Loading...
HomeMy WebLinkAboutAs Built for Southwind>> > > > >> > > > 2 5 ' ### 2 5 ' WORK ORDER No:DATE:SCALE: DRAWN: JLA CHECKED: ROL ZONING: 1"=50'31 May 2023 R-10SL GRID No:FB BOOK/PAGE: SW2143 164/72 SURVEY CERTIFICATION: FARPOINT has conducted a physical survey of the subject property, the improvements situated thereon are within the property lines as shown. EXCLUSION NOTES: It is the owners responsibility to determine the existence of any easements, covenants, or restrictions which do not appear on the Plat used for this survey. NOTE: Under no circumstances should any data hereon be used for construction or for the establishing of property lines. PREPARED FOR: Lisa & Edward Ernest ASBUILT SURVEY OF: Found Rebar Address Marker Cleanout Elec Meter Robert O. Lumpkin No. 10459 SERVI N G A L A SKA SI N C E 1 9 8 2 Lot 3, Hillside North Subdivision, Anchorage, Alaska (Plat 2001-176) 1.Bearings and distances are record per referenced plat unless otherwise noted. 2.Not all monumentation for this survey may be shown on this document. 3.Excepting for gross negligence, the liability for this survey shall not exceed the cost of preparing this survey. 4.Elevations and contours shown are based on GPS observation on the NAVD88 datum computed using Geoid12B. 305' ### Elec Meter Well Tele Pedistal Drainage Arrow Elevation