Engineer's Soils Report
Bruin Terrace, Block 9, Lots 1 & 2
Proposed Subdivision of Bruin Park First Addition, Block 9, Tract A, Less NW Corner
512506
Municipality of Anchorage
Prepared for:
Hultquist Homes Inc.
12570 Old Seward Highway, Ste. 204
Anchorage, AK 99515
Prepared By:
Pannone Engineering Services, LLC
P.O.B. 100217
Anchorage, AK 99510
Submitted By:
Steven R. Pannone, P.E.
Principal, Civil Engineer
October 7, 2019
Bruin Terrace, Block 9, Lots 1 & 2
Proposed Subdivision of Bruin Park First Addition, Block 9, Tract A, Less NW Corner
Engineering Report
Project Description
This soils report is to identify the suitability of the soils on the lot being subdivided for
an on-site septic system. This subdivision is part of Bruin Park First Addition, Block 9, Tract A,
Less NW Corner. This report will detail the soils encountered during the soils investigation,
existing topography, impact to surrounding wells and septic system and the suitability of the
soils encountered for the use of an on-site wastewater disposal system and water supply
system. The two (2) proposed lots will be 1.13 and 1.01 acres in size respectively. The lots are
undeveloped, with the exception of an existing well. We were unable to locate a well log for
the subject well.
Soils Investigation
Pannone Engineering Services performed a soils investigation on July 12, 2019, in the area that
the subdivided lots will be located. The test pits were excavated by the White Raven
Development and were excavated to the maximum extent of the excavator. The test pits
revealed a variety of soils.
We encountered in Test Hole one (TH-1) a layer of organics to a depth of one point five feet
(1.5'), underlain with fine sand with silt to a depth of eighteen feet (18.0'). The layer of sand
and gravel was found to have a percolation rate of 45 minutes per inch. Based on the
percolation rate and the appearance of the soil an application rate of 0.45 gallons per day/
square foot may be used as an application rate with a trench type disposal field.
We did not encounter bedrock or impermeable soils in the Test Hole one (TH-1). Permafrost
was not encountered in the test pit nor is it suspected in this area. Groundwater was not
encountered to a depth of eighteen feet (18.0') during excavation or after the 7 -day monitoring
period or during October high groundwater.
We encountered in Test Hole two (TH-2) a layer of organics to a depth of one point five feet
(15), underlain with fine silty sand gravel to a depth of fourteen feet (14.0'). The layer of fine
silty sand and gravel was found to have a percolation rate of 18.0 minutes per inch. The SM
layer was underlain by a layer of SP (sand) from fourteen feet (14.0') to a depth of twenty-one
feet (21.0'). A sieve analysis was performed on the sand and it was found to have 96% passing
a #4 sieve and only 6% passing a #40 sieve. Based on the percolation rate and the appearance
Bruin Terrace, Block 9, Lots 1 & 2
Proposed Subdivision of Bruin Park First Addition, Block 9, Tract A, Less NW Corner
of the soil an application rate of 0.6 gallon per day/ square foot may be used as an application
rate.
We did not encounter bedrock or impermeable soils in the Test Hole Two (TH-2). Permafrost
was not encountered in the test pit nor is it suspected in this area. Groundwater was not
encountered to a depth of twenty-one feet (21.0') during excavation or after the 7 -day
monitoring period or during October high groundwater.
Topography
The proposed Subdivision is located on the lower portion of Rabbit Creek Road and is
surrounded by developed lots. The slope is generally from the northeast to the southwest. The
subject area slopes at approximately 5% with a slope of about 20%-25% just downhill of the lot
line and a slope of about 10% below. The area surrounding the test holes and the septic
reserve areas slopes at about 5%. There is an area on the southeast corner of Lot 2 within the
septic reserve area that is shown on the surveyors drawing to slope between 25% and 46%. In
the area of this slope the steep -slope provision in the 15.65 code should be used in the design
of the drain field. No slopes exceeding 46% exist within 100' of the proposed septic reserve
area.
Existing water and wastewater systems
The proposed subdivision is located in the triangle formed by the intersection of Forest Road
and Reader Road, in Anchorage. There is an existing well that was installed at an unknown
time. The current status of the well is unknown. The existing water supply systems on the
surrounding lots to the west, north, and east are private wells and have a 100 foot protective
radius around them (i.e. a new wastewater disposal system may not be located less than 100
feet from these private water wells.) The lots to the south are served by AWWU.
Water Availability
This subdivision will be located, on the lower Anchorage hillside where water is readily available.
The surrounding wells are typically between 100 and 250 feet deep. The static water levels
range between 55 and 75 feet deep. The existing well flow data that was available showed that
the wells with record data could produce approximately at least 5 gallons per minute.
Based on the record research and field data we collected, there appears to be adequate water
available for the proposed subdivision without affecting the surrounding wells. The well will be
approximately 200 feet deep or less and will likely produce at least 5 gallons a minute.
Installing these wells will not affect the production of water wells on the surrounding property.
Bruin Terrace, Block 9, Lots 1 & 2
Proposed Subdivision of Bruin Park First Addition, Block 9, Tract A, Less NW Corner
Legal Description
Well Depth
Static Water
Level
Production
Nitrates
Freeman, Lot 8
Unk (55+)
55
6.8+ gpm
0.5 (6/26/2001)
Freeman, Lot 4
236
75
5.8+ gpm
0.382
(3/13/2014)
Bruin Park First Addn, B9, Tr
A, NW Corner
113
56
5.4+ gpm
ND (5/6/2013)
Bruin Park, Block 4, Lot 13
99
72
10 gpm
ND (7/21/1987)
Bruin Park, Block 5, Lot 14
61+
61
5.7+ gpm
ND (3/12/2018)
Bruin Park, Block 4, Lot 14
Unk 67+
62
3.3+
ND (5/11/2007)
Bruin Park, Block 5, Lot 13
181
92
5.1
0.50 (8/17/2000)
Surface water
There are no wetlands or surface water within 100' of this subdivision.
Engineering Criteria
The soils in this area are typically organics underlain by silty sand and gravel. PES conducted a
percolation test on the proposed lots and found percolation rates as shown above, and on the
soils logs.
The soils encountered in this area are generally medium percolating soils (around 18-45 mpi).
An application rate of 0.45 gpd/sf should be used for the design of a wastewater disposal
system on the proposed lot 1 and an application rate of 0.60 gpd/sf should be used for the
design of a wastewater disposal system on the proposed lot 2 as shown on the soils logs and in
this report. Groundwater was not encountered on this subdivision.
Site Information
For a subdivision, a site plan stamped by an engineer must show specific areas for the septic
system based on the observed percolation rate and Title 15.65.180, Table 2. These areas must
meet all set.back requirements of Title 15.65. According to Table 2, and area of 10,000 sf must
be shown for areas with a percolation rate of 1-5 MPI, an area of 12,000 sf must be shown for
areas with a percolation rate of 5-12 MPI, and an area of 14,000 sf must be shown for areas
with a percolation rate of 12-24 MPI. The attached site plan shows the reserve areas per these
requirements.
Bruin Terrace, Block 9, Lots 1 & 2
Proposed Subdivision of Bruin Park First Addition, Block 9, Tract A, Less NW Corner
The Municipality of Anchorage (Moa) Regulations (15.65) govern for single-family homes. These
regulations require a minimum of four (4) feet vertical separation between the bottom of a soil
absorption system and ground water for a conventional wastewater disposal system, six feet
(6') to bedrock or other impermeable layers (tight silts and clays with a percolation rate greater
than 120 minutes per inch) and must be located greater than 100 feet horizontally from any
surface water (Creeks and ponds). Additionally, the accepting soils must have a percolation rate
of less than 120 minutes per inch. A lot must have room for a primary and reserve soil
absorption system.
-
-SF I
P A Rl A
WELL (P
0l
16
-OTS SERVED BY AINMU
14
NO WELL OR SEPTICS
-SEPTIC AREA
WELL
15
-7-
�R
4" ------
---
13
12
Uj
16,000 S F.
f
.0
<
LaJ.
RESERVE AREA
3
W L
13
. vi_l`l_.�.'. - -1.1
Li
WELL
14,000� S.F.
18
14
/- TIC A
WELL (E
IS
Vv-
-
-SF I
P A Rl A
WELL (P
0l
16
-OTS SERVED BY AINMU
NO WELL OR SEPTICS
WELL
15
-7-
LOT 2
Uj
16,000 S F.
.0
<
LaJ.
RESERVE AREA
3
. vi_l`l_.�.'. - -1.1
Li
14,000� S.F.
3;
RESERVE ARE <
TI -i --- 2
D
0 UTI_ FY EAC-t-Mn.N I
LOTS SERVED BY AWWU
NO WELL OR SEPTICS
r -A
Ww______w_-____w- w W_ ... . ........
MONA AVENUE
ss — ss $3 ss — ss — ss -- ss --o— ss ss ss ss ss ss
- - - - - - - - - - - - - - — - — - — - — - — - — -
NOTES:
PAMONE ENG SVC, LLC ........ 1) E/21 ,,'200 1
SOILS Fes' P.O. BOX 100217 ANCHORAGE, AK 99510 III
PHONE (907) 272-8218 FAX (907) 272-8211
:49TH
.... .. .. ....... iP.0� NO
2
BRUIN TERRACE, BLOCK 9, LOTS I & i
. . . . . ........ 1 01-6-112-18
---------- SUBDIVISION OF BRUIN PARK 1S1** ADDN, TR A e PERMIT NO.
HULTQUIST �IOIVIES M_-. CE 8149 S12506
FOREST DRIVE jSheet
PI -AN ANCHORAGEL-, AK
F
r.
RESERVE ARE <
TI -i --- 2
D
0 UTI_ FY EAC-t-Mn.N I
LOTS SERVED BY AWWU
NO WELL OR SEPTICS
r -A
Ww______w_-____w- w W_ ... . ........
MONA AVENUE
ss — ss $3 ss — ss — ss -- ss --o— ss ss ss ss ss ss
- - - - - - - - - - - - - - — - — - — - — - — - — -
NOTES:
PAMONE ENG SVC, LLC ........ 1) E/21 ,,'200 1
SOILS Fes' P.O. BOX 100217 ANCHORAGE, AK 99510 III
PHONE (907) 272-8218 FAX (907) 272-8211
:49TH
.... .. .. ....... iP.0� NO
2
BRUIN TERRACE, BLOCK 9, LOTS I & i
. . . . . ........ 1 01-6-112-18
---------- SUBDIVISION OF BRUIN PARK 1S1** ADDN, TR A e PERMIT NO.
HULTQUIST �IOIVIES M_-. CE 8149 S12506
FOREST DRIVE jSheet
PI -AN ANCHORAGEL-, AK
F
TEST HOLE 1
OR ORGANICS
1
2
3
4
5
6
7 FINE SILTY
SM SAND
8
9
10
11
12
13
14
15
16
17
18
BOH
DATE PERFORMED: 7/12/19
SOILS LOG - PERCOLATION TEST
SLOPE
X
TH
WAS GROUND WATER
ENCOUNTERED? N
IF YES, AT WHAT
DEPTH? -DRY
DEPTH TO WATER AFTER
MONITORING? -DRY
DATE: 7/19/19
DEPTH TO WATER AFTER
MONITORING? -DRY
DATE: 10/1/19
.SITE PLAN
1
\iy LOT 2
—2
TH —1 TH
SLOPE
TH
X
READING DATE
CLOCK
NETTIME
WATERTIME
LEVEL
READING
NETDROP
1 7/12/19
8:30
--
6.39
--
2
9:00
30 MIN
7.30
0.91
3
9:00
__
6.39
--
4
9:30
30 MIN
7.06
0.67
5
9:30
---
6.39
--
6
10:00
1 30 MIN
7.05
0.66
PEROLATION RATE 45_ (min/inch) PERC HOLE DIAMETER 6 inches
TEST RUN BETWEEN 3 FT AND 4 FT
COMMENTS: Test hole excavated by WHITE RAVEN DEVELOPMENT.
PERFORMED BY: Dan Moran. I CERTIFY THAT THIS TEST WAS PERFORMED IN ACCORDANCE WITH ALL STATE
AND MUNICIPAL GUIDLINES IN EFFECT ON THE DATE OF THIS TEST.
NOTES: 7- T � .�-o'�•a
SOILS REPORT PAMONE ENG SVC, LLC OF Q� ��� DO/7/2019
P.O. BOX 102954 ANCHORAGE, AK 99510 '�� ' ' ' ' ' 'qcS' �t
PHONE (907) 272-8218 FAX (907) 272-8211 �Gj�P 'Fy}� Scale
��•: ��� NTS
BRUIN TERRACE, BLOCK 9, LOTS 1 & 2 0 P.I.D. NO
SUBDIVISION OF BRUIN PARK 1ST ADDN, T "Ste'ven 'R: 'Pannone
HULTQUIST HOMES INC. ���CE 8149 PERMIT N0
S125�'
FOREST DRIVE � Vis."• •'•�"'�
SOILS LOG ANCHORAGE, AK ����/'ROFESSSN� �— sheet
�0�0 2 OF 3
TEST HOLE 2
1
2
3
4
5
ORGANICS
6
7 SM/ FINE SILTY
GM SAND WITH
8 SOME GRAVEL
9
10
11
12
13
14
15
16
17
SP SAND
18
19
20
21 ' '
BOH
DATE PERFORMED: 7/12/19
SOILS LOG - PERCOLATION TEST
St4�E PLAN
� � 3
3
R- I \
. ...LOT 1
\ LOT 2
TH-1 TH-2
SLOPE
WAS GROUND WATER
ENCOUNTERED? N
IF YES, AT WHAT
DEPTH?
-DRY
DEPTH TO WATER AFTER
MONITORING?
-DRY
DATE:
7/19/19
DEPTH TO WATER AFTER
MONITORING?
-DRY
DATE:
10/1/19
SLOPE
TH
X
READING DATE
CLOCK
NET TIME
WATERTIME
LEVEL
READING
NET DROP
1 7/12/19
11:45
---
6.65
---
2
12:15
30 MIN
8.25
1.60
3
12:15
--
6.65
---
a 1
12:45
1 30 MIN 1
8.31
1 1.66
512.45
—
6.65
--
6
1:15
MIN
30
8.28
1.63
PEROLATION RATE 18 (min/inch) PERC HOLE DIAMETER 6 inches
TEST RUN BETWEEN 3 FT AND 4 FT
COMMENTS: Test hole excavated bV WHITE RAVEN DEVELOPMENT.
PERFORMED BY: Dan Moran. I CERTIFY THAT THIS TEST WAS PERFORMED IN ACCORDANCE WITH ALL STATE
AND MUNICIPAL GUIDLINES IN EFFECT ON THE DATE OF THIS TEST.
NOTES: LLC
T � �•�`�
SOILS REPORT PANNONE ENG SVC, LLC ��>� Dote
P.O. BOX 102954 ANCHORAGE, AK 99510 'C� OF A�,Qs�,, 10/7/2019
PHONE (907) 272-8218 FAX (907) 272-8211 d�oj�p �y�� Scale
:+dO NTS
BRUIN TERRACE, BLOCK 9, LOTS 1 & 2 . . P.J.D.
ils .112°$
SUBDIVISION OF BRUIN PARK 1ST ADDN, TR S'tev'en •R. Pon none '
HULTQUIST HOMES INC. CE 8149 PERMIT NO.
FOREST DRIVE ���csjFp• �s'� Sheet506
SOILS LOG ANCHORAGE, AK �d F�PROFESSOO
3 OF 3
040.002
Client: Pannone Engineering Services
Project: Bruin Terrace Block 9 Lot 2
Date: ,luly 14; 2019
Crowther Associates
Particle Size Distribution Table
(percent passing sieve size)
Sample Source
Block 9
Lot 2
Sieve Size
Percent Finer
Percent Finer
Percent Finer
Percent Finer
3 inch
100
1-1/2 inch
100
3/4 inch
100
#4
96
#10
93
#40
6
#100
4
#200
3
0.02 mm
Classification
Sand (SP)