPTION: Lot 58, Sec 5, T15N, R1W, S.M. TOWNSHIP, RANGE, SECTION: T15N, R1W, Sec 5
PERFORMED BY: Scott Roelfs, P.E.
TEST HOLE No. TH #2
DEPTH
(FEET)
0 -
Topsoil
:.V SW
2- '�;.,: sand,
some gravel
3 - SP
4 :*.; : fine sand,
; some gravel
5- '.: :::':.
6-
7-
8-
9-
10 - SP
11- fine
sand
12-
13-
14-
15-
16-~_
17-
18 - 6/26/19
19-
20-
21-
9/25/19
.•��� OF 14 tit
•:�4
0
49th�0
I SCOTT T. 6ELF e
•���i •• C 118 _AV
�e pF0 ••........
SLOPE
vi
TOTAL DEPTH OF TESTHOLE 21.0
GROUNDWATER ENCOUNTERED: ® ❑
NO YES
DEPTH TO GROUNDWATER:
GROUNDWATER ENCOUNTERED: ® ❑
(After Monitoring) NO YES
DEPTH TO GROUNDWATER:
MONITORING DATE: 7/29/19
,n /z Mn
w
a
0
En
SITE PLAN
I
I I
I I
I I
TH #1 TH #2
I ® ® I
I TH #3
I II
Date
Reading
Gross Time
Net Time
(min.)
Depth to Water
(inches)
Net Drop
(inches)
6/26/19
1
14:38
0
2
14:52
14
1 1/2
1 1/2
3
15:01
9
2 1/4
3/4
4
15:09
8
2 7/8
5/8
5
15:14
5
3 1/4
3/8
6
15:23
9
3 7/8
5/8
7
15:30
7
4 3/8
1/2
8
15:40
10
5
5/8
9
15:50
10
5 1/2
1/2
PERCOLATION RATE 13.1 (minutes/inch) PERC HOLE DIAMETER 6.,
TEST RUN BETWEEN 6.0 FT AND 7.0 FT
COMMENTS: Pre—Soak 4hrs
Extended from 18.0 to 21.0 on 9/25/19
PERFORMED BY VEI CONSULTANTS. I, SCOTT T. ROELFS , CERTIFY THAT THIS WAS PERFORMED IN
ACCORDANCE WITH ALL STATE AND MUNICIPAL GUIDELINES IN EFFECT ON THIS DATE:
Wheaton Vater We, enc.
1190 N. Wasilla-Fish hook Road
Wasilla, AK 99654
(907)376-2041
Name:
Hall Quality Homes
Address:
PO Box 1987
City:
Wasilla State:
AK Zip Code: 99654
Well Site: T15 rJ
KA -3 Sec 5
Lot/Block: rj g
Additional:
21902 Knik Vista St., Chugiak, AK
Well Depth:
77 ft
From:
To: Formation:
0
11 sand/silt
Below Ground:
75 ft.
11
33 sand/gravel/silt
Above Ground:
2 ft.
33
54 silt/gravel
Gal/Min:
30
54
63 damp silty gravel
63
77 gravel/water
Static Level:
57 ft.
Casing:
77ft. of 6 in. x .25 in. steel
Liner Pipe:
N/A
Screened:
N/A
Perforated:
N/A
Grouted:
YES, Bentonite
` VAf ER QUALITY TESTING
Coliform 10 t /900rt�L
Depth:
N/A
Nitrates 3491A �L
Develop. Method:
Air
Arsenic N D
1 z3 2020
Use of Well:
Residential
Drilling Method:
Rotary
Misc:
Other:
chlorinated to 50ppm
The well was pumped 5' off the bottom with 100% draw down for 2 hours and recovered at 30.
Date Drilled:
9/19/2019 Driller:
Ben Mattson
Development Services Department
Building Safety Division
GE 8U
On -Site Water & Wastewater Program
4700 Elmore Road
z. x
P.O. Box 196650
Mark Begich Anchorage, AK 99507 s A E T
Mayor www.muni.org/onsite
(907) 343-7904
Pump Installation Log
Well Drilling Permit Number: SW OSP191327 Date of Issue: 07/28/2019
Parcel Identification Number: 05108108000
Legal Description Property Owner Name & Address:
Township 15N, Range 1W, Section 5, Lot 58 Oliver and Venita Moore
PO Box 670732
Chugiak, AK 99567
Pump Installation Date: 12/06/2019
Pump Intake Depth Below Top of Well Casing: 70
Pump Manufacturer's Name: Meyers
Pump Model: 1/2 hp 12 GPM
Pump Size 1/2 hp
Pitless Adapter Burial Depth: 16 feet
Pitless Adapter Manufacturer's Name: Campbell
Pitless Adapter Installer: Unknown
Well Disinfected Upon Completion? ✓❑ Yes ❑ No
Method of Disinfection: Sterilene
Comments:
Pump Installer Name: Wheaton Water Well, Inc.
1190 N. Wasilla-Fishhook Road
Wasilla, AK 99654
feet
Attention: The pump installer shall provide a pump installation log to the DSD within 30 days of pump installation.
el 133HS
F71- -70 lj 0,
('06)
29566 "
29 10-1 VV19 �Dzlf,31")6!D
s7uq7tnsuoj
17111 SV G/A
L)rySDIV 5qtpJ0Xly -15D30tPUV 'UBT�Jafl PJDM--S *18 V911 ',r 0 -IS V.9 X7
AToTLd7MYU'-7v—o,y7
6102 'Ylfl ANW-ON PalalduIX 1(9-nS VDId
ay/ uo Umoys SD p-aqsijppa -,o punoj U9aq aADY
vaujM) j9/ JID ;DLI; PUD 111-19JJW UhlOYS aJD
S6 quopq pun s.,ouDislip gyj IDY) PUD 'Pa1,9AJnS
dljonpo SPUD/ jo UQqDJU.-Sajdai joaj-101 PUD
aag D sf 49-nS /07 S�lqj 10q; Ajryaa Aq;'Jay Op
'joAq-- puol 1DuQssvjo.1d TW -Y 7 uculaA 7
-umoqs asimj@q4o ssajun '9961 ql�[ XDN
`uD'P!-JGN PJC)mE)S 'ML abul)�J 'N91 diqsumo_L 'q uoijo@S
jDjd ;Dc)-jq puis A-iq LUOAJ Uol;E)W-10�ul P)03Gq
S-ql0N
Fdlkvm
ofi 3-J V') s
X 'A �07
J,
IVYZ
OZ__..
azz
i L s --]/Vi V C',
1,99.69N Uhl -S8 'W 00'99 :J,, Z- 1, e q-. 6 N
3,0�-. 'Tr, .,--" N- f7T'ggl
--? 1 :1, 0 ,IS .68N
3 A i Lr f
T] A, fid,
3 4 f 1. 1 AJ
0 2 L
ti "yl
9
3-3 D N 0 cl,
0
co
CD -d 10 H N VIA
SI Z
Z
ih ro 0 CD
rTj C5
VR
(5
7� 'U
cS
CO � <
CO C>
CIO i
bvi
7..
C� '00,m� is3m vile
(Z --V-66 '23) -VZ-*�6Z 3,,-V9,C9.62S ONPAV39 JO SlSV8
V �V&'- �9, 6 r� �.6 8
avow wgss�wo 0
03Z
U —66)
>l X0079
G,9-nS N-1-371,11 VIN>l
tl
'ON ;Did 'PJODGH
xx
PAODaH
(W
SDO
auoLjdaj@j_
i
DIJ�Oaj] PD@qJ@A0-3/HO
XDMaAfJ(]/PDOd—
G,iod 4nn
tZ
11GIM
4noUD@jo OljdaS
0
3d), qj!M ADq,9d "q/g punoj
0
}sod uo dD3 wanly J�� 'juawnuoyl punoj
01-6
}sod LunjV ,JZ uo dD:) wnIV 'juawnuoN punoj
Fdlkvm
ofi 3-J V') s
X 'A �07
J,
IVYZ
OZ__..
azz
i L s --]/Vi V C',
1,99.69N Uhl -S8 'W 00'99 :J,, Z- 1, e q-. 6 N
3,0�-. 'Tr, .,--" N- f7T'ggl
--? 1 :1, 0 ,IS .68N
3 A i Lr f
T] A, fid,
3 4 f 1. 1 AJ
0 2 L
ti "yl
9
3-3 D N 0 cl,
0
co
CD -d 10 H N VIA
SI Z
Z
ih ro 0 CD
rTj C5
VR
(5
7� 'U
cS
CO � <
CO C>
CIO i
bvi
7..
C� '00,m� is3m vile
(Z --V-66 '23) -VZ-*�6Z 3,,-V9,C9.62S ONPAV39 JO SlSV8
V �V&'- �9, 6 r� �.6 8
avow wgss�wo 0
03Z
U —66)
>l X0079
G,9-nS N-1-371,11 VIN>l
tl
tooPAL: MUNICIPALITY OF ANCHORAGE
On-Site Water &Wastewater Program
PO Box 196650 4700 Elmore Road
Anchorage,Alaska 99519-6650 Phone: (907)343-7904 Fax:(907)343-7997
http://www.muni.orglonsite
411 :781,
I cpartrncnt
4NCHONa<E
On-Site Water & Wastewater System Permit
Permit Number: OSP191327 Effective Date: 8/9/2019
Work Type: WellSeptic Initial Expiration Date: 8/8/2020
Tax Code Number: 05108108000
Site Legal Address: T15N R1 W SEC 5 LT 58 G:1457
Site Mailing Address:
Owner: MOORE OLIVER & VENITA FAM TRST Lot Size in Sq Ft: 108900
Design Engineer: VEI CONSULTANTS Total Bedrooms: 3
This permit is for the construction of:
Q Disposal Field 2 Septic Tank 0 Holding Tank 0 Privy Q Private Well 0 Water Storage
All construction shall be in accordance with:
1. The attached approved design.
2. All requirements specified in Anchorage Municipal code Chapters 15.55 and 15.65 and the State of Alaska
Wastewater Disposal Regulations (18AAC72)and Drinking Water Regulations (18AAC80)
3. The wastewater code requires inspections during the installation. The engineer shall notify the Development
Services Department per AMC 15.65. Provide notification by calling (907) 343-7904 (24/7).
4. From October 15 to April 15, a subsurface soil absorption system under construction during freezing weather
shall be either:
a. Opened and Closed on the same day, or
b. Covered, sealed, and heated to prevent freezing
Special Provisions:
Proposed system too deep for soils information submitted. The Engineer needs to do an additional test hole prior
to the construction of the septic field. Construction may proceed at your own risk before the 7 day water
monitoring is complete. Please submit stamped and signed results with the As-built Inspection Report. If the
results require a design change, construction of the system will stop pending On-Site review and approval.
Received By: Date: 8
Issued By: i6d 6!..1d-r Jt Date:
MUNICIPALITY OF ANCHORAGE
(7.P' .
Development Services DepartmentR,`I Phone: 907-343-7904
On-Site Water & Wastewater Section Fa • 'f g' ° -7997
n)-001 1 41'4)
N
ON-SITE SEPTIC/WELL PERMIT APPLICATION n. JUL 3 U 2019
AA-
'V
I6 w
Parcel I.D. 05108108000 << 9�\
Oliver and Venita Moore o7-Z ! ��
Property owner(s) Day phone a".
Mailing address Fo t3c) Cod d- Z C NLG IAk- AK- c195(7
Site address
Legal description (Sub'd., Block & Lot) Lot 58
Legal description (Township, Range & Section) Township 15N, Range 1W, Section 5
Lot Size 108900 Sq. Ft. Number of Bedrooms 3
APPLICATION IS FOR: APPLICATION IS AN: TYPE OF DWELLING:
(0 all that apply)
Absorption Field x Initial n Single Family (SF) 0
(w/wo ADU)
Septic Tank H Upgrade H Duplex (D) ❑
Holding Tank Ii Renewal ❑
Multiple Dwellings
Privy (SF and/or D)
Private Well x
Water Storage
THIS APPLICATION INCLUDES A WAIVER REQUEST FOR:
Distance:
I certify that the above information is correct. I further certify that this is in accordance with
applicable Municipal Codes.
ez - .. ,� 0'76 crZaM
C
(Signature of property owner or authorized agent)
Permit/Rush Fees: 4 82O Waiver Fees:
Date of Payment: "MON Date of Payment:
Receipt Number: c1 nAt!070( Receipt Number:
Permit No. Qvl''``Z/ /3,27 Waiver No.
G:\Development Services\Building Safety\On Site Water and Wastewater\Forms\Client Forms\Permit Application.doc
VE1
Consultants
Civil Engineering and Surveying Consultants 1345 Rudakof Circle, Suite 201
Serving All of Alaska Anchorage, Alaska 99508
FAX: (907) 338-5386
Phone: (907) 337-3330
August 6, 2019
Municipality of Anchorage
Development Services
On-Site Water and Wastewater Program
P.O. Box 196650
Anchorage, AK 99519-6650
Re: On-Site Sewer and Private Water Well for Lot 58, Section 5, Township 15N,
Range 1W, S.M. (Grid NW 1457)
Narrative and Permit Application
To whom it may concern,
VEI Consultants was contracted to design an onsite wastewater disposal system at the
above referenced property. A new three(3) bedroom single family residence is being
constructed on the property. The proposed house, well and septic system locations are
shown on the attached Site Plan, Sheet 1. We request that you approve the attached permit
application for construction of the wastewater disposal system and the drilling of a new
private water well.
Soils
VEI conducted field investigations including surveying,digging test pits, performing
percolation tests and groundwater monitoring. The Soils Log—Percolation Test for Test
Holes#1, #2, and#3 are attached; all test holes are in the vicinity of the proposed disposal
field. No groundwater has been observed in these test holes/monitoring pipes and soils
logs from surrounding properties led us to believe that groundwater is not an issue in this
area. Still, we are requiring the contractor to extend all three test holes(if necessary)to
verify there is no groundwater or impermeable strata within 6 feet of the bottom of the
proposed trench once the bottom elevation has been set in the field. We anticipate our test
holes will need to be extended 1 to 2 feet.
Unfortunately,the percolation tests were not performed using the procedure outlined in
AMC Chapter 15.65.210. However,the tests were performed using a falling head method
(never exceeding the 8" of head outlined in code)and the percolation rate was calculated
using the entire test(total minutes/total inches). We performed the tests multiple times
throughout the day and we witnessed repeatable results. Only the last test of the day on
each hole was provided on the soils log. Therefore, we are confident that we calculated
conservative percolation rates.
On-Site Wastewater Disposal System—Specifications,Lot 58,Section 5, Township 15N, Range 1 W,S.M.
August 6,2019
Page 2 of 2
Additionally, we have chosen a conservative application rate of 0.45 gpd/sf in the design of
the trench. Test Hole#1 had a slower percolation rate than the others, so we decided to
locate our trench closer to the other two test holes.
Surface Water & Topography
There are no surface waters within 100 feet of the proposed system. Additionally,no
seasonal surface water has been observed collecting anywhere on the property. The
general slope of the lot is from southeast to northwest at a grade ranging from 2%-10%.
An embankment,with a height of 50 feet and slopes between 40%to 70%, runs down the
center of the property from the southwest to the northeast. The proposed absorption trench
is greater than 50 feet from the top of the embankment.
Trench Design
See the attached design drawings and specifications for the proposed deep trench
absorption system design. The proposed system will not alter the existing site topography
or drainage patterns. The ground surface above the disposal field will be filled up to 1 foot
above existing to ensure that surface water does not collect above the trenches. The area
will be graded to ensure positive drainage across the absorption trench.
There are no adjacent private wells within 100 feet or community wells within 200 feet of
the proposed system. We do not expect there to be any adverse effect on adjacent lots by
the construction of this system.
Water Well
The well will be sited,drilled and completed in accordance with standards and provisions
in AMC Chapters 15.55 and 15.65. The proposed well location exceeds all minimum
separation distances.
If you have any questions, please contact me at 337-3330.
Sincerely,
VEI CONSULTANTS
Scott T. Roelfs,,
•
Attachments: Overall Site Plan 1"=100' (Revised)
Proposed Septic System Plan(Revised)
Construction and Material Specifications(Revised)
T
/
N r
1
c �
..„..,
I o
j ,,
z
.„.
..i
2
�� o• so' goo'
GRASSER RD
Fb• sS� A�,POAq0' _41
4.
59 58 '°o\, •
i y EXISTING
SEPTIC
PROPOSED SEPTIC SYSTEM SYSTEM
SEE DESIGN PAGE 2
. ,,,,,,,14, -‘, `
PROPOSED 0
. 3-BEDROOM •
• HOUSE .
PROPOSED 0.4
WELL • T HM1 TH#2 1 RA°,Gs
• ) • ® ® I
9 0
/ T"+® '''T
\ 8A
;:PROPOSED DRIVEtl p�
/I 0
.
o ,,, . _
72
l9
....... r
O \///, 73A / 73B o
O /
m
� ,a
5v8
AIPP
F., ' T I
, , 0m
_____ — _..,...r.,,,,,
oN
._ ,
/
... 41P41,P'
EXISTING
.10�\\\\111 SEPTIC / I = N
.�• OF , 4.. SYSTEMS
•••1
' '........ . ..**1.677.
.: 9th �:: 1%
• i��7
• f,,,,,,:, ,: VEI CONSULTANTS
j s� SCOTT T. R9ELFS 1345 RUDAKOF CIRCLE
♦♦., CE- •' '�,=i SITE PLAN FOR SEPTIC SYSTEM DESIGN VE1•AF� $�6 I..�.�Z�� LOT 58, SECTION 5
w.�e.D pROFESSIO1\`�P:�•. TOWNSHIP 15N, RANGE 1W, SEWARD MERIDIAN Consultants
,11�\\\illi.• HORZ SCALE:1'.100' DATE: 5/6/19 GRID: 5*1457 P9 1 OF 2
e �a / / DESIGN CRITERIA
No. OF BEDROOMS: 3
/ / / GALLONS PER DAY: 450 GPO
f/ V // PERCOLATION RATE: 35 MIN/INCH
'a.2 /'/" e` 522 ALLOWABLE APPLICATION RATE: 0.45 GPD/SF
� 7 / fJ��,►� if-'',"5,..� M NIMUM EFFECTIVE ABSORPTION AREA: 1000 SF
lic
�/ f/� A14, DEEP TRENCH DESIGN
�� �- /4,oe S c",I,C MAXIMUM DEPTH: '3.5'
y WIDTH: 3'
.. 114 ,'' LENGTH: 56'
�,`�� r DEPTH OF SEWER ROCK: 9'
EFFECTIVE DEPTH: 9'
/ -••-•-7
EFFECTIVE ABSORPTION AREA: 1008 SF
2" INSULATION IF COVER <3' 0' 10' 20'
ALWAYS M/d,U+1TAIN 2' OF COVER MIN
/ hip 114#2
iINSTALL 1231 ISI
FOUNDATION
r'"... CLEANOUT
WITHIN 4 FEET..- .._ _
22} MT PROPOSED DEEP TRENCH
• BEND 2R TO TRENCH
-, T O DOUBLE CO 56'L x 3'W x 9' DEPTH BELOW PERF PIPE MT,_,,, 1„„
�' SEE DESIGN CRITERIA.
Rgp`i' i ' TA KEET OF 5904
Gs + 1,to,o
\ Y --0.4
POTENTIAL REPLACEMENT SYSTEM
PROPOSED TH j3
181
3—BEDROOM \
HOUSE ---
\ INSTALL 1000 GALLON POLYETHYLENE SEPTIC TANK
MAN WAY RISER (20"0 MIN) SERVING FIRST COMPARTMENT
4"0 STANDPIPE TO OTHER COMPARTMENT
MAX 4 FEET OF COVER — USE 2" INSULATION IMMEDIATELY OVERTOP TANK
ALWAYS MAINTAIN 2 FEET OF COVER MIN
N.
1
L � � \ \ 1
6K, LOT 58, SEC'i1 ON 5, T1'5N, R1 W,
s4 SEWARD MERIO}IAN
` ` 1
N - - - - _ -
‘
I1t \ � _� PROPOSED DRIVE '/'
40011111_,11%ii li.
•
Ar `�'.,flk 1, *SIS
0,,C" .t ~ ~"" 'L"��r ��_ VE CONSULTANTS
0 SC6TT T. Eg.S-"' : L., 345 RUDAKOF CIRCLE
IF
♦+ ..... 2E-8 ':G- � SEPTIC SYSTEM DESIGN 17S". VE'I
*� 'OFESSIQ\A4�� TOWNSH;P 15N, RANGE 1W, SEWARD MERIDIAN Consultants
'II•auttf>> NORZ SCALE 1'.20' DAR:wig ,coq: NWI457
{ Pg 2 OF 2
VE1
Consultants
Civil Engineering and Surveying Consultants 1345 Rudakof Circle, Suite 201
Serving All of Alaska Anchorage, Alaska 99508
FAX: (907) 338-5386
Phone: (907) 337-3330
August 6,2019
ON-SITE WASTEWATER DISPOSAL SYSTEM
CONSTRUCTION PRACTICES AND MATERIAL SPECIFICATIONS
LEGAL DESCRIPTION: Lot 58, Section 5,Township 15N, Range 1W, S.M.
GENERAL:
1. The scope of this project includes the installation of a new onsite wastewater
disposal system to serve a new 3 bedroom single family residence being
constructed on the referenced property.
2. Upon determining the bottom elevation of the trench,the contractor shall extend the
three test holes (if necessary)to verify the water table is greater than 6 feet from the
bottom of the proposed trench. Verify there is no bedrock or impermeable soil
layer within 6 feet of the bottom of the proposed trench. Monitor groundwater for
an additional 8 days after extending test holes.
3. Construction shall be in accordance with the approved site plan and design
drawings,municipal permit with any special provisions or conditions,and all
applicable Municipal Wastewater Disposal Regulations. Any deviation from the
site plan and design drawings requires engineer approval.
4. The contractor shall be responsible for obtaining any necessary underground utility
locates.
5. Groundwater monitoring test pipes shall remain in place and functional until
construction of the disposal field has begun. If the test holes are required to be
extended when the bottom elevation of the trench is determined, groundwater
monitoring will be performed for an additional 8 days. After construction of the
disposal field has begun, or 8 days after test holes are extended(whichever
timeframe is later)test-hole excavations shall be filled and the monitoring tubes
removed.
6. Contractors installing wastewater disposal systems must be certified by the
Municipal Onsite Water and Wastewater Section for systems installations. Owners
installing their own systems must also receive prior approval from the Municipal
Onsite Water and Wastewater Section.
SEPTIC TANK INSTALLATION:
1. Septic Tank shall be a minimum of 1,000 gallon. The tank shall be constructed of
polyethylene and shall be pre-approved by MOA for installation. The contractor
shall ensure that the fill over the tank does not exceed the burial depth rating
(typically 4 feet for polyethylene).
On-Site Wastewater Disposal System—Specifications,Lot 58,Section 5, Township 15N, Range 1W,S.M.
August 6,2019
Page 2 of 4
2. Septic Tanks installed with less than 4 feet of cover shall be insulated. Minimum
cover with insulation shall be 2 feet. Insulation shall be placed immediately above
the top of the tank.
3. The sewer piping from the foundation cleanout to the septic tank shall be 4 inches
laid at a 2%slope. If cover is less than 3 feet, insulate with 2 inches insulation.
Always maintain 2 feet of cover.
4. Construction shall include a 20 inch(minimum)diameter watertight manway riser
serving the first compartment of the tank. The riser, including the cover, shall be
insulated with 4 inches(minimum) insulation extending to 48 inches below grade,
or to the tank insulation. The insultation shall be of a MOA approved type suitable
for below grade applications. Exposed insulation above grade shall be protected
from UV damage. The riser lid shall be secured(lockable)to prevent unintended
access. The riser lid shall match the final grade. Use a 4 inch (minimum)diameter
standpipe with airtight cap to provide effective access to each of the remaining
compartments. All standpipes on the septic tank shall extend to a minimum of 12
inches above final grade
5. All septic tanks shall be fitted with watertight couplings,approved by MOA, at the
pump out attachments and on the inlet and outlet of tank.
6. In the line between the tank and the absorption system there shall be two opposing
cleanouts (double cleanout). The cleanouts shall be located on undisturbed soil not
more than ten feet from the tank. The first cleanout in the line shall be to clean the
line toward the absorption system and the second cleanout will be oriented to allow
cleaning toward the septic tank.
7. The septic tank shall be sufficiently bedded with proper material and compacting to
prevent settling or shifting of the tank.
8. The sewer piping from the septic tank to the absorption trench shall be 4 inches laid
at a 2% slope. If cover is less than 3 feet, insulate with 2 inches insulation. Always
maintain 2 feet of cover.
9. Insulation shall be placed over any wastewater line or pipe over which a driveway,
parking, or vehicle storage area may be constructed.
ABSORPTION TRENCH INSTALLATION:
1. Excavate the proposed deep trench to the dimensions shown on the design. The
bottom of the trench shall be within 4 inches of level. Smeared trench sidewalls
shall be raked or scarified before sewer rock placement.
2. Once the sewer rock is installed,the distribution pipe is to be installed level with
perforations faced downward. Gravel is then to be placed over the distribution pipe
to provide a minimum of 2 inches of cover over the pipe.
3. A permeable nontoxic geotextile silt barrier must be installed between the final
gravel layer and native backfill. Ensure that the silt barrier covers the entire gravel
surface before placing backfill.
4. Monitor tubes shall be of 4 inch diameter, installed approximately in the locations
shown on the design, and extended a minimum of 12 inches above final grade. The
portion of the monitoring tube extending through the gravel shall be perforated
from the bottom of the trench to the invert of the distributing pipe.
On-Site Wastewater Disposal System—Specifications,Lot 58,Section 5, Township 15N,Range I W,S.M.
August 6,2019
Page 3 of 4
5. Backfill over the final sewer rock layer must not be less than 24 inches. Insulation
shall be installed when the backfill depth is less than 36 inches. The finish grade
over the trench shall be mounded to prevent formation of depression after settling.
6. Insulation shall be placed over any wastewater line or pipe over which a driveway,
parking, or vehicle storage area may be constructed.
7. Contractor shall verify the absorption system is minimum 100' away from any
private wells in the area.
MINIMUM MATERIAL SPECIFICATIONS:
1. A MOA approved septic tank manufacturer must construct any septic tank
proposed for installation.
2. Insulation shall be at least 2 inch thick extruded direct burial polystyrene(Dow
Chemical Company Styrofoam HI, Insulfoam R-Tech IV, or equal)
3. Septic tank inlets and outlets shall be fitted with watertight couplings(Caulder,
Fernco,or equal)
4. A permeable nontoxic geotextile silt barrier(Typar 3401, Mirafi 140N,or equal)
shall be installed between the final sewer rock layer and the native soil backfill.
5. All leachfield gravel (sewer rock) shall be 0.5"-2.0"screened gravel with less than
1%passing the#200 sieve.
6. The following pipe materials are MOA approved for use in septic system
installations:
Type of Pipe Perforated Solid
Cast Iron Yes Yes
ASTM D3034 or F789 (PVC) Yes Yes
ASTM F810 (HDPE) Yes No
ASTM D2662 (ABS) Yes Yes
ASTM D2751 (ABS) Yes No
**Use of a type of pipe other than listed above must be approved by
the inspecting engineer.
INSPECTIONS:
Typically there will be several inspections required during the installation of the
wastewater disposal system. These inspections will occur as follows:
1. A preconstruction site meeting.
2. An inspection must be conducted after the excavation of all native material for
the trench has been completed, but prior to placement of sewer rock.
3. An inspection must be conducted after the placement of the sewer rock, and
installation of distribution lines, cleanouts, and monitoring tubes, but prior to
placement of insulation, silt barrier,or backfill.
4. An inspection must be conducted after the tank has been set in place with
distribution piping and cleanouts installed,but prior to backfill.
5. The final inspection is to occur upon backfill and final grading of the property.
On-Site Wastewater Disposal System—Specifications,Lot 58,Section 5, Township 15N,Range I W,S.M.
August 6,2019
Page 4 of 4
The inspecting engineer is to be contacted at least 24 hours prior to the start of
construction. The engineer shall be notified ''A day prior to a required inspection.
"=.1qs4,14,57
w = 49th I�. i
--- •
0.» w .r
DI
s s scow T. "2 FS
v fi• ESSt4 •
e
VE1Consultants
Civil Engineering(Ind Surveying('oneculhuntc 1345 Rudakof Circle,Suite 201
.Serving;111 oj;Iluckn Anchorage,Alaska 99508
FAX: (907)338-5386
Phone:(907)337-3330
SOILS LOG - PERCOLATION TEST
PERFORMED FOR: Oliver and Venita Moore DATE PERFORMED: 6/26/19
LEGAL DESCRIPTION: Lot 58, Sec 5, T15N, R1W, S.M. TOWNSHIP, RANGE, SECTION: T15N, R1W, Sec 5
PERFORMED BY: Scott Roelfs, P.E.
TEST HOLE No. TH #1 SLOPE SITE PLAN
DEPTH T- -
(FEET) I I
0- - - a0�/ I I
_- Topsoil i
1-
+� . •
2- •• . I
' •. SP I I
3- ,, ••, fine sand,
• • some gravel i1`i'
4 • ••.� TH#1 TH#2
5- � I ® ®
6_ 4
.,:4.
7-' 'ti.,�� � TH#3
•
10- •• •,:., SM
t'+'ti',° TOTAL DEPTH OF TESTHOLE: 19.0
11-' :.,.� silty 0.5%• ...---\___
- ••R► sand GROUNDWATER ENCOUNTERED: ❑ ❑ -
12- •....,,
NO YES w 4�a
_.
DEPTH TO GROUNDWATER: a
13- • ' __J
• ' GROUNDWATER ENCOUNTERED: El
14- •' • (After Monitoring) NO YES .
+•�•'' DEPTH TO GROUNDWATER:
15- <r;�. MONITORING DATE: 7/29/19
16-.•x ., .
Date Reading Gross Time Net Time Depth to Water Net Drop
17-:" '1.:;:.:t, (min.) (inches) (inches)
18-;I'�.'s.;, 6/26/19 1 14:31 0
19-
..•;::
' 2 14:49 18 1/4 1/4
•
20- 3 15:04 15 9/16 5/16
•
4 15:19 15 13/16 1/4
..���\\\\111, 5 15:43 24 1 1/4 7/16
x\P�E OF q<,•3 r, .. 6 16:21 38 2 3/4
4.Mr`J.•... •''•' �. 7 16:47 26 2 3/8 3/8
a 49th '\ • * °O 8 17:30 43 3 3/16 13/16
/ �/ •r..../ 9 17:50 20 3 3/8 3/16
Or". Q-111
: SCOTT T. R FS : AM
0.� ;• C 24 •';;Z� PERCOLATION RATE 59.0 (minutes/inch) PERC HOLE DIAMETER 6"
J.:2,,.
� •. q o Ci 0 TEST RUN BETWEEN 6.0 FT AND 7-0 FT
#.<4'/)pROF SS��NP��•• COMMENTS: Pre—Soak 4hrs
111111111,111011).
PERFORMED BY VEI CONSULTANTS. I, SCOTT T. ROELFS , CERTIFY THAT THIS WAS P FORM IN
ACCORDANCE WITH ALL STATE AND MUNICIPAL GUIDELINES IN EFFECT ON THIS DATE: -7 Z6l7`1
t /// /
VE1Consultants
(711l Engineeriio,and Surveying('on.sultnnts 1345 Rudakof Circle,Suite 201
Serving.1l/ofAlaska Anchorage,Alaska 99508
FAX: (907)338-5386
1'hone:(907)337-3330
SOILS LOG - PERCOLATION TEST
PERFORMED FOR: Oliver and Venita Moore DATE PERFORMED: 6/26/19
LEGAL DESCRIPTION: Lot 58, Sec 5, T15N, R1W, S.M. TOWNSHIP, RANGE, SECTION: T15N, R1W, Sec 5
PERFORMED BY: Scott Roelfs, P.E.
TEST HOLE No. TH #2 SLOPE SITE PLAN
DEPTH F —
(FEET)
0- �O� I I
Topsoil i
1-
SW
• ••
2- ' •• • sand, I I
some gravel I I
3- •i'~ SP
4 • .•' fine sand,
• . some gravel r.5 I TH#1 TH#2
5 • ID ®
6- ▪ •
r7 � . . TH#3
8- .• L- - - - - - - - - _I
10- • • SP
• fine TOTAL DEPTH OF TESTHOLE: 18.0
11 0.5% ...--% ,
sand
GROUNDWATER ENCOUNTERED: ❑ ❑
12- •• • NO YES w 00
' DEPTH TO GROUNDWATER:
-j
13-
J
• • GROUNDWATER ENCOUNTERED: El to
• •
14- • • (After Monitorirg) NO YES
• DEPTH TO GROUNDWATER:
15 •;• • MONITORING DATE: 7/29/19
16- • •
• Date Reading Gross Time Net Time Depth to Water Net Drop
17- (min.) (inches) (inches)
18- 6/26/19 1 14:38 0
19- 2 14:52 14 1 1/2 1 1/2
20- 3 15:01 9 2 1/4 3/4
4 15:09 8 2 7/8 5/8
..��\SSII\,1,1 5 15:14 5 3 1/4 3/8
• OF q< 4
�•^^��• q� ♦. 6 15:23 9 3 7/8 5/8
J,• ••,'' •� .. 7 15:30 7 4 3/8 1/2
w o
;S 4•th ' ' '•• 0 8 15:40 10 5 5/8
• 0 9 15:50 10 5 1/2 1/2
• . •
•
SCOTT T. •e, LFS
�`' 13.1 6"
�.� CE 824 Z� PERCOLATION RATE (minutes/inch) PERC HOLE DIAMETER
.°>' _T Z� �g,.•��C�� TEST RUN BETWEEN 6.0 FT AND 7.0 FT
♦���P"OFESS��... 4. COMMENTS: Pre—Soak 4hrs
PERFORMED BY VEI CONSULTANTS. I, SCOTT T. ROELFS , CERTIFY THAT THIS WAS PERFORMED IN
ACCORDANCE WITH ALL STATE AND MUNICIPAL GUIDELINES IN EFFECT ON THIS DATE: -f . •.-7- 1, ,.--,-1!
VE1Consultants
Civil Engineering and Surveying(•un%ultmmns 1345 Rudakof Circle,Suite 201
Serving.411 of Alaska Anchorage,Alaska 99508
FAX: (907)338-5386
Phone:(907)337-3330
SOILS LOG — PERCOLATION TEST
PERFORMED FOR: Oliver and Venita Moore DATE PERFORMED: 6/26/19
LEGAL DESCRIPTION: Lot 58, Sec 5, T15N, R1W, S.M. TOWNSHIP, RANGE, SECTION: T15N, R1W, Sec 5
PERFORMED BY: Scott Roelfs, P.E.
TEST HOLE No. TH #3 SLOPE SITE PLAN
DEPTH I- - - - - - - —I
(FEET)
0- (1°
in
Topsoil
1-
• ••
2- • .Z....
•
3- ;...• SP 4^C
4 • ..• fine sand, co
•• , some gravel y I TH#1 TH#2
5 • • ® ®
6- • ••
•
`{ •• • Q7 TH#3
8-� '•
s ` - - - - �
10- • • SP
• fine sand TOTAL DEPTH OF TESTHOLE: 18.0
11- 0.5% is„.
• GROUNDWATER ENCOUNTERED: ® ❑
▪ • e
12- • •• NO YES w �4
• • DEPTH TO GROUNDWATER: a.
0
13- • • •
GROUNDWATER ENCOUNTERED: ® ❑
14- (After Monitoring) NO YES
• • DEPTH TO GROUNDWATER:
15 •
MONITORING DATE: 7/29/19
• + •.•
16-
• Date Reading Gross Time Net lime Depth to Water Net Drop
17- • (min.) (inches) (inches)
18- 6/26/19 1 14:45 0
19- 2 14:56 11 1/4 1/4
20- 3 15:11 15 7/8 5/8
4 15:25 14 1 1/4 3/8
'.10001%-11\i...4 5 16:19 54 3 1 3/4
"'�� Or �<.9 •it. 6 16:49 30 3 7/8 7/8
�1"J��•••••' • '••••� ... 7 17:25 36 4 3/4 7/8
• v.
AV :•• 49th i1 �O. 8 17:44 19 51/8 3/8
•i
MUNICIPALITY OF ANCHORAGE
And
Development Services Department t 4 Phone: 907-343-7904
On -Site Water & Wastewater Section Fax: 907-343-7997
Certificate of On -Site Systems Approval
Parcel I.D. 051-081-08-000
1. GENERAL INFORMATION
Expiration Date:
Complete legal description LT 58, T1 5N, R1 W, SEC 5
Location (site address) 21902 Knik Vista St.
Current property owner(s) Selway Corp DBA Hall Quality Homes Day phone 907-746-2757
Mailing address PO Box 1987, Palmer, AK 99645
Real estate agent
Day phone
g70
2. TYPE OF DWELLING:
rbv 7,7
❑ Single Family (w/wo ADU)
OV
❑ Duplex
a FEB o5 -,202.o n
F-1MultipleDwellings (Single Family and/or Duplex)
3
a.
3. NUMBER OF BEDROOMS:
3
<< 'IN CV
01 g 8 L95
4. TYPE OF WATER SUPPLY:
TYPE OF WASTEWATER DISPOSAL:
Private Well
0
Private Septic
El
Water Storage
❑
Holding Tank
❑
Community Well
❑
Community
❑
Public Water System
❑
Public Sewer
❑
Waiver request for:
Received by:
COSA to be released to the engineer, unless otherwise requested by the engineer.
Date:
COSA Fee $ '79A Waiver Fee $
Date of Payment Al(0( P -6Z Date of Payment
Receipt Number. 101ul+,s93 Receipt Number
COSA # QSC �z d 165� Waiver #
Distance:
5. STATEMENT OF INSPECTION BY ENGINEER
As certified by my seal affixed hereto and as of the validation date shown below, I verify that my investigation, based
on procedures outlined in the Certificate of On -Site Systems Approval Guidelines for this application, shows that the
on-site water supply and/or wastewater disposal system is (are) safe, functional and adequate for the number of
bedrooms and type of structure indicated herein. I further verify that based on the information obtained from the
Municipality of Anchorage files and from my investigation and inspection, the on-site water supply and/or wastewater
disposal system is (are) in compliance with all applicable Municipal and State codes, ordinances, and regulations in
effect at the time of installation. I acknowledge that On -Site staff may visit the site to verify the information submitted.
Name of Firm VEI Consultants Phone 907-337-3330
Address 1345 Rudakof Cir., Suite 201, Anchorage, AK 99508
Engineer's Printed Name Scott T. Roelfs
6. DSD/SIGNATURE
J System #1 Approved for 3 bedrooms
System #2 Approved for bedrooms
Disapproved
Date 1 /2`/.�`@,a:� y
S r7i . 4Gr
Conditional approval for bedrooms, with the following stipulations:
l�lllll({ltl((f���
ON-SITErri
14f ATER AND
m.-
WASTEV aTER
Jt� PROG!, AM
By:Cayu-coua o
y Original Certificate Date.: o� 0
The Municipality of Anchorage Development Services Division (DSD) issues Certificates of On -Site Systems Approval (COSA) based only upon the
representations given in paragraph 5 by an independent professional civil engineer registered in the State of Alaska. The Municipality of Anchorage is
not responsible for errors or omissions in the professional engineer's work.
7. ATTACHMENTS:
COSA Checklist X Nitrate Advisory
Septic System Advisory Arsenic Advisory
Well Flow Advisory Other
COSA Checklist blue sheet
Legal Description: LT 58, T15N, R1 W, SEC 5
If more than 1 septic system on lot: COSA Checklist # of
A. WELL DATA
❑ Well log is filed with Onsite (or attached)
Date drilled 9"9121119
Total depth 75 ft
Cased to 75 ft
❑ Sanitary seal is functioning correctly
❑ Wires are properly protected
Casing height (above ground) 24 in.
Date of flow test for COSA 9119/2019
Static water level at beginning of test 57 ft.
Comments
B. TANK DATA
Age of tank(s) New years
Tank type/material P"Y"
Measured operating fluid level in septic tank New
FOR Standpipes/foundation cleanout per record drawing
Date of pumping New
D. ABSORPTION FIELD DATA
Which system tested (date installed) 9/25/19
❑ ALL standpipes present per record drawing
Total measured depth from grade 15.5 ft (max)
Measured depth to pipe invert from grade 6.5 ft (min)
❑ N/A — pressurized field
Monitor tubes go to bottom of effective. If not, state
depth into effective
OR Code -required soil cover over field
❑ System presoaked
(Required if vacant for greater than 30 days prior to
date of test)
Gallons introduced gallons
Comments/Deficiencies: New
COSA Checklist yellow sheet
Parcel ID: 051-081-08-000
Structure served by this system
Well production at time of test 30 gpm
Water storage tank volume gallons
Well disinfected for coliform test? ❑ Yes ❑ No
❑ Coliform bacteria is Negative
Nitrate 3.96 mg/L ❑ Nitrate less than MRL (ND)
Arsenic ug/L ❑ Arsenic less than MRL (ND)
Collected by Erdman & Assoc
Date of Sample 1123/2020
C. LIFT STATION
❑ Required maintenance completed
Age of lift station years
Lift station material
Comments:
Adequacy test date New
Results ❑ Pass For bedrooms
Fluid depth prior to test in
Water added gal
New depth in
Elapsed time min
Final fluid depth in
Absorption rate gpd
Any rejuvenation treatment (past 12 months)
If yes, enter date
E. SEPARATION DISTANCES
From Private Well on Lot to: (Please enter distances if less than required or if community well)
Septic Tank/Lift Station on Lot > 100'
✓v
Yes
Community Sewer Manhole/Cleanout > 100'
r Yes
if No
ft
M Yes
if No ft
Neighboring Tank > 100'✓] Yes
if No
ft
Private Sewer/Septic Line > 25' M Yes
if No ft
Absorption Field on Lot > 100' ❑✓ Yes
if No
ft
Holding Tank > 100' M Yes
if No ft
Neighboring Absorption Fields > 100'
Yes
if No
Animal Containment > 50' ✓V Yes
if No ft
✓❑ Yes
if No
ft
if No
ft
F. ENGINEER'S COMMENTS
Manure/Animal Excreta Storage > 100'
Community Sewer Main > 75' E] Yes
if No
ft
r/ Yes
if No ft
From Septic/Holding Tank on Lot to: (Please enter distances if less than required)
Building Foundations > 10' 0 Yes if No ft Surface Water > 100' Yes if No ft
Property Line > 5'
✓v
Yes
if No
ft
Wells on Adjacent Lots:
Absorption Field > 5'
Q✓
Yes
if No
ft
Private Wells > 100' ❑✓ Yes if No
Water Main > 10'
Yes
if No
ft
Community Wells > 200' ✓v Yes if No.
Water Service Line > 10'
0✓
Yes
if No
ft
If septic tank is under driveway comment below
From Absorption Field on Lot to: (Please enter distances if less than required)
Building Foundation > 10'
Q✓
Yes
if No
ft
If absorption field is under driveway comment below
Property Line > 10'
❑✓
Yes
if No
ft
Wells on Adjacent Lots:
Water Main > 10'
Yes
if No
ft
Private Wells > 100' E✓ Yes if No
Water Service Line > 10'
0✓
Yes
if No
ft
Community Wells > 200' 0 Yes if No
Surface Water > 100'
✓�
Yes
if No
ft
F. ENGINEER'S COMMENTS
New Construction
%7�z _Z,
G. ENGINEER'S CERTIFICATION � � OF A r',41p
I certify that 1 have determined through field inspections and review '��
of Municipal records that the above systems are in conformance with N n ~ °. T�
MOA COSA guidelines in effect on this date. "I
w'
V� n7+�jT�oZ'G�
r,
COSA Checklist yellow sheet
ft
ft
ft
ft