HomeMy WebLinkAboutUPLANDS PH 3 S12438Onsite File �,� W10A* July 27, 2020 Municipality of Anchorage Building Safety Division On Site Water and Wastewater Program 4700 Elmore Street Anchorage, AK 99507 Attention: Debbie Wockenfuss Subject: Uplands Subdivision, Phase 3 Lots 1 through 7 Dear Debbie: The owner of Tract 2, Uplands Subdivision intends to subdivide the tract into 7 lots and rename the subdivision Uplands Subdivision, Phase 3. The property in general is sloped to the southwest at grades ranging from 15% up to around 50%. Most of the area is in the 10-20% range, with a few portions steeper than 25%. There are also some areas where, for short distances, the slopes are greater than 46%. Lot sizes are all greater than 40,000 S.F. each. Surface drainage is primarily from north to south and toward the southwest at the west boundary. No standing water has been observed on the property and no drainage issues are present. Septic systems will not be affected by storm water runoff. Test holes were dug in late October of 2018. Two test holes were placed on each lot in areas that seemed appropriate for septic locations. Monitoring tubes were placed in the test holes and groundwater monitored over time. The test holes were completed to 16' in most areas. No bedrock or, impervious soil lenses were encountered. No groundwater was encountered in any of the test holes except on Lot 3 where groundwater was monitored at 6' below the surface. Soils were fairly uniform in the area, consisting mostly of silty, sandy gravel. Percolation benches were constructed between 4-6' below the ground surface in each test hole. The percolation cavity in each bench was prepared and presoaked in accordance with municipal requirements. Again, results were very uniform in the area, with almost all perk tests results falling under 20 min./in. Individual test results are included on the attached test hole logs. A study of the nitrate content in wells on the surrounding lots was completed. The results of this study are summarized below: LOT NAME DATE NITRATE CONTENT Preuss No. 1, Block 2, Lot 8 8/5/03 .1 mg/liter Preuss No. 1, Block 3, Lot 1 6/22/99 .729 mg/liter Preuss No. 2, Block 3, Lot 2 6/12/07 ND Preuss No. 2, Block 3, Lot 4 8/11/00 1.18 m /liter Preuss No. 2, Block 3, Lot 5 1/5/95 .l m /liter Preuss No. 2, Block 3, Lot 7 8/30/90 ND Preuss No. 4, Block 9, Lot 7 9/25/97 .1 mg/liter Preuss No. 4, Block 9, Lot 9 11/29/07 4.96 mg/liter Preuss No. 4, Block 9, Lot 10 5/16/00 1.34 mg/liter Septic system reserve areas were calculated for each lot based on percolation test data and Table 7 of the Municipal Code. Reserve areas range in size from 10,000 S.F. on two lots to 12,000 square feet on Lot 6. Slopes in excess of 46% are found within 100' of the boundaries of these reserve areas. These slopes flatten after a drop of only 10' to 16' in the case of Lots 6 and 7. The underlying soils on Lots 1, 6 and 7 are very absorbent withpercolation rates ranging from 1 to 5 minutes per inch. Septic effluent is expected to be absorbed vertically with very little horizontal migration. In addition, natural vegetation will be retained or erosion control measures taken, and the distribution pipe placed at a minimum of 3' below the existing ground surface. Sufficient surface area could not be found for reserve areas for Lots 2 through 5 due to the proximity of slopes greater than 46%. Individual septic absorption sites were designed on these lots that meet the separation distance requirements. Lots 3, 4 and 5 will require placement of Category III septic systems. Category III septic systems require a minimum of 35' separation from slopes greater than 25%. Lot 2 will have a conventional septic system designed to meet the steep slope criteria of the Municipal Code including vertical separation distances measured from the up -gradient side of the field, trenches 5' or narrower, natural vegetation retained or erosion control measures taken, and the distribution pipe placed sufficiently deep. Under these guidelines, these small sections of steeper slopes are appropriate for development of septic system. Slopes greater than 46% are found less than 100' from the edge of the absorption trenches.. but the slope drops for a minimum of 20' before flattening to a much shallower slope. The subsurface soils on Lot 2 are very absorbent with percolation rates of l to 5 minutes per inch. No horizontal migration of effluent is expected. The Site Plans, System Profiles and Design Test Hole for these lots are attached for your review. The absorption trench locations for Lots 2, 3, 4 and 5 will be placed on the final plat. A plat note will be required concerning the septic system locations. The recommended notes are as follows: 1. Category III Advanced Wastewater Treatment Systems approved by the Municipality of Anchorage is required on Lots 3,4 and 5. The maximum number of bedrooms for a house on Lots 2 and 3 is limited to four. No driveways, parking areas or structures may be placed over the absorption trench locations. 2. Alternate locations for wastewater disposal reserved areas may. be used if approved by the Municipality. In which case, the locations shown hereon shall move to the new locations and an amended plat shall be filed with the State Recorder's Office detailing the changes. Please review the attached information and advise if further information is required. Sincerely, Michael E. Anderson, P.E. Attachments �qC 49th •`•�� 'C.,�....,�.°s....., ............. I ..................... ......... MICHAEL E. ANDERSON ®�'•. No. CE -4381 �� TF •°••.,• 7/27/20 ,.••'`F}'�'® �� la ®,, ,m®SS\U\ ®®® ow �w� W Joy CD I-- o�ozui zo mzW Q��� ; 0 p LL - UJ Lu LUU LL LL co 0 ONO La o / co Lu W Lu �ry11(�,� I IIS=c 0- W 0 CL 1 �W 7�Cf) Of N W �2EQ CD o�= LOJ off LU CO ( Z CD f / I�IIII1111111��; ;\III Oa Lu ; 111\ z�0W W. I l ll I �U) Eu 00 I1I��oW0 Ir avi : U P LANDS, , TRACT 1, LOT 2 DESIGN FACTORS: SYSTEM REQUIREMENTS: 600 GPD PEAK FLOW 5' WIDE TRENCH SYSTEM PERK RATE: 1-5 MIN/IN 1,250 -GAL SEPTIC TANK APPLICATION RATE: 1.2 GPD/SF 600 GPD / 1.2 GPD/SF /5' WIDE *.5 RED. FACTOR = 50 LF TRENCH REQUIRED (50 LF SPECIFIED) BOTTOM OF TRENCH: 8' BELOW GRADE FLOW LINE ELEVATION: 4' BELOW GRADE TOP OF TRENCH:.5' ABOVE GRADE RATED PVC (HOLES DOWN) LD ROCK TYPICAL TRENCH SECTION (NO SCALE) NOTES: 1. GRADE AREA OVER TRENCH TO DRAIN AWAY 2. PROVIDE 3' OF COVER OVER TRENCHES AND 4' OVER SEPTIC TANK, OR 2' WITH 2" OF INSULATION 3. CHECK GROUNDWATER AT TIME OF CONSTRUCTION. IF LEVEL IS HIGHER THAN PREVIOUSLY OBSERVED, CALL ENGINEER IMMEDIATELY E N G I N E E R I N G LOT 5 a.r �C-4 IjL941 3 � 1�P-P�R-L-4� NAVE 1 10Q RAIILlls' I I , I I �- �T h16 -A— tn cu 3{0' LllG`�5' �E�' T / EiFEC`TIVE PTHC �B�RF�?1DN TRC�ICHES #3 %�j// i � � � r; %�� �• � � ® LOT: j --T-H#5-------------- '-�---- ---- — ------------------�- _ _ _ -------- ----- TRAGT'-1---- i ENGINEE 0.ING NOTE: MCI 0]~.. qCq 40® NO SLOPES >25% WITHIN 50' OR SURFACE WATER WITHIN 1 00'OF THE LEGEND °°•.°. "''••..`��® PROPOSED SEPTIC SYSTEM CO - CLEANOUT ALL WELLS ON SURROUNDING LOTS WITH IMPACTS TO THIS 2C0 -DOUBLE CLEANOUT .• 49th �• �„ ;;�,,,, PROPERTY ARE SHOWN. NO CONFLICTS WITH WELLS OR SEPTIC FCO - FOUNDATION CLEAN( •••<•••••>•••••••••� �•4`� o „ E. ANDERSON SYSTEMS. FS -FLOW SPLITTER VALVE MICHAEL .,� 0 50 100F MH -MANHOLE J�-•,1 No. CE 4381 .•^��_® EET ME SLOPES > 25% MT- MONITORING TUBE �� a®� ®®®® IM SLOPES > 46% SV - SEPTIC VENT m.FESS\ 1"=50' TH -TEST HOLE 1.5' 6" UPLANDS, TRACT 1, LOT 3 DESIGN FACTORS: SYSTEM REQUIREMENTS 600 GPD PEAK FLOW 5' WIDE TRENCH SYSTEM PERK RATE: 16-30 MIN/IN 1,500 -GAL FAP ADVANTEX TREATMENT TANK APPLICATION RATE: 3 GPD/SF w/AX-20 POD 600 GPD /3 GPD/SF /5' WIDE *.7 RED. FACTOR = 28 LF TRENCH REQUIRED (30 LF SPECIFIED) BOTTOM OF TRENCH: T BELOW GRADE FLOW LINE ELEVATION: 1' BELOW GRADE TOP OF TRENCH: 1.5' ABOVE GRADE TYPICAL TRENCH SECTION (NO SCALE) NOTES: 1. GRADE AREA OVER TRENCH TO DRAIN AWAY 2. PROVIDE T OF COVER OVER TRENCHES AND 4' OVER SEPTIC TANK, OR 2' WITH 2" OF INSULATION 3. CHECK GROUNDWATER AT TIME OF CONSTRUCTION. IF LEVEL IS HIGHER THAN PREVIOUSLY OBSERVED, CALL ENGINEER IMMEDIATELY HOLES DOWN) I I E N G I N E E R I N GI jiOx 4' EFFE IV SORPTION TREN S� TH8 LbT- 5 �► / ///� �i i �)�, L -O LAND LOT ;� eNGtNEFR1 NG// Y N' TE\ NO SURFACE WATER WITHIN 100' OF THE PROPOSED SEPTIC SYSTEM LEGEND ALL WELLS ON SURROUNDING LOTS WITH IMPACTS TO THIS CO - CLEANOUT PROPERTY ARE SHOWN. NO CONFLICTS WITH WELLS OR SEPTI 2CO - DOUBLE CLEANOUT SYSTEMS. �H#4 FCO -FOUNDATION CLEANOUT FS - FLOW SI TMER VALVE 0 50 100 MH - MANHOLE MM FEET MT - MONITORING TUBE SV - SEPTIC VENT 1"=50' TH - TEST HOLE DESIGN FACTORS: SYSTEM REQUIREMENTS 600 GPD PEAK FLOW 5' WIDE TRENCH SYSTEM PERK RATE: 4.1 MIN/IN 1,500 -GALLON FAP ADVANTEX TREATMENT APPLICATION RATE: 5 GPD/SF TANK w/AX20 POD 600 GPD /5 GPD/SF /5' WIDE *.5 = 12 LF TRENCH REQUIRED (15 LF SPECIFIED) BOTTOM OF TRENCH: 8' BELOW GRADE FLOW LINE ELEVATION: 4' BELOW GRADE TOP OF TRENCH: .5'ABOVE GRADE r- - RATED PVC (HOLES DOWN) TYPICAL TRENCH SECTION (NO SCALE) NOTES: 1. GRADE AREA OVER TRENCH TO DRAIN AWAY 2. PROVIDE 3' OF COVER OVER TRENCHES AND 4' OVER SEPTIC TANK, OR 2' WITH 2" OF INSULATION 3. CHECK GROUNDWATER AT TIME OF CONSTRUCTION. IF LEVEL IS HIGHER THAN PREVIOUSLY OBSERVED, CALL ENGINEER IMMEDIATELY E N G 1 NEE K I N G' • 1 . • � .AM \ �cB�4' EFF�E / / y - �j SORPTION TREN —� TH9 A Jr (� l\\���\ \�� O �� TH8 \ LOT 4 GE 11TI NO SURFACE WATER WITHIN 1 00'OF THE PROPOSED SEPTIC SYSTEM LEGEND ��P'�'���•••...••..•••���®� ALL WELLS ON SURROUNDING LOTS WITH IMPACTS TO THIS CO - CLEANOUT PROPERTY ARE SHOWN. NO CONFLICTS WITH WELLS OR SEPTI�H 2C0 -DOUBLE CLEANOUT 8 ••49th.. °•° •�• s SYSTEMS. FCO - FOUNDATION CLEANOUT a ....... ....... ... �•� FS - FLOW SFj HUER VALVE b MICHAEL E. ANDERSON MH - MANHOLE NO. CE -4381 _m 0 50 100 °•.,, 7127120 jr FEET MT -MONITORING TUBE Fp p••••••..•••••'''P�, ®® SV - SEPTIC VENT ®4°��® ESS\` ®®® 1"=50' TH - TEST HOLE DESIGN FACTORS: SYSTEM REQUIREMENTS: 600 GPD PEAK FLOW 5' WIDE TRENCH SYSTEM PERK RATE: 18-21 MIN/IN 1,500 -GALLON FAP ADVANTEX TREATMENT APPLICATION RATE: 4 GPD/SF TANK w/AX20 POD 600 GPD /4 GPD/SF /5' WIDE *.5 = 15 LF TRENCH REQUIRED (15 LF SPECIFIED) BOTTOM OF TRENCH: 8' BELOW GRADE FLOW LINE ELEVATION: 4' BELOW GRADE TOP OF TRENCH: .5'ABOVE GRADE RATED PVC (HOLES DOWN) LD ROCK TYPICAL TRENCH SECTION (NO SCALE) NOTES: 1. GRADE AREA OVER TRENCH TO DRAIN AWAY 2. PROVIDE 3' OF COVER OVER TRENCHES AND 4' OVER SEPTIC TANK, OR 2' WITH 2" OF INSULATION 3. CHECK GROUNDWATER AT TIME OF CONSTRUCTION. IF LEVEL IS HIGHER THAN PREVIOUSLY OBSERVED, CALL ENGINEER IMMEDIATELY E N G I N E E R I N G, i 4 SOILS LOG AND PERCOLATION TEST ENGINEERING LEGAL DESCRIPTION: UPLANDS LOT I PERFORMED FOR: THE BOUTET COMPANY INC. DATE: 10/24/18 PROJECT No.: PARCEL ID#: TECHNICIAN: J. MILLETTE J. WILLIAMS DEPTH TEST HOLE 1 (feel) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 • GM (SANDY SILTY GRAVEL) SLOPE SITE PLAN SEE SITE PLAN COMMENTS: DATE READING WAS GROUND WATER ENCOUNTERED? NO NET TIME (MINUTES) DEPTH To WATER (INCHES) NET DROP (INCHES) IF YES @ WHAT DEPTII? - L 1 3:42/3:48 DEPTH OF WATER AFTER MONITORING: NONE 0 6 2 DATE OF MONITORING: 11-6-18 P 5/11 6 3 E 6:11 COMMENTS: DATE READING GROSS TIME (MINUTES) NET TIME (MINUTES) DEPTH To WATER (INCHES) NET DROP (INCHES) 11/23/18 TEST HOLE PRESOAKED PRIOR TO TESTING: 1 3:42/3:48 6:10 5/11 6 2 3:53 / 3:59 6:08 5/11 6 3 4:00/4:06 6:11 5/11 6 4 4:07/4:13 6:07 5/11 6 5 4:14/4:20 6:10 5/11 6 6 4-.21/4:27 6:09 5/11 6 PERCOLATION RATE: 1.03 (MIN/INCH) PERC. HOLE DIA. 6 (INCHES) TEST RUN BETWEEN: 4 FT. and 5 FT. SOILS LOG AND PERCOLATION TEST *--GINEERING LEGAL DESCRIPTION: UPLANDS LOT I PERFORMED FOR: THE BOUTET COMPANY INC. DATE: 10/24/18 PROJECT No.: PARCEL ID#: TECHNICIAN: J. MILLETTE J. WILLIAMS DEPTH TEST HOLE 2 0,cet) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 SLOPE Y y' GM (SANDY SILTY GRAVEL) SITE PLAN SEE SITE PLAN COMMENTS: DATE READING WAS GROUND WATER ENCOUNTERED? NO NET TIME (MINUTES) DEPTH To WATER (INCHES) IF YES -8 WHAT DEPTH? - L 11/23/18 TEST HOLE PRESOAKED PRIOR TO TESTING: DEPTH OF WATER AFTER MONITORING: NONE 0 3:00 5 DATE OF MONITORING: 11-6-18 P COMMENTS: DATE READING GROSS TIME (MINUTES) NET TIME (MINUTES) DEPTH To WATER (INCHES) NET DROP (INCHES) 11/23/18 TEST HOLE PRESOAKED PRIOR TO TESTING: 1 3:00 5 2 3:30 30 7 2 3 3:31 5 1s 4 4:01 30 7-1 1 16 5 4:02 5 6 4:32 39 616 1 16 PERCOLATION RATE: 16 (MIN/INCH) PERC. HOLE DIA. 6 (INCHES)' TEST RUN BETWEEN: 4 FT. and 5 FT. DEPTH (feet) 1- 2 4 5 6 7 8 9 10- 11- 12- 13- 14- 15. 16- 17 18- 19. 20 SOILS LOG AND PERCOLATION TEST FNGIN FF RING LEGAL DESCRIPTION: UPLANDS TRACT I LOT 2 PERFORMED FOR: THE BOUTET COMPANY INC. DATE: 10/25/18 PROJECT No.: PARCEL ID#: PROPERTY ID TECHNICIAN: J. MILLETTE TEST HJ. WILLIAMS OLE 3 Rim SLOPE SITE PLAN SEE SITE PL,�N n 2 COMMENTS: DATE READING WAS GROUND WATER ENCOUNTERED? NO NET TIME (MINUTES) DEPTH TO WATER (INCHES) NET DROP (INCHES) IF YES @ WHAT DEPTH? - L 1 2:48/2:58 DEPTH OF WATER AFTER MONITORING: NONE 0 216- 2 DATE OF MONITORING: 11/4/18 P 616/816 216- 3 3:14/3:24 10 616/$16 216 COMMENTS: DATE READING GROSS TIME (MINUTES) NET TIME (MINUTES) DEPTH TO WATER (INCHES) NET DROP (INCHES) 11/23/18 TEST HOLE PRESOAKED PRIOR TO TESTING: 1 2:48/2:58 10 6 0/816 216- 2 3:02/3:12 10 616/816 216- 3 3:14/3:24 10 616/$16 216 4 3:25/3:35 10 616/$16 216 5 3:36/3:46 10 616/$16 216- 6 3:47/3:57 10 616/$16 216- PERCOLATION RATE: 4 (MIN/INCH) PERC. HOLE DIA. 6 (INCHES) TEST RUN BETWEEN: 4 FT. and 5 FT. DEPTH (f'cet) 1 - SOILS LOG AND PERCOLATION TEST E N G I N E E R I N G LEGAL DESCRIPTION: UPLANDS LOT 2 PERFORMED FOR: THE BOUTET COMPANY INC. DATE: 10/26/18 PROJECT No.: PARCEL ID#: TECHNICIAN: J. MILLETTE J. WILLIAMS TEST HOLE 4 • 4 5 6 7 GM (SANDY SILTY GRAVEL) O •` SITE PLAN SEE SITE PLAN 1 READING GROSS TIME (MINUTES) WAS GROUND WATER ENCOUNTERED? NO DEPTH To WATER (INCHES) NET DROP (INCHES) '""?` TEST HOLE PRESOAKED PRIOR TO TESTING: IF YES Ca, WHAT DEPTH? - L 2:56 / 3:03 1 1 6/12 6 DEPTH 01: WATER AFTER MONITORING: NONE 0 3:05/3:12 6:47 6/12 6 DATE OF MONITORING: I I-4-18 P 3:17/3:24 6:50 ..1 6 E 3:27/3:34 12 13 1 1 16 17 18 19 20 COMMENTS: DATE READING GROSS TIME (MINUTES) NET TIME (MINUTES) DEPTH To WATER (INCHES) NET DROP (INCHES) 11/23/18 TEST HOLE PRESOAKED PRIOR TO TESTING: 1 2:56 / 3:03 6:45 6/12 6 2 3:05/3:12 6:47 6/12 6 3 3:17/3:24 6:50 6/12 6 4 3:27/3:34 6:51 6/12 6 5 3:38 / 3:45 6:52 6/12 6 6 3:48/3:55 6:51 6/12 6 PERCOLATION RATE: 1.16 (MIN/INCH) PERC. HOLE DIA. 6 (INCHES) TEST RUN BETWEEN: 4 FT. and 5 FT. Dl --'P'1'1-1 (feet) 1 - 2 3 4 5 6 7 8 9 SOILS LOG AND PERCOLATION TEST *EN kEERI�NG LEGAL DESCRIPTION: UPLANDS LOT 3 PERFORMED FOR: THE BOUTET COMPANY INC. DATE: 10/25/18 PROJECT No.: PARCEL ID#: TECHNICIAN: J. MILLETTE J. WILLIAMS TEST HOLE 5 1 E's {Il 11 OB GM (SANDY SILTY GRAVEL) SLOPE SITE PLAN SEE SITE PLAN 1 O I GROSS TIME (MINUTES) WAS GROUND WATER ENCOUNTERED? YES NET DROP (INCHES) 11/23/18 TEST HOLE PRESOAKED PRIOR TO TESTING: IF YES v WHAT DEPTH? 10' L 4/816 1 1 2 DEPTH OF WATER AFTER MONITORING: 6' O 46 3 2:01 /2:11 DATE OF MONITORING: II -4-18 P 4 *) 10 4/86 46 E 5 12 13 14 15 16 17 18 19 20 COMMENTS: DATE READING GROSS TIME (MINUTES) NET TIME (MINUTES) DEPTH To WATER (INCHES) NET DROP (INCHES) 11/23/18 TEST HOLE PRESOAKED PRIOR TO TESTING: 1 1:37/1:47 10 4/816 416 2 1:50/2:00 10 4/816 46 3 2:01 /2:11 10 4/816 416 4 2:12/2:22 10 4/86 46 5 2:23/2:33 10 4/816 4 8 6 2:34/2:44 10 4/816 4T PERCOLATION RATE: 2.2 (MIN/INCH) PERC. HOLE DIA. 6 (INCHES) TEST RUN BETWEEN: 2 FT. and 3 FT. SOILS LOG AND PERCOLATION TEST E N G I N E E R I N G LEGAL DESCRIPTION: UPLANDS LOT 3 PERFORMED FOR: THE BOUTET COMPANY INC. DATE: 10/25/18 PROJECT No.: PARCELID#: TECHNICIAN: J. MILLETTE J. WILLIAMSDEPr,, TEST HOLE (feet) 1 kii?li�tlf{f 2 3 4 5 6 7 8 9 10 .. 11 �� 12 14 15 16 17 1 1 COMMENTS: •: GM (SANDY SILTY GRAVEL) SLOPE WAS GROUND WATER ENCOUNTERED? YES SITE PLAN SEE SITE PLAN IF YES C WHAT DEPTH? III READING GROSS TIME (MINUTES) DEPTH OF WATER AFTER MONITORING: 6' 0 NET DROP (INCHES) DATE Of MONITORING: I I -L -18 P 1 E DATE READING GROSS TIME (MINUTES) NET TIME (MINUTES) DEPTH To WATER (INCHES) NET DROP (INCHES) 11/23/18 TEST HOLE PRESOAKED PRIOR TO TESTING: 1 1:28 616 2 1:58 30 816 1 16 3 1:59 64 4 2:29 30 816 1 A 5 2:30 616 6 3:00 30 816 1 16 PERCOLATION RATE: 24 (MIN/INCH) PERC. HOLE DIA. 6 (INCHES) TEST RUN BETWEEN: 1.5 FT. and 2.5 FT. DEPTH (feet) 1 - 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 1 2 SOILS LOG AND PERCOLATION TEST E N G I N E E R I N G LEGAL DESCRIPTION: UPLANDS, TRACT I, LOT 4 PERFORMED FOR: THE BOUTET COMPANY DATE: 5/4/19 PROJECT No.: PARCELID#: PROPERTY ID TECHNICIAN: J. WILLIAMS TEST HOLE A SITE PLAN SEE SITE PLAN SILTY SANDY GRAVEL r GM COMMENTS: DATE READING WAS GROUND WATER ENCOUNTERED? NO DEPTH To WATER (INCHES) NET DROP (INCHES) IF YES v WHAT DEPTH? - ` 2:48/2:58 DEPTH OF WATER AFTER MONITORING: NONE 2-7/16 2 DATE OF MONITORING: ll//4/18 P 0/2-8/16 2-8/16 3 E 10 0/2-7/16 2-7/16 4 3:26/3:36 10 0/2-7/16 2-7/16 5 3:38/3:48 COMMENTS: DATE READING GROSS TIME (MINUTES) NET TIME (MINUTES) DEPTH To WATER (INCHES) NET DROP (INCHES) 3/4 TEST HOLE PRESOAKED PRIOR TO TESTING: 1 2:48/2:58 10 0/2-7/16 2-7/16 2 3:00/3:10 10 0/2-8/16 2-8/16 3 3:13/3:23 10 0/2-7/16 2-7/16 4 3:26/3:36 10 0/2-7/16 2-7/16 5 3:38/3:48 10 0/2-8/16 2-8/16 6 3:51/4:01 10 0/2-8/16 2-8/16 PERCOLATION RATE: 4.1 (MIN/INCH) PERC. HOLE DIA. 6 (INCHES) TEST RUN BETWEEN: 3 FT. and 4 FT. SOILS LOG AND PERCOLATION TEST ' E N G I N E E R I N G LEGAL DESCRIPTION: UPLANDS LOT 4 PERFORMED FOR: THE BOUTET COMPANY INC. DATE: 10/25/18 PROJECT No.: PARCELID#: TECHNICIAN: J. MILLETTE J. WILLIAMS DEPTH TEST HOLE 7 (Illeet) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 IiIIIIIINE., GM (SANDY SILTY GRAVEL) SLOPE SITE PLAN SEE SITE PLAN E4 COMMENTS: DATE READING WAS GROUND WATER ENCOUNTERED? NO NET TIME (MINUTES) DEPTH To WATER (INCHES) NET DROP (INCHES) IF YES Ca, WHAT DEPTH? - L 1 12:08 DEPTH OF WATER AFTER MONITORING: NONE 0 ; 2 DATE OF MONITORING: 1-4-18 P 7 16 2 16 3 E 516 COMMENTS: DATE READING GROSS TIME (MINUTES) NET TIME (MINUTES) DEPTH To WATER (INCHES) NET DROP (INCHES) 11/23/18 TEST HOLE PRESOAKED PRIOR TO TESTING: 1 12:08 516 2 12:38 30 7 16 2 16 3 12:40 516 4 1:10 30 78 2 5 1:11 5 4 6 1:41 30 717 2-1 PERCOLATION RATE: 13.7 (MIN/INCH) PERC. HOLE DIA. 6 (INCHES) TEST RUN BETWEEN: 4 FT. and 5 FT. DEPTH (feet) 1 - 2 J 4 5 6 7 8 9 1 14 15 1.6 17 18 19 20 SOILS LOG AND PERCOLATION TEST E N G I N E E R I N G LEGAL DESCRIPTION: UPLANDS LOT 5 PERFORMED FOR: THE BOUTET COMPANY INC. DATE: 10/2Z4/18 PROJECT No.: PARCEL ID#: TECHNICIAN: J. MILLETTE J. WILLIAMS TEST HOLE 8 x ' GM (SANDY SILTY GRAVEL) COMMENTS: Ilowill"m Q .I WAS GROUND WATER ENCOUNTERED? NO IF YES r WHAT DEPTH ? - DEPTH L DEPTH OF WATER AFTER MONITORING: NONE 0 DATE OF MONITORING: II -L-18 P n E SITE PLAN SEE SITE PLAN DATE READING GROSS TIME (MINUTES) NET TIME (MINUTES) DEPTH To WATER (INCHES) NET DROP (INCHES) 11/9/18 TEST HOLE PRESOAKED PRIOR TO TESTING: 1 12A5 516 6 2 1:15 30 7 6 3 1:16 56 6 4 1:46 30 616 6 5 1:47 56 6 6 2:17 30 615 6 PERCOLATION RATE: 21 (MIN/INCH) PERC. HOLE DIA. 6 (INCHES) TEST RUN BETWEEN: 4 FT. and 5 FT. SOILS LOG AND PERCOLATION TEST E N G I H E E R I H G LEGAL DESCRIPTION: UPLANDS LOT 5 PERFORMED FOR: THE BOUTET COMPANY INC. DATE: 10/24/ 18 PROJECT No.: PARCEL ID#: TECHNICIAN: J. MILLETTE J. WILLIAMS Dr__PTH TEST HOLE 9 ((eCl) 1 2 3 4 5 6 7 8 9 10 1.1 12 13 14 15 16 17 18 19 2 COMMENTS: r N 111301: GM (SANDY SILTY GRAVEL) SLOPE WAS GROUND WATER ENCOUNTERED? NO IF YES m WHAT DEPTH? - L DEPTH OF WATER AFTER MONITORING: NONE DATE OF MONITORING_ 11-4-I8 E SITE PLAN SEE SITE PLAN DATE READING GROSS TIME (MINUTES) NET TIME (MINUTES) DEPTH To WATER (INCHES) NET DROP (INCHES) 11/9/18 TEST HOLE PRESOAKED PRIOR TO TESTING: 1 1:18 51s 2 1:48 30 716 1 16 3 1:49 51s 4 2:19 30 716 1LO 16 5 2:20 51s 6 2:50 30 716 1 is PERCOLATION RATE: 18.4 (MIN/INCH) PERC. HOLE DIA. 6 (INCHES) TEST RUN BETWEEN: 4 FT. and 5 FT. DEPTH (feet) 1 2 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 `MUNICIPALITY OF ANCHORAGE DEVELOPMENT SERVICES DEPARTMENT 4700 ELMORE ROAD ANCHORAGE, AK 99519-6650 SOILS LOG AND PERCOLATION TEST LEGAL DESCRIPTION: UPLANDS S/D - LOT 6 PERFORMED FOR: THE BOUTET COMPANY DATE: 11/15/17 PROJECT No.: PARCELID#: TECHNICIAN: J. MILLETTE TEST HOLE 911 SAND SITE PLAN SEE SITE PLAN i U y; SANDY GRAVEL W/ SOME SILT HARD PAN @ 8.5' WAS GROUND WATER ENCOUNTERED? No IF YES n 'All -]AT DEPTH? - L DEPTH OF WATER AFTER MONITORING: NONE 0 DATE OF MONITORING: 11/22/17 P 10/31/19 E DATE READING GROSS TIME (MINUTES) NET TIME (MINUTES) DEPTH To WATER (INCHES) NET DROP (INCHES) II/14 TEST HOLE PRESOAKED PRIOR TO TESTING: 1 9:34 0 2 9:44 10 4%4 4%4 9 10:18 0 10 10:28 10 4 4 11 10:29 0 12 10:39 10 4 4 PERCOLATION RATE: 2.5 (MIN/INCH) PERC. HOLE DIA. 6 (INCHES) TEST RUN BETWEEN: 2 FT. and 3 FT. COMMENTS: PERK TEST WAS RUN 6 TIMES. INTERMEDIATE RESULTS ARE NOT SHOWN FOR CLARITY BUT WERE SIMILAR. DEPTH (feet) 1 - 2 - 4- 5- 6- 7- 8- 9- 10- 11- 12- 13- 14- 15- 16- 17- 18- 19- 20 - MUNICIPALITY OF ANCHORAGE DEVELOPMENT SERVICES DEPARTMENT 4 700 ELMORE ROAD ANCHORAGE, AK 99519-6650 SOILS LOG AND PERCOLATION TEST LEGAL DESCRIPTION: UPLANDS S/D - LOT 6 PERFORMED FOR: THE BOUTET COMPANY DATE: 11/13/17 PROJECT No.: PARCEL ID#: TECHNICIAN: J. MILLETTE TEST HOLE 92� •: COMMENTS: _ HARD PAN @ 8.5' SLOPE SITE PLAN SEE SITE PLAN v WAS GROUND WATER ENCOUNTERED'? No GROSS TIME (MINUTES) IF YES @ WHAT DEPTH'? - L II/14 DEPTH OF WATER AFTER MONITORING: NONE 0 5:45 DATE OF MONITORING: 11/22/17 P 2 10/31/19 E 5 3/8 DATE READING GROSS TIME (MINUTES) NET TIME (MINUTES) DEPTH To WATER (INCHES) NET DROP (INCHES) II/14 TEST HOLE PRESOAKED PRIOR TO TESTING: 1 5:45 0 2 6:15 30 5 3/8 5 % 3 6:16 0 4 6:46 30 5%4 5%4 5 6:47 0 6 7:17 30 5 %4 5 %4 PERCOLATION RATE: 5.7 (MIN/INCH) PERC. HOLE DIA. 6 (INCHES) TEST RUN BETWEEN: 2 FT. and 3 FT. SOILS LOG AND PERCOLATION TEST ENGINEER 1 N G ' LEGAL DESCRIPTION: UPLANDS LOT 7 PERFORMED FOR: THE BOUTET COMPANY INC. DATE: 10 / 24 / 18 PROJECT No.: PARCELID#: TECHNICIAN: J. MILLETTE J. WILLIAMS DEPT1-I TEST HOLE 10 re'et) 1' OB 3 4 1 5 a 6 % u:`�:, ��:GM (SANDY SILTY GRAVEL) 8 9 —I u 12 13 14 15 16 17 18 19 20 COMMENTS: SLOPE WAS GROUND WATER ENCOUNTERED? NO IF YES a WH DEPTH OF WATER AFTER MO z DATE OF MO SITE PLAN SEE SITE PLAN AT DEPTH? - L NITORING: NONE O NITORING: II -4-18 P E DATE READING GROSS TIME (MINUTES) NET TIME (MINUTES) DEPTH To WATER (INCHES) NET DROP (INCHES) 11/9/18 TEST HOLE PRESOAKED PRIOR TO TESTING: 1 11:05/11:15 10 6/1116 516 2 11:17/11:27 10 6/11 7 516 3 11:28/11:38 10 6/1116 516 4 11:39/11:49 10 6/11- 516 16 5 11:50/12:00 10 6/111- 516 6 12:01 /12:11 10 6/1116 5�s PERCOLATION RATE: 1.9 (MIN/INCH) FERC. HOLE DIA.—.6—(INCHES) TEST RUN BETWEEN: 4 FT. and 5 FT. SOILS LOG AND PERCOLATION TEST E N G I N E E R I N G LEGAL DESCRIPTION: UPLANDS LOT 7 PERFORMED FOR: THE BOUTET COMPANY INC. DATE: 10/24/18 PROJECT No.: PARCEL ID#: TECHNICIAN: J. MILLETTE J. WILLIAMS DEPTH TEST HOLE 1� ( feet) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 m GM (SANDY SILTY GRAVEL) n5 i a COMMENTS: SLOPE WAS GROUND WATER ENCOUNTERED? NO IF YES i{ WHAT DEPTH? - L DEPTH OF WATER AFTER MONITORING: NONE 0 DATE OF MONITORING: I 1-L -18 P E SITE PLAN SEE SITE PLAN DATE READING GROSS TIME (MINUTES) NET TIME (MINUTES) DEPTH To WATER (INCHES) NET DROP (INCHES) 11/23/18 TEST HOLE PRESOAKED PRIOR TO TESTING: 1 11:09/11:19 10 56 /11 516 2 11:20 /11:30 10 58 / 11 56 3 11:31/11:41 10 56 /1016 516 4 11:43/11:53 10 56 /1016 516 5 11:54/12:04 10 56 /1016 5-s 6 12:05/12:15 10 518 /1016 5 4 PERCOLATION RATE: 1.9 (MIN/INCH) FERC. HOLE DIA.—_.6__(INCHES) TEST RUN BETWEEN: 4 FT. and 5 FT. NOTE: ALL WELLS ON SURROUNDING LOTS WITH IMPACTS TO THIS PROPERTY ARE SHOWN. NO CONFLICTS WITH WELLS OR SEPTIC SYSTEMS. THIS SUBDIVISION IS SERVED BY PUBLIC WATER. LOTS 3A and 5 REQUIRE CATEGORY III SEPTIC SYSTEM. LOT 2 REQUIRES A CON VENTIONAL SEPTIC SYSTEM RESTRICTED TO A FOUR BEDROOM HOME. IFAFNn SEPTIC RESERVE AREAS »49th _rye -7y� : CONTOUR INTERVAL - 2' MICHAEL E. ANDERSON 1 �® 0 50 100 No. CE -4381® FEET 11 0 j27120 1 =�q 'm 11.50 1 THE CONntACTOR SHALL NOTIFY ALL AREA UTILITY COMPMAES PRIOR TO COMJ.tENCEMENT OF EXCAVATION. THE FOLLOWING IS A PARTIAL LIST: ALASKA DIG LINE - 811 LOCATE CALL CENTER OF ALASKA 278-3121 QNClU—ACS. AV . CEA, ENG, EUILER AVIATIONITESOR0, GCI CABLE, MLP. TRAFFIC SIGNALS. WA STORMSTREETS. AND ALASKA FIBER STAR.) STATE STORM/STREET LIGHTS 333-2411 MILITARY PETROLEUM LINES 862-4112 THE BOUTET CO I Forge Engineering 601 E 57th St #102 PO Box 240773 Anchorage, AK 99518 Anchorage, AK 99524 907-522-6776 907-522-7773