July 27, 2020
Municipality of Anchorage
Building Safety Division
On Site Water and Wastewater Program
4700 Elmore Street
Anchorage, AK 99507
Attention: Debbie Wockenfuss
Subject: Uplands Subdivision, Phase 3
Lots 1 through 7
Dear Debbie:
The owner of Tract 2, Uplands Subdivision intends to subdivide the tract into 7 lots and rename
the subdivision Uplands Subdivision, Phase 3. The property in general is sloped to the southwest
at grades ranging from 15% up to around 50%. Most of the area is in the 10-20% range, with a
few portions steeper than 25%. There are also some areas where, for short distances, the slopes are
greater than 46%. Lot sizes are all greater than 40,000 S.F. each. Surface drainage is primarily
from north to south and toward the southwest at the west boundary. No standing water has been
observed on the property and no drainage issues are present. Septic systems will not be affected
by storm water runoff.
Test holes were dug in late October of 2018. Two test holes were placed on each lot in areas that
seemed appropriate for septic locations. Monitoring tubes were placed in the test holes and
groundwater monitored over time. The test holes were completed to 16' in most areas. No bedrock
or, impervious soil lenses were encountered. No groundwater was encountered in any of the test
holes except on Lot 3 where groundwater was monitored at 6' below the surface. Soils were fairly
uniform in the area, consisting mostly of silty, sandy gravel. Percolation benches were constructed
between 4-6' below the ground surface in each test hole. The percolation cavity in each bench was
prepared and presoaked in accordance with municipal requirements. Again, results were very
uniform in the area, with almost all perk tests results falling under 20 min./in. Individual test results
are included on the attached test hole logs.
A study of the nitrate content in wells on the surrounding lots was completed. The results of this
study are summarized below:
LOT NAME
DATE
NITRATE CONTENT
Preuss No. 1, Block 2, Lot 8
8/5/03
.1 mg/liter
Preuss No. 1, Block 3, Lot 1
6/22/99
.729 mg/liter
Preuss No. 2, Block 3, Lot 2
6/12/07
ND
Preuss No. 2, Block 3, Lot 4
8/11/00
1.18 m /liter
Preuss No. 2, Block 3, Lot 5
1/5/95
.l m /liter
Preuss No. 2, Block 3, Lot 7
8/30/90
ND
Preuss No. 4, Block 9, Lot 7
9/25/97
.1 mg/liter
Preuss No. 4, Block 9, Lot 9
11/29/07
4.96 mg/liter
Preuss No. 4, Block 9, Lot 10
5/16/00
1.34 mg/liter
Septic system reserve areas were calculated for each lot based on percolation test data and Table
7 of the Municipal Code. Reserve areas range in size from 10,000 S.F. on two lots to 12,000
square feet on Lot 6. Slopes in excess of 46% are found within 100' of the boundaries of these
reserve areas. These slopes flatten after a drop of only 10' to 16' in the case of Lots 6 and 7. The
underlying soils on Lots 1, 6 and 7 are very absorbent withpercolation rates ranging from 1 to 5
minutes per inch. Septic effluent is expected to be absorbed vertically with very little horizontal
migration. In addition, natural vegetation will be retained or erosion control measures taken, and
the distribution pipe placed at a minimum of 3' below the existing ground surface.
Sufficient surface area could not be found for reserve areas for Lots 2 through 5 due to the
proximity of slopes greater than 46%. Individual septic absorption sites were designed on these
lots that meet the separation distance requirements. Lots 3, 4 and 5 will require placement of
Category III septic systems. Category III septic systems require a minimum of 35' separation
from slopes greater than 25%. Lot 2 will have a conventional septic system designed to meet the
steep slope criteria of the Municipal Code including vertical separation distances measured from
the up -gradient side of the field, trenches 5' or narrower, natural vegetation retained or erosion
control measures taken, and the distribution pipe placed sufficiently deep. Under these guidelines,
these small sections of steeper slopes are appropriate for development of septic system.
Slopes greater than 46% are found less than 100' from the edge of the absorption trenches.. but the
slope drops for a minimum of 20' before flattening to a much shallower slope. The subsurface
soils on Lot 2 are very absorbent with percolation rates of l to 5 minutes per inch. No horizontal
migration of effluent is expected. The Site Plans, System Profiles and Design Test Hole for these
lots are attached for your review.
The absorption trench locations for Lots 2, 3, 4 and 5 will be placed on the final plat. A plat note
will be required concerning the septic system locations. The recommended notes are as follows:
1. Category III Advanced Wastewater Treatment Systems approved by the Municipality of
Anchorage is required on Lots 3,4 and 5. The maximum number of bedrooms for a house
on Lots 2 and 3 is limited to four. No driveways, parking areas or structures may be
placed over the absorption trench locations.
2. Alternate locations for wastewater disposal reserved areas may. be used if approved by
the Municipality. In which case, the locations shown hereon shall move to the new
locations and an amended plat shall be filed with the State Recorder's Office detailing the
changes.
Please review the attached information and advise if further information is required.
Sincerely,
Michael E. Anderson, P.E.
Attachments
�qC
49th •`•��
'C.,�....,�.°s.....,
............. I ..................... .........
MICHAEL E. ANDERSON
®�'•. No. CE -4381
�� TF •°••.,• 7/27/20 ,.••'`F}'�'®
�� la
®,,
,m®SS\U\ ®®®
ow
�w� W
Joy CD I--
o�ozui
zo
mzW
Q���
; 0 p
LL -
UJ
Lu LUU
LL
LL
co 0
ONO
La
o / co
Lu
W Lu
�ry11(�,� I IIS=c 0- W
0 CL
1 �W
7�Cf) Of
N
W
�2EQ
CD
o�=
LOJ off
LU CO
( Z CD
f / I�IIII1111111��; ;\III Oa
Lu
; 111\ z�0W W.
I l ll I �U)
Eu
00
I1I��oW0
Ir
avi
:
U P LANDS, , TRACT 1, LOT 2
DESIGN FACTORS: SYSTEM REQUIREMENTS:
600 GPD PEAK FLOW 5' WIDE TRENCH SYSTEM
PERK RATE: 1-5 MIN/IN 1,250 -GAL SEPTIC TANK
APPLICATION RATE: 1.2 GPD/SF
600 GPD / 1.2 GPD/SF /5' WIDE *.5 RED. FACTOR = 50 LF TRENCH REQUIRED (50 LF SPECIFIED)
BOTTOM OF TRENCH: 8' BELOW GRADE
FLOW LINE ELEVATION: 4' BELOW GRADE
TOP OF TRENCH:.5' ABOVE GRADE
RATED PVC (HOLES DOWN)
LD ROCK
TYPICAL TRENCH SECTION
(NO SCALE)
NOTES:
1. GRADE AREA OVER TRENCH TO DRAIN AWAY
2. PROVIDE 3' OF COVER OVER TRENCHES AND 4' OVER SEPTIC TANK, OR 2'
WITH 2" OF INSULATION
3. CHECK GROUNDWATER AT TIME OF CONSTRUCTION. IF LEVEL IS HIGHER
THAN PREVIOUSLY OBSERVED, CALL ENGINEER IMMEDIATELY
E N G I N E E R I N G
LOT 5
a.r
�C-4 IjL941 3 � 1�P-P�R-L-4� NAVE
1 10Q RAIILlls' I I , I I �- �T h16 -A—
tn
cu
3{0' LllG`�5' �E�' T /
EiFEC`TIVE PTHC
�B�RF�?1DN TRC�ICHES #3
%�j// i � � � r; %�� �• � � ® LOT: j
--T-H#5-------------- '-�---- ---- —
------------------�- _ _ _
--------
----- TRAGT'-1----
i
ENGINEE 0.ING NOTE:
MCI
0]~.. qCq 40®
NO SLOPES >25% WITHIN 50' OR SURFACE WATER WITHIN 1 00'OF THE
LEGEND
°°•.°.
"''••..`��®
PROPOSED SEPTIC SYSTEM
CO - CLEANOUT
ALL WELLS ON SURROUNDING LOTS WITH IMPACTS TO THIS
2C0 -DOUBLE CLEANOUT
.• 49th �• �„ ;;�,,,,
PROPERTY ARE SHOWN. NO CONFLICTS WITH WELLS OR SEPTIC
FCO - FOUNDATION CLEAN(
•••<•••••>•••••••••� �•4`�
o „ E. ANDERSON
SYSTEMS.
FS -FLOW SPLITTER VALVE
MICHAEL .,�
0 50 100F
MH -MANHOLE
J�-•,1 No. CE 4381 .•^��_®
EET ME SLOPES > 25%
MT- MONITORING TUBE
�� a®� ®®®®
IM SLOPES > 46%
SV - SEPTIC VENT
m.FESS\
1"=50'
TH -TEST HOLE
1.5'
6"
UPLANDS, TRACT 1, LOT 3
DESIGN FACTORS: SYSTEM REQUIREMENTS
600 GPD PEAK FLOW 5' WIDE TRENCH SYSTEM
PERK RATE: 16-30 MIN/IN 1,500 -GAL FAP ADVANTEX TREATMENT TANK
APPLICATION RATE: 3 GPD/SF w/AX-20 POD
600 GPD /3 GPD/SF /5' WIDE *.7 RED. FACTOR = 28 LF TRENCH REQUIRED (30 LF SPECIFIED)
BOTTOM OF TRENCH: T BELOW GRADE
FLOW LINE ELEVATION: 1' BELOW GRADE
TOP OF TRENCH: 1.5' ABOVE GRADE
TYPICAL TRENCH SECTION
(NO SCALE)
NOTES:
1. GRADE AREA OVER TRENCH TO DRAIN AWAY
2. PROVIDE T OF COVER OVER TRENCHES AND 4' OVER SEPTIC TANK, OR 2'
WITH 2" OF INSULATION
3. CHECK GROUNDWATER AT TIME OF CONSTRUCTION. IF LEVEL IS HIGHER
THAN PREVIOUSLY OBSERVED, CALL ENGINEER IMMEDIATELY
HOLES DOWN)
I
I
E N G I N E E R I N GI
jiOx 4' EFFE IV
SORPTION TREN S�
TH8
LbT- 5
�► / ///� �i i �)�, L -O LAND
LOT
;�
eNGtNEFR1 NG// Y N' TE\
NO SURFACE WATER WITHIN 100' OF THE PROPOSED SEPTIC SYSTEM LEGEND
ALL WELLS ON SURROUNDING LOTS WITH IMPACTS TO THIS CO - CLEANOUT
PROPERTY ARE SHOWN. NO CONFLICTS WITH WELLS OR SEPTI 2CO - DOUBLE CLEANOUT
SYSTEMS. �H#4 FCO -FOUNDATION CLEANOUT
FS - FLOW SI TMER VALVE
0 50 100 MH - MANHOLE
MM FEET MT - MONITORING TUBE
SV - SEPTIC VENT
1"=50' TH - TEST HOLE
DESIGN FACTORS: SYSTEM REQUIREMENTS
600 GPD PEAK FLOW 5' WIDE TRENCH SYSTEM
PERK RATE: 4.1 MIN/IN 1,500 -GALLON FAP ADVANTEX TREATMENT
APPLICATION RATE: 5 GPD/SF TANK w/AX20 POD
600 GPD /5 GPD/SF /5' WIDE *.5 = 12 LF TRENCH REQUIRED (15 LF SPECIFIED)
BOTTOM OF TRENCH: 8' BELOW GRADE
FLOW LINE ELEVATION: 4' BELOW GRADE
TOP OF TRENCH: .5'ABOVE GRADE
r- -
RATED PVC (HOLES DOWN)
TYPICAL TRENCH SECTION
(NO SCALE)
NOTES:
1. GRADE AREA OVER TRENCH TO DRAIN AWAY
2. PROVIDE 3' OF COVER OVER TRENCHES AND 4' OVER SEPTIC TANK, OR 2'
WITH 2" OF INSULATION
3. CHECK GROUNDWATER AT TIME OF CONSTRUCTION. IF LEVEL IS HIGHER
THAN PREVIOUSLY OBSERVED, CALL ENGINEER IMMEDIATELY
E N G 1 NEE K I N G'
• 1 . • � .AM
\
�cB�4' EFF�E
/ / y - �j SORPTION TREN —� TH9
A Jr
(� l\\���\ \�� O �� TH8 \
LOT 4
GE
11TI
NO SURFACE WATER WITHIN 1 00'OF THE PROPOSED SEPTIC SYSTEM LEGEND
��P'�'���•••...••..•••���®� ALL WELLS ON SURROUNDING LOTS WITH IMPACTS TO THIS CO - CLEANOUT
PROPERTY ARE SHOWN. NO CONFLICTS WITH WELLS OR SEPTI�H 2C0 -DOUBLE CLEANOUT
8 ••49th.. °•° •�• s SYSTEMS. FCO - FOUNDATION CLEANOUT
a ....... ....... ...
�•� FS - FLOW SFj HUER VALVE
b MICHAEL E. ANDERSON MH - MANHOLE
NO. CE -4381 _m 0 50 100
°•.,, 7127120 jr FEET MT -MONITORING TUBE
Fp p••••••..•••••'''P�, ®® SV - SEPTIC VENT
®4°��® ESS\` ®®® 1"=50' TH - TEST HOLE
DESIGN FACTORS: SYSTEM REQUIREMENTS:
600 GPD PEAK FLOW 5' WIDE TRENCH SYSTEM
PERK RATE: 18-21 MIN/IN 1,500 -GALLON FAP ADVANTEX TREATMENT
APPLICATION RATE: 4 GPD/SF TANK w/AX20 POD
600 GPD /4 GPD/SF /5' WIDE *.5 = 15 LF TRENCH REQUIRED (15 LF SPECIFIED)
BOTTOM OF TRENCH: 8' BELOW GRADE
FLOW LINE ELEVATION: 4' BELOW GRADE
TOP OF TRENCH: .5'ABOVE GRADE
RATED PVC (HOLES DOWN)
LD ROCK
TYPICAL TRENCH SECTION
(NO SCALE)
NOTES:
1. GRADE AREA OVER TRENCH TO DRAIN AWAY
2. PROVIDE 3' OF COVER OVER TRENCHES AND 4' OVER SEPTIC TANK, OR 2'
WITH 2" OF INSULATION
3. CHECK GROUNDWATER AT TIME OF CONSTRUCTION. IF LEVEL IS HIGHER
THAN PREVIOUSLY OBSERVED, CALL ENGINEER IMMEDIATELY
E N G I N E E R I N G,
i
4 SOILS LOG AND PERCOLATION TEST
ENGINEERING
LEGAL DESCRIPTION: UPLANDS LOT I
PERFORMED FOR: THE BOUTET COMPANY INC.
DATE: 10/24/18 PROJECT No.:
PARCEL ID#: TECHNICIAN: J. MILLETTE
J. WILLIAMS
DEPTH TEST HOLE 1
(feel)
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
•
GM (SANDY SILTY GRAVEL)
SLOPE
SITE PLAN
SEE SITE PLAN
COMMENTS:
DATE
READING
WAS GROUND WATER ENCOUNTERED? NO
NET TIME
(MINUTES)
DEPTH To
WATER
(INCHES)
NET DROP
(INCHES)
IF YES @ WHAT DEPTII? -
L
1
3:42/3:48
DEPTH OF WATER AFTER MONITORING: NONE
0
6
2
DATE OF MONITORING: 11-6-18
P
5/11
6
3
E
6:11
COMMENTS:
DATE
READING
GROSS TIME
(MINUTES)
NET TIME
(MINUTES)
DEPTH To
WATER
(INCHES)
NET DROP
(INCHES)
11/23/18
TEST HOLE PRESOAKED PRIOR TO TESTING:
1
3:42/3:48
6:10
5/11
6
2
3:53 / 3:59
6:08
5/11
6
3
4:00/4:06
6:11
5/11
6
4
4:07/4:13
6:07
5/11
6
5
4:14/4:20
6:10
5/11
6
6
4-.21/4:27
6:09
5/11
6
PERCOLATION RATE: 1.03 (MIN/INCH) PERC. HOLE DIA. 6 (INCHES)
TEST RUN BETWEEN: 4 FT. and 5 FT.
SOILS LOG AND PERCOLATION TEST
*--GINEERING
LEGAL DESCRIPTION: UPLANDS LOT I
PERFORMED FOR: THE BOUTET COMPANY INC.
DATE: 10/24/18 PROJECT No.:
PARCEL ID#: TECHNICIAN: J. MILLETTE
J. WILLIAMS
DEPTH TEST HOLE 2
0,cet)
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
SLOPE
Y
y' GM (SANDY SILTY GRAVEL)
SITE PLAN
SEE SITE PLAN
COMMENTS:
DATE
READING
WAS GROUND WATER ENCOUNTERED? NO
NET TIME
(MINUTES)
DEPTH To
WATER
(INCHES)
IF YES -8 WHAT DEPTH? - L
11/23/18
TEST HOLE PRESOAKED PRIOR TO TESTING:
DEPTH OF WATER AFTER MONITORING: NONE 0
3:00
5
DATE OF MONITORING: 11-6-18 P
COMMENTS:
DATE
READING
GROSS TIME
(MINUTES)
NET TIME
(MINUTES)
DEPTH To
WATER
(INCHES)
NET DROP
(INCHES)
11/23/18
TEST HOLE PRESOAKED PRIOR TO TESTING:
1
3:00
5
2
3:30
30
7
2
3
3:31
5 1s
4
4:01
30
7-1
1 16
5
4:02
5
6
4:32
39
616
1 16
PERCOLATION RATE: 16 (MIN/INCH) PERC. HOLE DIA. 6 (INCHES)'
TEST RUN BETWEEN: 4 FT. and 5 FT.
DEPTH
(feet)
1-
2
4
5
6
7
8
9
10-
11-
12-
13-
14-
15.
16-
17
18-
19.
20
SOILS LOG AND PERCOLATION TEST
FNGIN FF RING
LEGAL DESCRIPTION: UPLANDS TRACT I LOT 2
PERFORMED FOR: THE BOUTET COMPANY INC.
DATE: 10/25/18 PROJECT No.:
PARCEL ID#: PROPERTY ID TECHNICIAN: J. MILLETTE
TEST HJ. WILLIAMS
OLE 3
Rim
SLOPE
SITE PLAN
SEE SITE PL,�N n
2
COMMENTS:
DATE
READING
WAS GROUND WATER ENCOUNTERED? NO
NET TIME
(MINUTES)
DEPTH TO
WATER
(INCHES)
NET DROP
(INCHES)
IF YES @ WHAT DEPTH? -
L
1
2:48/2:58
DEPTH OF WATER AFTER MONITORING: NONE
0
216-
2
DATE OF MONITORING: 11/4/18
P
616/816
216-
3
3:14/3:24
10
616/$16
216
COMMENTS:
DATE
READING
GROSS TIME
(MINUTES)
NET TIME
(MINUTES)
DEPTH TO
WATER
(INCHES)
NET DROP
(INCHES)
11/23/18
TEST HOLE PRESOAKED PRIOR TO TESTING:
1
2:48/2:58
10
6 0/816
216-
2
3:02/3:12
10
616/816
216-
3
3:14/3:24
10
616/$16
216
4
3:25/3:35
10
616/$16
216
5
3:36/3:46
10
616/$16
216-
6
3:47/3:57
10
616/$16
216-
PERCOLATION RATE: 4 (MIN/INCH) PERC. HOLE DIA. 6 (INCHES)
TEST RUN BETWEEN: 4 FT. and 5 FT.
DEPTH
(f'cet)
1 -
SOILS LOG AND PERCOLATION TEST
E N G I N E E R I N G
LEGAL DESCRIPTION: UPLANDS LOT 2
PERFORMED FOR: THE BOUTET COMPANY INC.
DATE: 10/26/18 PROJECT No.:
PARCEL ID#: TECHNICIAN: J. MILLETTE
J. WILLIAMS
TEST HOLE 4
•
4
5
6
7 GM (SANDY SILTY GRAVEL)
O •`
SITE PLAN
SEE SITE PLAN
1
READING
GROSS TIME
(MINUTES)
WAS GROUND WATER ENCOUNTERED? NO
DEPTH To
WATER
(INCHES)
NET DROP
(INCHES)
'""?`
TEST HOLE PRESOAKED PRIOR TO TESTING:
IF YES Ca, WHAT DEPTH? -
L
2:56 / 3:03
1 1
6/12
6
DEPTH 01: WATER AFTER MONITORING: NONE
0
3:05/3:12
6:47
6/12
6
DATE OF MONITORING: I I-4-18
P
3:17/3:24
6:50
..1
6
E
3:27/3:34
12
13
1
1
16
17
18
19
20
COMMENTS:
DATE
READING
GROSS TIME
(MINUTES)
NET TIME
(MINUTES)
DEPTH To
WATER
(INCHES)
NET DROP
(INCHES)
11/23/18
TEST HOLE PRESOAKED PRIOR TO TESTING:
1
2:56 / 3:03
6:45
6/12
6
2
3:05/3:12
6:47
6/12
6
3
3:17/3:24
6:50
6/12
6
4
3:27/3:34
6:51
6/12
6
5
3:38 / 3:45
6:52
6/12
6
6
3:48/3:55
6:51
6/12
6
PERCOLATION RATE: 1.16 (MIN/INCH) PERC. HOLE DIA. 6 (INCHES)
TEST RUN BETWEEN: 4 FT. and 5 FT.
Dl --'P'1'1-1
(feet)
1 -
2
3
4
5
6
7
8
9
SOILS LOG AND PERCOLATION TEST
*EN kEERI�NG
LEGAL DESCRIPTION: UPLANDS LOT 3
PERFORMED FOR: THE BOUTET COMPANY INC.
DATE: 10/25/18 PROJECT No.:
PARCEL ID#: TECHNICIAN: J. MILLETTE
J. WILLIAMS
TEST HOLE 5 1
E's {Il 11 OB
GM (SANDY SILTY GRAVEL)
SLOPE
SITE PLAN
SEE SITE PLAN
1 O
I
GROSS TIME
(MINUTES)
WAS GROUND WATER ENCOUNTERED?
YES
NET DROP
(INCHES)
11/23/18
TEST HOLE PRESOAKED PRIOR TO TESTING:
IF YES v WHAT DEPTH?
10'
L
4/816
1 1
2
DEPTH OF WATER AFTER MONITORING:
6'
O
46
3
2:01 /2:11
DATE OF MONITORING:
II -4-18
P
4
*)
10
4/86
46
E
5
12
13
14
15
16
17
18
19
20
COMMENTS:
DATE
READING
GROSS TIME
(MINUTES)
NET TIME
(MINUTES)
DEPTH To
WATER
(INCHES)
NET DROP
(INCHES)
11/23/18
TEST HOLE PRESOAKED PRIOR TO TESTING:
1
1:37/1:47
10
4/816
416
2
1:50/2:00
10
4/816
46
3
2:01 /2:11
10
4/816
416
4
2:12/2:22
10
4/86
46
5
2:23/2:33
10
4/816
4 8
6
2:34/2:44
10
4/816
4T
PERCOLATION RATE: 2.2 (MIN/INCH) PERC. HOLE DIA. 6 (INCHES)
TEST RUN BETWEEN: 2 FT. and 3 FT.
SOILS LOG AND PERCOLATION TEST
E N G I N E E R I N G
LEGAL DESCRIPTION: UPLANDS LOT 3
PERFORMED FOR: THE BOUTET COMPANY INC.
DATE: 10/25/18 PROJECT No.:
PARCELID#: TECHNICIAN: J. MILLETTE
J. WILLIAMSDEPr,, TEST HOLE
(feet)
1 kii?li�tlf{f
2
3
4
5
6
7
8
9
10 ..
11 ��
12
14
15
16
17
1
1
COMMENTS:
•:
GM (SANDY SILTY GRAVEL)
SLOPE
WAS GROUND WATER ENCOUNTERED? YES
SITE PLAN
SEE SITE PLAN
IF YES C WHAT DEPTH? III
READING
GROSS TIME
(MINUTES)
DEPTH OF WATER AFTER MONITORING: 6'
0
NET DROP
(INCHES)
DATE Of MONITORING: I I -L -18
P
1
E
DATE
READING
GROSS TIME
(MINUTES)
NET TIME
(MINUTES)
DEPTH To
WATER
(INCHES)
NET DROP
(INCHES)
11/23/18
TEST HOLE PRESOAKED PRIOR TO TESTING:
1
1:28
616
2
1:58
30
816
1 16
3
1:59
64
4
2:29
30
816
1 A
5
2:30
616
6
3:00
30
816
1 16
PERCOLATION RATE: 24 (MIN/INCH) PERC. HOLE DIA. 6 (INCHES)
TEST RUN BETWEEN: 1.5 FT. and 2.5 FT.
DEPTH
(feet)
1 -
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
1
2
SOILS LOG AND PERCOLATION TEST
E N G I N E E R I N G
LEGAL DESCRIPTION: UPLANDS, TRACT I, LOT 4
PERFORMED FOR: THE BOUTET COMPANY
DATE: 5/4/19 PROJECT No.:
PARCELID#: PROPERTY ID TECHNICIAN: J. WILLIAMS
TEST HOLE A
SITE PLAN
SEE SITE PLAN
SILTY SANDY GRAVEL
r
GM
COMMENTS:
DATE
READING
WAS GROUND WATER ENCOUNTERED?
NO
DEPTH To
WATER
(INCHES)
NET DROP
(INCHES)
IF YES v WHAT DEPTH?
-
`
2:48/2:58
DEPTH OF WATER AFTER MONITORING:
NONE
2-7/16
2
DATE OF MONITORING:
ll//4/18 P
0/2-8/16
2-8/16
3
E
10
0/2-7/16
2-7/16
4
3:26/3:36
10
0/2-7/16
2-7/16
5
3:38/3:48
COMMENTS:
DATE
READING
GROSS TIME
(MINUTES)
NET TIME
(MINUTES)
DEPTH To
WATER
(INCHES)
NET DROP
(INCHES)
3/4
TEST HOLE PRESOAKED PRIOR TO TESTING:
1
2:48/2:58
10
0/2-7/16
2-7/16
2
3:00/3:10
10
0/2-8/16
2-8/16
3
3:13/3:23
10
0/2-7/16
2-7/16
4
3:26/3:36
10
0/2-7/16
2-7/16
5
3:38/3:48
10
0/2-8/16
2-8/16
6
3:51/4:01
10
0/2-8/16
2-8/16
PERCOLATION RATE: 4.1 (MIN/INCH) PERC. HOLE DIA. 6 (INCHES)
TEST RUN BETWEEN: 3 FT. and 4 FT.
SOILS LOG AND PERCOLATION TEST
' E N G I N E E R I N G
LEGAL DESCRIPTION: UPLANDS LOT 4
PERFORMED FOR: THE BOUTET COMPANY INC.
DATE: 10/25/18 PROJECT No.:
PARCELID#: TECHNICIAN: J. MILLETTE
J. WILLIAMS
DEPTH TEST HOLE 7
(Illeet)
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
IiIIIIIINE.,
GM (SANDY SILTY GRAVEL)
SLOPE
SITE PLAN
SEE SITE PLAN E4
COMMENTS:
DATE
READING
WAS GROUND WATER ENCOUNTERED? NO
NET TIME
(MINUTES)
DEPTH To
WATER
(INCHES)
NET DROP
(INCHES)
IF YES Ca, WHAT DEPTH? -
L
1
12:08
DEPTH OF WATER AFTER MONITORING: NONE
0
;
2
DATE OF MONITORING: 1-4-18
P
7 16
2 16
3
E
516
COMMENTS:
DATE
READING
GROSS TIME
(MINUTES)
NET TIME
(MINUTES)
DEPTH To
WATER
(INCHES)
NET DROP
(INCHES)
11/23/18
TEST HOLE PRESOAKED PRIOR TO TESTING:
1
12:08
516
2
12:38
30
7 16
2 16
3
12:40
516
4
1:10
30
78
2
5
1:11
5 4
6
1:41
30
717
2-1
PERCOLATION RATE: 13.7 (MIN/INCH) PERC. HOLE DIA. 6 (INCHES)
TEST RUN BETWEEN: 4 FT. and 5 FT.
DEPTH
(feet)
1 -
2
J
4
5
6
7
8
9
1
14
15
1.6
17
18
19
20
SOILS LOG AND PERCOLATION TEST
E N G I N E E R I N G
LEGAL DESCRIPTION: UPLANDS LOT 5
PERFORMED FOR: THE BOUTET COMPANY INC.
DATE: 10/2Z4/18 PROJECT No.:
PARCEL ID#: TECHNICIAN: J. MILLETTE
J. WILLIAMS
TEST HOLE 8
x '
GM (SANDY SILTY GRAVEL)
COMMENTS:
Ilowill"m
Q .I WAS GROUND WATER ENCOUNTERED? NO
IF YES r WHAT DEPTH ? -
DEPTH
L
DEPTH OF WATER AFTER MONITORING: NONE 0
DATE OF MONITORING: II -L-18
P
n E
SITE PLAN
SEE SITE PLAN
DATE
READING
GROSS TIME
(MINUTES)
NET TIME
(MINUTES)
DEPTH To
WATER
(INCHES)
NET DROP
(INCHES)
11/9/18
TEST HOLE PRESOAKED PRIOR TO TESTING:
1
12A5
516
6
2
1:15
30
7
6
3
1:16
56
6
4
1:46
30
616
6
5
1:47
56
6
6
2:17
30
615
6
PERCOLATION RATE: 21 (MIN/INCH) PERC. HOLE DIA. 6 (INCHES)
TEST RUN BETWEEN: 4 FT. and 5 FT.
SOILS LOG AND PERCOLATION TEST
E N G I H E E R I H G
LEGAL DESCRIPTION: UPLANDS LOT 5
PERFORMED FOR: THE BOUTET COMPANY INC.
DATE: 10/24/ 18 PROJECT No.:
PARCEL ID#: TECHNICIAN: J. MILLETTE
J. WILLIAMS
Dr__PTH TEST HOLE 9
((eCl)
1
2
3
4
5
6
7
8
9
10
1.1
12
13
14
15
16
17
18
19
2
COMMENTS:
r N 111301:
GM (SANDY SILTY GRAVEL)
SLOPE
WAS GROUND WATER ENCOUNTERED? NO
IF YES m WHAT DEPTH? - L
DEPTH OF WATER AFTER MONITORING: NONE
DATE OF MONITORING_ 11-4-I8
E
SITE PLAN
SEE SITE PLAN
DATE
READING
GROSS TIME
(MINUTES)
NET TIME
(MINUTES)
DEPTH To
WATER
(INCHES)
NET DROP
(INCHES)
11/9/18
TEST HOLE PRESOAKED PRIOR TO TESTING:
1
1:18
51s
2
1:48
30
716
1 16
3
1:49
51s
4
2:19
30
716
1LO
16
5
2:20
51s
6
2:50
30
716
1 is
PERCOLATION RATE: 18.4 (MIN/INCH) PERC. HOLE DIA. 6 (INCHES)
TEST RUN BETWEEN: 4 FT. and 5 FT.
DEPTH
(feet)
1
2
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
`MUNICIPALITY OF ANCHORAGE
DEVELOPMENT SERVICES DEPARTMENT
4700 ELMORE ROAD ANCHORAGE, AK 99519-6650
SOILS LOG AND PERCOLATION TEST
LEGAL DESCRIPTION: UPLANDS S/D - LOT 6
PERFORMED FOR: THE BOUTET COMPANY
DATE: 11/15/17 PROJECT No.:
PARCELID#: TECHNICIAN: J. MILLETTE
TEST HOLE 911
SAND
SITE PLAN
SEE SITE PLAN
i
U
y; SANDY GRAVEL
W/ SOME SILT
HARD PAN @ 8.5'
WAS GROUND WATER ENCOUNTERED? No
IF YES n 'All -]AT DEPTH? - L
DEPTH OF WATER AFTER MONITORING: NONE 0
DATE OF MONITORING: 11/22/17 P
10/31/19 E
DATE
READING
GROSS TIME
(MINUTES)
NET TIME
(MINUTES)
DEPTH To
WATER
(INCHES)
NET DROP
(INCHES)
II/14
TEST HOLE PRESOAKED PRIOR TO TESTING:
1
9:34
0
2
9:44
10
4%4
4%4
9
10:18
0
10
10:28
10
4
4
11
10:29
0
12
10:39
10
4
4
PERCOLATION RATE: 2.5 (MIN/INCH) PERC. HOLE DIA. 6 (INCHES)
TEST RUN BETWEEN: 2 FT. and 3 FT.
COMMENTS: PERK TEST WAS RUN 6 TIMES. INTERMEDIATE RESULTS ARE NOT SHOWN FOR CLARITY BUT WERE SIMILAR.
DEPTH
(feet)
1 -
2 -
4-
5-
6-
7-
8-
9-
10-
11-
12-
13-
14-
15-
16-
17-
18-
19-
20 -
MUNICIPALITY OF ANCHORAGE
DEVELOPMENT SERVICES DEPARTMENT
4 700 ELMORE ROAD ANCHORAGE, AK 99519-6650
SOILS LOG AND PERCOLATION TEST
LEGAL DESCRIPTION: UPLANDS S/D - LOT 6
PERFORMED FOR: THE BOUTET COMPANY
DATE: 11/13/17 PROJECT No.:
PARCEL ID#: TECHNICIAN: J. MILLETTE
TEST HOLE 92�
•:
COMMENTS: _
HARD PAN @ 8.5'
SLOPE
SITE PLAN
SEE SITE PLAN
v
WAS GROUND WATER ENCOUNTERED'?
No
GROSS TIME
(MINUTES)
IF YES @ WHAT DEPTH'?
-
L
II/14
DEPTH OF WATER AFTER MONITORING:
NONE
0
5:45
DATE OF MONITORING:
11/22/17
P
2
10/31/19
E
5 3/8
DATE
READING
GROSS TIME
(MINUTES)
NET TIME
(MINUTES)
DEPTH To
WATER
(INCHES)
NET DROP
(INCHES)
II/14
TEST HOLE PRESOAKED PRIOR TO TESTING:
1
5:45
0
2
6:15
30
5 3/8
5 %
3
6:16
0
4
6:46
30
5%4
5%4
5
6:47
0
6
7:17
30
5 %4
5 %4
PERCOLATION RATE: 5.7 (MIN/INCH) PERC. HOLE DIA. 6 (INCHES)
TEST RUN BETWEEN: 2 FT. and 3 FT.
SOILS LOG AND PERCOLATION TEST
ENGINEER 1 N G '
LEGAL DESCRIPTION: UPLANDS LOT 7
PERFORMED FOR: THE BOUTET COMPANY INC.
DATE: 10 / 24 / 18 PROJECT No.:
PARCELID#: TECHNICIAN: J. MILLETTE
J. WILLIAMS
DEPT1-I TEST HOLE 10
re'et)
1' OB
3
4 1
5 a
6
% u:`�:, ��:GM (SANDY SILTY GRAVEL)
8
9 —I
u
12
13
14
15
16
17
18
19
20
COMMENTS:
SLOPE
WAS GROUND WATER ENCOUNTERED? NO
IF YES a WH
DEPTH OF WATER AFTER MO
z DATE OF MO
SITE PLAN
SEE SITE PLAN
AT DEPTH? - L
NITORING: NONE O
NITORING: II -4-18 P
E
DATE
READING
GROSS TIME
(MINUTES)
NET TIME
(MINUTES)
DEPTH To
WATER
(INCHES)
NET DROP
(INCHES)
11/9/18
TEST HOLE PRESOAKED PRIOR TO TESTING:
1
11:05/11:15
10
6/1116
516
2
11:17/11:27
10
6/11 7
516
3
11:28/11:38
10
6/1116
516
4
11:39/11:49
10
6/11-
516 16
5
11:50/12:00
10
6/111-
516
6
12:01 /12:11
10
6/1116
5�s
PERCOLATION RATE: 1.9 (MIN/INCH) FERC. HOLE DIA.—.6—(INCHES)
TEST RUN BETWEEN: 4 FT. and 5 FT.
SOILS LOG AND PERCOLATION TEST
E N G I N E E R I N G
LEGAL DESCRIPTION: UPLANDS LOT 7
PERFORMED FOR: THE BOUTET COMPANY INC.
DATE: 10/24/18 PROJECT No.:
PARCEL ID#: TECHNICIAN: J. MILLETTE
J. WILLIAMS
DEPTH TEST HOLE 1�
( feet)
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
m
GM (SANDY SILTY GRAVEL)
n5 i a
COMMENTS:
SLOPE
WAS GROUND WATER ENCOUNTERED? NO
IF YES i{ WHAT DEPTH? - L
DEPTH OF WATER AFTER MONITORING: NONE 0
DATE OF MONITORING: I 1-L -18 P
E
SITE PLAN
SEE SITE PLAN
DATE
READING
GROSS TIME
(MINUTES)
NET TIME
(MINUTES)
DEPTH To
WATER
(INCHES)
NET DROP
(INCHES)
11/23/18
TEST HOLE PRESOAKED PRIOR TO TESTING:
1
11:09/11:19
10
56 /11
516
2
11:20 /11:30
10
58 / 11
56
3
11:31/11:41
10
56 /1016
516
4
11:43/11:53
10
56 /1016
516
5
11:54/12:04
10
56 /1016
5-s
6
12:05/12:15
10
518 /1016
5 4
PERCOLATION RATE: 1.9 (MIN/INCH) FERC. HOLE DIA.—_.6__(INCHES)
TEST RUN BETWEEN: 4 FT. and 5 FT.
NOTE:
ALL WELLS ON SURROUNDING LOTS WITH IMPACTS TO THIS PROPERTY ARE SHOWN. NO CONFLICTS WITH
WELLS OR SEPTIC SYSTEMS. THIS SUBDIVISION IS SERVED BY PUBLIC WATER.
LOTS 3A and 5 REQUIRE CATEGORY III SEPTIC SYSTEM.
LOT 2 REQUIRES A CON VENTIONAL SEPTIC SYSTEM RESTRICTED TO A FOUR BEDROOM HOME.
IFAFNn
SEPTIC RESERVE AREAS
»49th _rye -7y� : CONTOUR INTERVAL - 2'
MICHAEL E. ANDERSON 1 �®
0 50 100
No. CE -4381® FEET
11 0 j27120
1 =�q 'm 11.50 1
THE CONntACTOR SHALL NOTIFY ALL AREA UTILITY COMPMAES
PRIOR TO COMJ.tENCEMENT OF EXCAVATION. THE FOLLOWING
IS A PARTIAL LIST:
ALASKA DIG LINE - 811
LOCATE CALL CENTER OF ALASKA
278-3121
QNClU—ACS. AV . CEA, ENG, EUILER AVIATIONITESOR0,
GCI CABLE, MLP. TRAFFIC SIGNALS. WA STORMSTREETS.
AND ALASKA FIBER STAR.)
STATE STORM/STREET LIGHTS
333-2411
MILITARY PETROLEUM LINES
862-4112
THE BOUTET CO I Forge Engineering
601 E 57th St #102 PO Box 240773
Anchorage, AK 99518 Anchorage, AK 99524
907-522-6776 907-522-7773