Loading...
HomeMy WebLinkAboutWOODHAVEN HEIGHTS S-11199-15-11199-1 WOODHAVEN I Short Plat Summary of Action January 5, 2004 5-11199 Woodhaven Heights Subdivision Approval of the plat for 18 months subject to the following conditions: 1. Resolving utility easements. —�-� 2. Resolving with On -Site Water and Waste Water information to satisfy the ggo Jo ,r� requirements specified in AMC 21.15 and AMC 15.65. The information P !r % must be submitted for each lot of this proposed subdivision. This DES �V' rs information must include, but may not necessarily be limited to: PrS v oq I','I�QI Soils testing, percolation testing and ground water monitoring . fo must be conducted to confirm the suitability for development using GNL��40 on-site wastewater disposal systems. Ground water monitoring ' • must be conducted during high ground water season in either the fall (October) or spring (April -May). • Areas designated for the original and replacement wastewater disposal system sites must be identified and must meet all criteria specified in AMC 15.65, including slope and setback requirements. • Topographical slope information must be submitted. • Supporting documentation on water availability must be provided. �yn'10-3 Eliminating the 30 -foot road easement on the western property boundary if •�'7J'y /f being provided via this plat. If the easement exists of record, or. vacate the / G easement if the Traffic Department concurs. Resolving with the Traffic Department, the need to continue the road right- -- of -way to the east property line, for future connection to Betty Jean Street. vg -Ar c rr I Ar 'Providing a25 -foot Stream Maintenance and protection easement along both sides of the stream as required. by AMC 21.80.040. 6. Showing the wetland boundary on the plat and the class designation. ��is�.y . * ` lacing the following notes on the plat: a. Portions of this property are affected by Class B wetlands. A permit from the Army Corps of Engineers is required for work within the Class B wetlands portion of this property. b. No structures; fill; paving; vehicles, or other materials may be placed within the 25 -foot stream maintenance and protection easement. No vegetation may be cleared or otherwise significantly EST AHLISHEO 19.19 July 27, 2004 MOA On -Site water and Wastewater 4700 s. Bragaw Anchorage, AK 99517 Attention: Dan Roth Regarding: Plat Sign -off, S-11199 Greetings: Enclosed please find a copy of the soils information for the above referenced subdivision. Also included is a copy of the "Conditions of Approval" for the platting case. Please review this information in regards to Condition No. 1 and forward any comments to our office. If the condition is meet please sign the conditions sheet and notify our office for pick-up. Please note that enclosed conditions sheet contains original signatures and must be returned for submittal with the final plat. Please contact me at 272-5451with further questions. Sincerely, Lounsbu� Associates, Inc. Bra inckey L.S.I.T. Senior Survey Technician sO�Qt A�f�c i 723 West 60 Areaut Anchorage, Alaska 99501 T. 907-272.5451 F 90] 272-9065 �a P Gy 3161 L Palmer-Wasilla BighaM Suite 2 Wasilla, Alaska 99654 T 907357.9129 F: 907.357-9140 Jul 01 04 C3:25p DEAN CO MAR -07-03 81536 PM s Munlclpality otAnchonge DevNop ��00ma0) • Om sue water and watewatef Program 4700 sewn Wlg"e sc P.O. Ba 198850 Anrhoc¢, /1K 085148850 2=MLMO1eNlteP,me Lla (907) 3117904 Solis Log -Percolation Test VerfmmcdFor; DXAPJ C0,4AAA+Y INC lspatDesafprwrcPfBoPuaA 1471 WOJ'ANAyt—_IlfilTo-nsfJp. 0 A4A-jt c J G^CA4vtLsy� }�jv Sf4.ry pjrD 47 ,T FR4vswY,0JA-Ay /hl WAs6N0(MWATER SILL ENCOMER907 yES t 1R YFi(S WHAT OE➢!10 &j/ 1 OsA bM.ter Ahw0 0.0.11. Nw kmtn+ One' )04/` JOf'in�Oe— of f/A. 907 277 7087 p.2 P.03 WMT G COWAN CE -8801 11eMPy !/ale Gross Time Net Time Depo'bwate. Net rxop ID 70 #M__13'0 ri 60 96-11. oMf✓ PE MATIM0111 t ......�u'u Tcfl .. COONAENTS TRTR{Rf OEt'ALfN rT AHD—FT By! f WGIMitRING —._ PERFORMEDE01N ,�j�,�� 1 7r `CERfjrYTsfAr .ry - P PetfFDrw r� 3 M TCJT L/ EO tN EAr+>3'WF7ICIPAt. GUtOEIwEg NEf FF.CT Ott DAIS. GATE: tt/i/ui Yr I Jul 01 04 03:25p DEAN CO rAfZ-07-03 01:37 PM e Municipality of Anchorage Ooveb O Servke"V Safety �arVneni i! OmSke Water vd Waetewoter program 4700 South Stagew SI, P.O.Ooa 1%650 Andwrage. AK 995194650 www.d.andwaae ak us 15on 343-7904 Soils Log - Percolation Test Performed For, j►C/J,4 CJakrdA,,,Y, _/tiC. _ I.egalDescry,tton: PRa/'Oted for 3 tuceoNivr..//�/ T'i—'t COMMEN 64 4Ar141 Syr.rt j4"f C. G-4AV4L PEIVORb1G0 BY. Sal Pf"ORUEO IN Aft WASCMUDWATER Yct i IFVfS,ATVMATOCPTNt IIS' t ClA Y Wyk. Me. 0 NairaMef �w f pre: Jo a�oi IDA r1% a. 1.1 ' 907 277 7087 p.3 P.04 11101447 C. COWAN CE •81!01 R91 -d49 Wte Gross n 'e Not IIFTC Depth to Water Not Drop �0 .1 !N " 7V rr b� 70nry -- ►......i.. 7:3 M.P. �— ( j '/A. 4 7 PERCOX04PAIE 44 TEST RUN 6c"AYEsN-r�'!L�.R ANp�i��I1 FT • ••�c�ur .ter� PUCE 04EEf( TON 11 EnTIFE 04II :S TEST WAI L Jul 01 04 03:25p DEAN CO 907 277 7087 p.4 r„airo rroa b1:6e M47 P.05 Munlcipallty of Anchorage Development Servfm Department aueeeq 34ktT D"kn On.SRe Waley mid WetlCMOler PIVAm 4700 Souh Srayav 3l. P.O. floe 196MAndraage• AK 99ST9.6651 Wa.. d enchoraae e4 vl (9071 NS79D1 Soils Log - percolation Te PertomwdFor.. OL4•1 GO^04mY . too Dczcrlp0on: Pk'Jresto LOT' ty000 NAre.. 46>frrneAsldG ITT TI 0vec.4r1 cs cm/fw 15- N. 15. TT- 1a- te- zo- COMMENTS PERrORPALODyt Olt PERFORMED M AC In', V% Dote River, WAS GRO" WATER PCOUNTEREa+ N 0 S eFYE3.ATMIATDEM? 1 Depth b Wait, Afto 0 t tws 1 10.44. 1 O 1,;a t,%d z in 'L , fU.Adamy -V- DFIe Groea Time Nel TiTa Chmh 10 Water Net nnT Wien N I rb-L V ivy • ALc.K r _— 10 044,0 q`yyT, - r4 7" 70y y . r I 17 to v %a •-••w�• .- •-•• a r...a. rury1ULEDI4IETEn (�'• TEST RUN DEIWFfN -FT A1q� FT -- IIIFY THAT THIS TEST WAS DATE. DATE: /0 a IO i Jul 01 04 03:26p DEAN CO Munlcipallty of Anchorage Oevclopmenl SeMees Depeftment eueding Safely DIvlslon On.VIC Walcr and Wastewsler No"n 4700 3oue, ardww 3L P.O. box TW ASO Aocf"sgo. AK 09519.easo 1907) 3y7904 907 277 7087 Soils Log • Percolation Test Prinimed Fix: OC4-y CdnrANy, 1NC,, Dale Peric Le0+4Dwtrar: PR4r.sto tv•r- w NoaoNAvr,r #rjTuwttenlp."a.Seellon: TO !7- 6 r—r—or=-1 r--T---r— G��Sw Gie�vtL d g JA^'o rely M L J'rL. r LAeci /.art(•1 lto wj .t, 44 -j-00) WAS GROUND WATER b�An:'1N ENCrANTME07 NO a IFVES.ATWNATDCMM � L W41AbWAW Alrar 0 wwreorin47 An.Y r E )OI>gINL DAY SOMI C. COWAN CE -0001 ri E. P.5 P.O6 ResCulp Gala GrOsi Tone Ncl Tine Depth to waltt Not Drop W.!I _Ad PERCOLATION RATE e i C.IF L LJ,vJ a✓ ..✓ TesrRVH elstv+La�n AND S ar COMMENTS i�17-/I�LUMWICR 4b I.A4Lt R.4- .t na J, .7 PERFORMED HY: j; S ENN;ff=RiNG 1 . PERFORMEDINACCOi� L CS DA tI tat TC: TEST WAS �� R1wt. A o s• t ICI L GVIDELINCS W EFFECT pN TINS DATE. pgTC: Jul 01 04 03:26p *QR -07-03 01133 Ph 21 f -Y 1 1 I 01 I 1 1 1 I I I it 11.1 Il..t 1 M •'1 DEAN CO 907 277 7087 -�,_ALLUCA_f1UN5 .... 1-,erilrlOU _ ... . DON JACK,3SUBD T.... .. 'lir ::w �:: '_'__•�_� ..I �1« J I3! TRACT n m W to I CRrt>✓tc e, j _-t00' ktr SMACK u I - - I y7 r j [ ilt: tl[S�Rv� t 'AHA 10,1100 S.r. /,A 6 IBCr'IIC ME, URCA to. 600s.r \ LOM 1103+ DM.k IqM• I.TMI3 1 A411 WK11, MAt.A 991II F)IO-L1 19w 69t•!9ro IA41 (9a).91 t11, 2 :~ ; w w 0 Y, � J I >0 ' n . t.; 5-110.3,) / Ot•t0 UCjnp fJ s 1,z M m / tiAm4[ CC, Q., KO0 X 1t s Z 2 L + N[m71 Wr1Z f) n { Q A .V to w;0 co oy2 s� O �_ �h oW 7 � N EE C31. 1 111 N ci =r- ?0�0 1•t 300D 2 -v bp ;n>ti!ta j fA >dN� ..,za m Ocy 01-10 AZH myQ KI/� Caw poi U �1K SNC h lJ -1 y yN Z FSH ' n . t.; 5-110.3,) Municipality of Anchorage . DEPARTMENT OF HEALTH & HUMAN SERVICES / Environmental Services Division 825"L" Street, Room 502 • Anchorage, Alaska 99501 • (907) 3434744 Health Authority Approval Checklist ., Legal Description: Lot 3 Ctoc k' I Wool Parcel I.D.: A. \YELL DATA Well type Pv f If A. B, or C. attach ADEC letter. ADEC Hater system number Log present (YIN) Y Date completed It / S 2 Total depth 2 eo ' Cased to 4G' Casing height (above ground) 2'1 " Sanitary seal (Y/N) Y Wires properly protected (Y/N) Y FROM WELL LOG AT INSPECTION Date of test ti /6z / 13 / 9'3-z Static water level N Ll semr-rtr� i►i� 9 1'i 1 Well production = LS g.p.m. S: 7 git-1n. W O WATER SAMPLE RESULTS: 1'71 CA 3O Og Coliform Ocol /loom I- Nitrate 4O.I.".r/e Other bacteria mo*< rrwor O " Date of sample: 2 113 /9 s Collected by: Floifor 7 -*c4 Svc Z B. SEPCICIIIOLDING TANK DATA Date installed i o 1 8 2 Tank size t ZS'O a Number of Compartments _2 Clcanouts (Y"__K_ Foundation cleanout (Y/N) Y Depression (YIN) N High water alarm (Y/N) Al. n Date of Pumping 9 / 16 /9s Pumper -rs� a e -f C. ABSORPTION FIELD DATA Date installed t o / a,7 / H 2 Soil rating (g.p.d./tl= or lt2/bdrm) fro o'/ipf Systcm type ffew Length 39 Width ?o Gravel thickness below pipe ! "- z y t Total depth '/.S Effective absorption area 7 9 o cr 1 Monitoring Tube prescnt(Y/1)_r _ Depression over field (YIN) N Date of adequacy test 9 / 13 /95- Results (Pass/Fail) Pori For 3 bedrooms Fluid depth in absorption field before test (in.): 2 Immediately after 7t j gal. water added (in.): 3 Fluid depth 7 O Minutes later: 2 (in.) Absorption rate - _> y.3-0 e.p.d. Peroxide treatment (past 12 months) (Y/N) No1. kn&a. Ifycs, give date N. d. LOCATION OF WELL F aocH 1,4 114 Susory I0N LOCATIONISKETCH: LOT I BLOCK SECTION OTRS DEPTHS MEASURED FROM:❑casing top ❑ground surface BOREHOLE DATA: Depth Material Type and Color From TO � n 1%. 5 RECEIVED JUN 0 Rrl.ti v I -v I 14o hot e Human e Dept. Health &Hum STATE OF ALASKA DEPARTMENT OF NATURAL RESOURCES DIVISION OF WATER WATER WELL RECORD WELL OWNER: SECTION I TOWNSHIP I RANGE MMOIAN ON ❑E ❑s ❑w WELL DEPTH: DATE OF COMPLETION Depth of hole:�—ft / 3 Depth of casing: 3 " ft DEPTH TO STATIC WATER LEVEL' `L itbelow LFtop of casing ❑ ground surface Date: METHOD OF DRILLING: w air rotary ❑ cable tool ❑ other USE OF WELL' Mornestic ❑ irrigation ❑ monitor ❑ public supply ❑ other CASING Diam: to WELL INTAKE OPENING TYPE ❑ open end ❑ screened ❑ perforated ❑open hale Depths of openings to � It SCREEN TYPE q SlotlMesh Size: GRAVEL PACK TYPE Volume used: \ Depth to top: GROUT TYPE Volume- n.mh• frnm tt t0 It It DEVELOPMENT METHOD --— Duration PUMPING LEVEL AND YIELD' .2"•0ft after _'4/ hrs pumping Qprn PUMP INTAKE DEPTH: It Horsepower. WELL DISINFECTED UPON COMPLETION? fl YES ❑ NO ._'CCOO-NTRACTOR REMARKS: ----- � —.. WFO,nRR/MATK)N: - ep�spred Business Nam .. " o PLEASE MAIL WHITE COPY OF LOG TO :Z ��DNR/O BOX OF WATER = _ - .' :_. Ignature o uthonze a resentative . �P..... ata • • .. • , <� �� PO ER AK79957 _ ... GLE RN _ 7.2116y _ .� _ -, ...., - - ~�--• rtiT r .n•i w•cwc au•.J x.o c�wuCCrCrr1U W? 694 1211 P.02/11 MUNICIPALITY OFANCHORAGE Ocvelopment Services Department On -Site Wafer d Wastewater Program 4700 South Bragaw Street P.O. Box 196650, Anchorage, AK 995194850 (907) 343.7904 ON-SITE WASTEWATER DISPOSAL SYSTEM I WATER SUPPLY PERMIT Initial Date Issued: Oct 11, 2002 Expiration Date: Oct 11. 2003 Permit Number: SW020407 Parcel ID: 020-092-06 Legal Description: TI IN R3W SEC 3 S2SW4NE4NW4SE4 6 W2SE4NW4SE4. Design Engineer. 0003 S E S Engineering Site Address: Owner Name: The Dean Company Lot Size: 272250 SO. FT. Owner Address: 405 E Firewood Leine Total Bedrooms: 4 Permit Bedrooms: 4 Anchorage . AK 99503- "t. This permit is for the construction of. L Disposal Field 0 SeptieTank' ❑Holding Tank ❑ Privy E] Private Wei O Water Storage AB construction must be In accordance with: ' 1. The attached approved design. 2. An requirements specified in Anchorage Municipal Code Chapters 15.65 and 15.65 and the State or Alaska Wastewater Disposal Regulations (1SAAC72 ) and Drinking Weiler Regulations (18AAC80 ). 3, The engineer must no* DSD at least 2 hours prior to each Inspection. Provide notification by calling (907) 343.7904 (24 hours ). ( Not required for a Water Supply Permit only). 4. From October 15 to April 15; a subsurface soil absorption system under construction during freezing weather must be either: A. Open and closed on the same day. B. Covered, sealed, and heated to prevent freezing. - Received By: Issued By: S 1119 9 DEC 1 5 20M Date: Date: IrOct=29 03 02:29.p -- DEAN COu,u,xcrc�w 907 2777 7907 60871211 P.03�11p.3 Municipality of Anchorage Development Services Deportment Building Safety Division On-51te Water and Wastewater Program 4700 Bragaw Street P.O. Bax 196650 Anchorage, AK 99519.6650 www.&andhorageakus (907) 343-7904 $ 1119 9 DEC 1 5 W Installation Requirements for Septic Tanks in the. Municipality of Anchorage: Steel - Steel septic tanks shall be placed on undisturbed soil at the bottom of the excavation for the tank and backfilled with a granulcr material free of Jorge rocks or boulders to a maximum depth as_ prescribed on the exterior of the septic tank. The tank may then be backfilled with 12 -inch maximum layers of -granular soil and trampled evenly following the placement of each layer. • H.D.PZ Premier Plastic tanks shall be placed on compacted or undisturbed bedding of sand/gravel mixture or clean granular soil: Allow clearance around the tank to properly place and compact backfill' around the lower half of the tank. --All Premier Plastic tanks shall have e vertical length of 4 inch perforated drainpipe beside the tank extending to the bottom of the tank and up to grade to monitor the ground water table. The tank may then be backfilled with 12 -inch maximum layers of granular soil and trampled evenly. Fiberglass Tank - Excavate at least twenty-four inches beyond all sides of the tank to allow room for proper compaction. Set tank level" on a minimum 4 inch thick compacted sand or granular bed overlying a firm compacted and uniform base. Backfilling is a layering process that involves backfilling, compacting the backfill, and filling the tank with water to a level just above the compacted backfill layer. Backfill should have a uniform gradation and be free of any deleterious materials such as stones that are more than 2 1' in diameter. Typically to crushed rock or pea gravel is preferred. Each backfill layer should be uniform, no greater than 24 inches thick, and of nearly equal height around entire perimeter of the tank Oct 29 03 02:29P DERN CO ..... ..I �. .Y -LM >d� G'UlMtKINL 907 277 70G7 p.4 907 694 1211 P.04111 1" c 50' DESIGN SITE—PIAN I .I N000 ^fie CG a.1y O—'gym .5 �. �_ O y_-=• R.. < t m Cn 0 a �'�-- 11 \ N o � 3" t ---------- ----' ------ . BETTY ST. �m 1l n W C 10' UTILRT CASEMENT o r tn LA 0 I h 1 ' � LM CA � I ti m by N_ �- p� I m -y ,>, A 1 Q I l 1 1� N n31rM 3�vltlnS >nDy�� >t�vaL7s •Q0 1 � 1 4F4X� � t�jae. %II 10' ELECTRIC k TI i::4\KUNDCVC40PCO--� s HGAI COR0pD E c All s�� z� e I $1119 9 DEC 1 5.2003 M EASCMENT UNDEvFI C"� OPED �J 1 1 1 of �1 nj pl �+ 1 >r I 0 y 1 1 I 1 1 1 1 I I 1 F IN Figs z O c y i�o i R 'AVN 0 QED eU2 u \ o "Oct 29 03 02:29p DERV CO..,.�.ccrt�„u 907 2777 70887 p-5 1211 P.OS,ll 907 6 1" = 100' DESIGN SITE -PLAN C gs� ------------ LMt7Qe 3g16: • 8 s i •,..�� �tCO AY)E r ^',i ;a Z��r+Z s� pop t5 ', H ►i o 0 O li cN�En i u+ P bo 11 - - - co ----- ---------co --.. BETTY Fr. p �.ii — I LA010 J ' • « LA ;W w 9 n H S 1119 9 DEC 1.5 200.1 o LO w== 0 L ."R IMCMUR:-TIE-Hr "Aso"O"'"0 P/ 0 st Lr WYESATV"TQ6P_-K7 .. L 0 to, 13.e.d. 15 - 907 694 1211 P.011/11 e • it io PO 1.4 Q Yly IE v -:3 'selling Dist, M31NURING 'Gross Tune I Municipality of Arichoii9e Dwplh b Wale ' Not Dew Developmeid k.jj Department $r, ' — - O*S1 Vh*vId WUWAQW Plogram 30 30 solli.Log Test Performed for. 4,4fj Y.. C rl* Legal oescrlpl;m PAPP!?" L47* Woo 0 AOA V&W, *A75 T.MmsNp. FAKe. Sec , "m ;L 0 L ."R IMCMUR:-TIE-Hr "Aso"O"'"0 P/ 0 st Lr WYESATV"TQ6P_-K7 .. L 0 to, 13.e.d. 15 - 907 694 1211 P.011/11 e • it io PO 1.4 Q Yly IE v -:3 'selling Datc . 'Gross Tune I Net7krz Dwplh b Wale ' Not Dew $r, 0 1 — - S- 7/1 30 30 60 ;L P'!A=A­.*NFL%TI_T.(f r . ZA� �.UwtTep. ro "' T R-im a Cum Em �. 5: AD IT COMMEWS S a z ENGINCERWO PERFORMED BY2 PERFORMED N Us S 1119 9 DEC 1 52W3 , Gli^-- CERTIrYTYAT TKS TEST WAS. IN EFFECT ON TYJS DATE. DATE: 43eti.29703 02s29p DERM CO u.ulrceKtw Municipality of Anchorage Oevvepment Services Department Buadng sa" Dwon • �..e on -sae Wakr a Cd wafkwta Progan 4700 30M Braga\+ SL P.O. boa MEW Agdwape. AK 995194850 """ d.and�oraae.ek w (�A7) �13790r' Soils Log - Percolation Test PermmedFar. L71Eh/j C� nr/9n/y, In C.. Loral Doscpr�: POOPuf.td LATI %-CC*/M%ft... I/%JTmm MpA 7`/i tc 2 rr--- r" t 1 16- 17 le. is oR(.ww 6 i s 4j Gh / f*• v b GILAVGI. Vss C.TCIKD WATER w 0 E.eCOLMERED7 e i/f.✓r• — t M L If YO.ATYMATCUTM7 C ILT' d Dr Is Ylstar MAr „t'annwtnr. DRY i One C /r1 E .r es4, )ah h -i. B.C.N. 907 277 7087 P.7 9077 66944 1211 P.e7/11 l�ti CE•BBOI �� O Z . 711 4Y 1.J getyng Os'+ Cross TdrA Not T6re DePMla Water Nat Orep r4tJCdK) /r%� — G — 70 Go — 6" — cicl 70n.d✓ q�/tiA 3 T��" PiA=A10MAATs .7•J e'=++.++rN Fz%r.Fu0/:1—TzR Cq TEST A:a EE':wti EY eZ FT F:ID J is COMMENTS 1; dwe S l5 ENGINEERING P_RfO.ZMEO BY:1 I ^- CERTIFY TrAT TIt15 TEST WAS PeECUMMED INA cjjTc�L°AGUOEI.tNES IU EfFECi Or TMS DATE. DATE: 1CIILIC �-' S 1119 9 DEC 1 52M3 Oct 29 03 02:30E DEAN CO 907 277 7087 P.e .n., •u Cu i •aJ �&Z Cr9U1MtKJNU W1 b94 1211 P.08/11 S S ROBERT C.COWAN. RE* nGlnet?tunG ROBERTA SwERRL CNLENGIMERS rte. (907)624-2M FAX (907) M-1211 S 1119 q DEC 152003 ON-SITE WASTEWATER DISPOSAL SYSTEM CONSTRUCTION PRACTICES. and MATERIAL. SPECIFICATIONS. arwewa.w[a . wwnrnawa . REFERENCE: South 925', W%. E'/i, NW'/., SEI/a, $,M. September 26, 2002. .aKc`a GENERAL: 1. The scope of this project includes the installation of a 1300 gallon HDPE. septic tank and drainfield trenches to serve the proposed four bedroom r,w.�1.«clnads ,wOerrOma residence located on the referenced property. 2. Construction shall be in accordance with the approved site plan and design drawings, Municipal permit with any special provisions or conditions, and all „[uavxrcna. aaawnar applicable State and Municipal Wastewater Disposal Regulations. 3. The contractor shall be responsible for obtaining any necessary underground utility. locates. snEpwa 4. Unless specifically agreed otherwise, the property owner shalt be responsible for final grading areas subsequently depressed from soil settling. A0.DOr40N 5. Contractors installing wastewater disposal systems must be certified by the Municipal Health Department for system installations. Owners installing their own systems must also receive prior approval from the Municipal Health aWr,T • Department. SEPTIC TANK INSTALLATION: rIcowroN I. A septic tank is to be constructed by a certified septic tank manufacturer. Construction shall include two 4" eleanouts for pumping access. anun,nKa aac,ur.cx 06KCro14 2. The septic tank shall be sufficiently bedded to prevent settling or shifting of the tank., ONN,r wIarrw.TG VWCW%4" YSrrr OEW.N 170M NORTH EA= NVERLOOPr SUIT E201• EAGLESNER AIASKAges7r Ort -29 03 02:30p DEAN CO 907 277 7097 p.9 .. �. ,�•,o �e� cn,ttvttrttraa 907 694 1211 P.e9i11 ►ago 2 ill South 82C. W'/., EY„ NW%, $E%, S.M. as September 26, 2002 3. All standpipes on the septic tank shall extend a minimum of 12 inches above final grade. 4. Septic tanks installed with less than 4 R. of cover shall be insulatgd. S. A foundation cleanout shall be installed one to four feet from the building foundation. In the line between the tank and the lwchfield there shall be two adjacent eleanouts (unless an effluent pumping system exists within the septic tank). These eleanouts shall be located on undisturbed soil not more than 10 R. from the tank. The first cleanout, in line. shall be to clean toward the leachfield. The second cleanout -shall be to clean toward the septiotank. 6. Final grading over the septic tank shall be such that a positjye slope exists away from the septic tank. .i ABSORPTION TRENCH/DRAINFIELD INSTALLATION: 1. Excavate the proposed treaeh to the dimensions shown on the design. The bottom of the,. excavation shall be within 2 inches of level. If the sidewalls of the excavation become smeared, .they must be raked or scratched (ruffed -up) before gravel (sewer rock) placement. 2. Once the :gravel is installed, the distribution pipe is to be installed level with the perforations faced downward. Gravel is then to be placed over the distribution pipe to provide a minimum of 2 incherofcover over the pipe. 3. A silt barrier must be installed between the final gravel layer and the native soil backfill. Ensure the silt barrier covers the entire gravel surface before placing backfill. 4. Monitor tubes shall be of four (4) inch diameter, installed approximately in the locations shown on the design, and extend a minimum of 12 inches above final grade. The portion of the monitoring tube extending through the gravel shall be perforated from the bottom of the trench to the invert of the distribution pipe. This is equivalent to the effective depth of.. the gravel as noted on the design. 5. Backfill over the final gravel layer must not be less 11= twenty-four (24) inches. Insulation must be installed when the backfill depth is less than thirty-six (36) inches. The. finish grade over the trench must be mounded to prevent the formation of a depression after sealing. . S 1119 9 DEC 1 52003 Oct 29 03 02:31p DEAN CO V 1-jC Vkge 1011b bob LMUINLLKINi Paq* SoWA 829, WY., El, MWY., 3VA, SM 9*ptembcr2i,2002 MINIMUM MATERIAL SPECIFICATIONS: 907 277 7087 P.10 907 694 1211 P.10i11 1. Any septic tank proposed for installation must be constructed by a Municipal approved septic tank manufacturer. 2. The following pipe materials are approved for use in septic system installations in tre Municipality of Anchorage: Type of Pioe perforated Sol' Cast Iron Yes Yes ASTM D3034 (PVC) Yes Yes ASTM FBI 0 (HDPE) Yes No ASTM D2662 (ABS) Yes Yes +! Use of a type of pipe other than listed above must be approved by the inspecting engineer. 3. Insulation shall be at least 2" thick extruded direct burial polystyrene (Dow Chemipal Company Styrofoam M or equal). 4. Septic tank inlets and outlets shall be fiaed with watertight couplings (Caulder, Femco, or equal). 5. A permeable nontoxic silt barrier (Typar 3401, Mirafi 140N, or equal) must be installed between the final leachfield gravel layer and the native soil backfill. 6. All leachficld gravel (sewer rock) shall be 0.5"-2.5" screened gravel with less than 3% passing the 0200 sieve. 7. When sand is being used as a filter material, its gradation specifications must conform.to current M.O.A. or D.E.C. requirements, which ever requirement applies. INSPECTIONS: Typically there will be a minimum of three (3) inspections required during the installation of the wastewater disposal system. These inspections will occur as follows: . S 1119 9 DEC 1 52003 7r -J q C� T),r-r-vv,,4- S 1119 9 DEC 1 52W3 Fix Heedcr U.S. ARMY ENGINEER DISTRICT, ALASKA REGULATORY BRANCH POST OFFICE BOX 898 ANCHORAGE, ALASKA 99506-0898 Alaska District FACSIMILE HEADER SHEET FROM: OFFICE: 907-753-2712. Dennis A. Stone CEPOA-CO-R-S FAX: 907-753-5567 TO: M. OBrien OFFICE: MOA -Planning OFFICE: 343-7937 FAX: 343-7027 REIEASEWS SIO.: NO. PAGES +COVER w 8 DATE: 29 Aug 2103 SUBJECT: Woodhaven Nationwide Permit for stream crossing. Sincerely. s-r--� enriis A scone Project Manager Regulatory Branch. Corps of Engineers dennis.a.stone 02.uesce. .mil S 1119 9 DEC 1 52W3 Fix Heedcr C� 9 $1119q DEC 15 to Dean Company Inc. D-2002-1041 24 Feb. 2003 Page 4 of 5 t�4 r+ed([t7/zona an: ac varioacrac 1[C,Vi.�LMIUI[T anww,.� 03 rr o0 Zo N m S 1119 q DEC 1 5 goat Dean Compagy Iac. D-2002-1041 24 Fob. 2003 Page 5 of 5 ozv ydm n 7z0 L S.1119 9 DEC 1 5 2003 Dean Company Inc. D-2002-1041 24 Feb. 2003 Page 3 of 5 V I I N r � f J N 2 F N ` O V g O 2 W X O n M I V L S.1119 9 DEC 1 5 2003 Dean Company Inc. D-2002-1041 24 Feb. 2003 Page 3 of 5 V I I N � f J v \L6 i2 X O n U i 53 I M 330' S 1119 9 DEC., 5 2003 L w 0 (30Vd5 N33a9) ' m , ��w N1p N I • �+/l1 1 lwl�� I ifl ' • a o Dean Company Inc. D-2002-1041 ' 24 Feb. 2003 –Page 2 of 5 — – – T O �m C) COa -"4 Z C] � Z Not" :on Pdne ukL woQ uzrno+im p►rne fkuwtion N Your bmaser- page 1 of 1 @2002 n�,.�. Wa•*lk.UW. b� Idlr Cmrl. d, ISI . ISEVeda4mm 0700216e��1G4r�AerlYWx4 Nftift*MOD" beft srvM, CdWW 0M M p�amA�O Ms W4 WAmm Ut All 01o000wO0v14i p� Tiv■+dem. M.N ApN.r.�«v.4. kM. M«M.4 dP�. k n.t napw�ll� k OM�bnR«+M.i'rrid W.r wsMCO2 � Vi¢ N diet Mrrwd ' . Sw 3 http://www.expe a.C='Ipub . Dean Company Inc. D-2002-1041 grZ2/2002 24 Feb. 2003 Page 1 of 5 S 1119 q DEC 1 5 20 -2 - Please take a moment to complete and return the enclosed questionnaire. Our interest in to see how we can continue to improve our service to you, our customer, and how best to achieve these improvements. upon your request, you may also provide additional comments by telephone or a meeting: We appreciate your efforts and interest in evaluating the regulatory program. Nothing in this letter shall be construed as excusing you from compliance with other Federal, State, or local statutes, ordinances, or regulations,. which may affect this work. Please contact me at the letterhead address, ATTNi CEPOA-Co-R-S, at (907) 753-2724, or by FAX at (907) 753-5567, if you have any questions. For additional information about our regulatory program, visit our web site at www.poa.unace.army.mil/reg. Sincerely, SIGNED0�o7 Dennis A. Stone Project Manager Enclosures $ 1119 9 DEC 1 5 200.1 Anchorage Bowl BCF, • CONCUR CSPOA-CO Stone/cfc/3-2789 DAB(2002-1041)/24 Feb 03 (1145b) Mr. Tim Rumfelt, DEC, Anchorage, Alaska 99501-2617 Project Coordinator, DGC, Anchokage, Alaska 99501-3568 Me. Ann Rappoport, USFW9, Anchorage, Alaska 99501-2249 Supervisor, Western Alaska Ecological, NMFS, Anchorage, Alaska 99513-7577 Me. Judith Bittner, ADNR, SHPO, Anchorage, Alaska 99501-3565 Mr. Richard B. Thompson, ADNR, Division of Land, Anchorage, Alaska 99501-3577 Mr. Gary Prokosch, AMM, Division of Water, Anchorage, Alaska 99501-3577 Mr. Lance Trasky, ADpG, Anchorage, Alaska 99518-1599 Alaska Operations Office, BPA, Anchorage, Alaska 99513-7588 Mr. Thede Tobish, Municipality of Anchorage, Department of Planning, Post Office Box 196650, Anchorage, Alaska 99519-6650 Mr. Greg Soule, Municipality of Anchorage, Department of Public works, 4700 S. Bragaw Street, Anchorage, Alaska 99507-1554 r -_J Regulatory Branch South Section D-2002-1041 FEBRUARY 2 5 2003 5 1119 q DEC 1 52003 Mr. Aaron Sweeney Dean Company, Inc. 405 East Fireweed Lane, Suite 201 Anchorage. Alaska 99503-214SS Dear Mr. Sweeneys This Is in response to your November 27, 2002 application for a Department of the Army (DA) permit to construct a culverted crossing over Little Survival Creek. The project is located at the end of Betty Street in the NW W, SE U, Section 3, T. 11 N., R. 3 W., Seward Meridian, Latitude 61. 04. 04- N., Longitude 149. 47' 00' W. in Anchorage, Alaska. Department of the Army permit authorization is necessary because your project would involve placement of dredged and/or fill -material into waters of the U.S. under our regulatory jurisdiction. Based upon the information and plans you provided, we are hereby verifying that the work described above which would be performed in accordance with the enclosed plan (sheets E1-5)), dated 24 February 2003, may be done under the authority of nationwide permit (NWP) #14, Linear Transportation Projects, which is described in Enclosure 1. you must comply with all terms and conditions listed on Enclosure 1, as well as to the special conditions listed below: 1. The culvert will be installed following diversion of the stream around the work site to prevent sedimentation of downstream areas. 2. A 48^ z 24' culvert will be installed in the manner Alaska Department Fish and dame required. 3.The Anchorage Debit/Credit Method shall be used to determine the amount of mitigation required. A conservation easement along Little survival Creek will offset the debits. Further, please mote General Condition 14 requires that you submit a signed certification to us once any work and required mitigation are completed. Enclosure 2 is the form for you to complete and return to us. This verification will be valid for two years from the date of this letter, unless the NWP authorization is modified, suspended, or revoked. SCANNED Short Plat Summary of Action January 5, 2004 L7ff=199 Woodhaven Heights Subdivision Approval of the plat for 18 months subject to the following conditions: Resolving utility easements. 2. Resolving with On -Site Water and Waste Water information to satisfy the requirements specified in AMC 21.15 and AMC 15.65. The information must be submitted for each lot of this proposed subdivision. This information must include, but may not necessarily be limited to: • Soils testing, percolation testing and ground water monitoring must be conducted to confirm the suitability for development using on-site wastewater disposal systems. Ground water monitoring must be conducted during high ground water season in either the fall (October) or spring (April -May). • Areas designated for the original and replacement wastewater disposal system sites must be identified and must meet all criteria specified in AMC 15.65, including slope and setback requirements. • Topographical slope information must be submitted. • Supporting documentation on water availability must be provided. 3. Eliminating the 30 -foot road easement on the western property boundary if being provided via this plat. If the easement exists of record, or vacate the easement if the Traffic Department concurs. 4. Resolving with the Traffic Department, the need to continue the road right- of-way to the east property line, for future connection to Betty Jean Street. 5. Providing a 25 -Coot Stream Maintenance and protection easement along both sides of the stream as required by AMC 21.80.040. 6. Showing the wetland boundary on the plat and the class designation. 7. Placing the following notes on the plat: a. Portions of this property are affected by Class B wetlands. A permit from the Army Corps of Engineers is required for work within the Class B wetlands portion of this property. b. No structures; fill; paving; vehicles, or other materials may be placed within the 25 -Coot stream maintenance and protection easement. No vegetation may be cleared or otherwise significantly Short Plat Summary January S, 2004 Page 2 of 6 disturbed within the 25 -foot stream maintenance easement. Prior to the issuance of a building or land use permit, the applicant shall provide a site drainage plan for the area affected by the application, including an appropriate drainage outfall for surface water and roof drainage. The drainage plan shall also indicate effects if any, on adjacent properties. 8. Resolving with Parks and Recreation, the location, size and alignment of the requested public use easement along the outer 10 -feet of the stream maintenance and protection setback. 9. Resolving with Army Corp of Engineers, the need for a new Corp permit for the culvert crossing which is not in the same location as the one previously permitted by the Corp, to The Dean Company, or show the proper location of the culvert crossing already approved by the Army Corp of Engineers. A sign -off from the Corp shall be on a copy of the final plat to ensure that the location is appropriate. S-11203 L Street Slide Replat Original Townsite of Anchorage Approval of the plat for 18 months subject to the following conditions: 1. Resolving utility easements. 2. Resolving with AWWU any required sewer and water disconnects. 3. Providing an as -built survey to Zoning Code Compliance for the existing structures to verify compliance with yard setbacks, or remove the structures. 4. Submitting a parking layout to Zoning Code Compliance to verify compliance with AMC 21.45.080 if any structures are to remain. Labeling Block 35 on the plat, as Elderberry Park. 6. Dedicating an additional 5 feet along the north property line for West 5th Avenue. 7. Placing the following note on the plat: a. This property is located within the Seismic Zone 5 (very high ground failure susceptibility). Engineered foundations are required for construction on this property. b. This property is limited to no more than 12 dwelling units. \ Municipality of Anchorage • Development Services Department *AC Building Safety Division MEMORANDUM DATE: December 17, 2003 TO: Jerry Weaver, Jr., Platting Officer, CPD FROM: Cross, PE, Program Manager, On -Site Water and Wastewater SUBJECT: Comments on Cases due December 18, 2003 The On -Site Water & Wastewater Program has reviewed the following cases and has these comments: 4LS,-11199-11 Woodhaven Heights. Information to satisfy the requirements specified in AMC 21.15 and AMC 15.65 must be submitted for each lot of this proposed subdivision. This information must include, but may not necessarily be limited to: 1. Soils testing, percolation testing and groundwater monitoring must be conducted to confirm the suitability for development using on-site wastewater disposal systems. Ground water monitoring must be conducted during high ground water season in either the fall (October) or spring (April -May). 2. Areas designated for the original and replacement wastewater disposal system sites must be identified and must meet all criteria specified in AMC 15.65, including slope and setback requirements. 3. Topographical slope information must be submitted. 4. Supporting documentation on water availability must be provided. S-11203-1 " L" Street Slide No objections. S-11204-1 Conroy Subdivision. No objections. S-11205-1 Modem Age Estates No objections. Comments on Cases due December 18, 2003 S-11206-1 Calais Subdivision. No objections. S-11210-1 Park Wood Estates. No objections. Page 2 LOUN,SBURY & ASOCIATES, INC. West 6th Avenue, Anchorage, AK 99501 (907) 272-5451 Alaska Toll Free (800) 478-5451 Fax(907)272-9065 November 4, 2003 Municipality of Anchorage Department of Community Planning 4700 S. Bragaw Anchorage, AK 99507 Attn: Mr. Jerry Weaver, Regarding: S''/:, SW 1/4, NE 1/4, NW 1/4', SE %, AND W %:, SE 1/4, NW1/4, SE 1/4, T11N, R3W, SEC.3 Proposed Woodhaven Subdivision The purpose of the attached Preliminary Plat Application is to create two lots from the above referenced property. This remainder tract has previously been submitted for subdivision into four lots and been deniedby the Platting Board. The primary issue behind the denW was access to the proposed lots. Also, the surrounding community had objection with the extension of Betty Street and the effect a new road would have on the adjacent lots to the west. The petitioner has redesigned the proposed subdivision to create only two lots from the remainder tract The Petitionerhas used the comments from the Community, MOA Planning, MOA Traffic, and The Fire Department to create this design and resolve the access issue. The design of the Flag lotwill provide access and frontage to both lots as required by municipal code. The Public Use Easement and constructed drive will provide physical access to Lot 2 and supply adequate tum -around space for emergency vehicles. This design solves the access issue and has no impact on the vegetative buffer between the existing lots to the west. Forthe reasons mentioned above, as the property owners representative, we respectfully request approval of Woodhaven Subdivision. Sincerely, Lounsbury and Associates Inc. ._n Please fill in the information asked for below. PETITIONER* PROPERTY INFORMATION PETITIONER REPRESENTATIVE (IF" Name ilast name 1 Rochelle M. Friendshuh / Showcase Homes, LLC ame 1 name sl Rinckey, Brad aWg essess PO Box 897 / 405 E. Fireweed Lane #203 72:1 W. 6th Avenue Soldotna AK 99669 / Anchorage, AK 99503 Anchorage, AK 99501 Contact Phone: Day: Night Contact Phone: Day 272.5451 Night FAX FAY: 272-9065 E-mail E -mal: brinckey@lounsburyinc.com __._...--- ....- .........-.. -.. ..,,.,..... �. ,u. , �v w wuW vt e „ mus murex mnm may oelay processing ol N6 appkcabon. I hereby certify that (I am)(1 have been authorized to act for) owner of the Property described above and that I Petition to subdivide it in conformance with Title 21 of the Anchorage Municipal, Code of Ordinmes. l understand That payment of the application fee Is nonrefundable and Is to cover the costs assodated with Processing this application, and that R does not assure approval of the subdivision. I also understand that assigned hearing dates are tentative and may have to be stponed by Planning Department staff or the Platting Board, Planning and Zoning Commission, or the Assemby for admintytrative RaAs. must Provide wrtaen proof of Nuthadzation) (use arMtional sheet in necessary) Lots 1 and 2, Woodhaven Heights Subdivision a �l PROPERTY INFORMATION Property Tax #(ooma-my 020-092-06-000 Site Street Address: 16547 Betty Street Current legal description: (use additional sheet If necessary) T11N, R3W, SEC 3, S1/2, SWIM, NE1/4, NW1/4, SEI/2, and W1/2, SE1/4, NW1/4, SE1/4 Zoning: R-6 I Acreage: 6.26 Grid # 3337 # Lots: 1 1 # Tracts: 0 Total #parcels: 1 I hereby certify that (I am)(1 have been authorized to act for) owner of the Property described above and that I Petition to subdivide it in conformance with Title 21 of the Anchorage Municipal, Code of Ordinmes. l understand That payment of the application fee Is nonrefundable and Is to cover the costs assodated with Processing this application, and that R does not assure approval of the subdivision. I also understand that assigned hearing dates are tentative and may have to be stponed by Planning Department staff or the Platting Board, Planning and Zoning Commission, or the Assemby for admintytrative RaAs. must Provide wrtaen proof of Nuthadzation) (use arMtional sheet in necessary) Lots 1 and 2, Woodhaven Heights Subdivision a �l ti Appricaton for Prelhinary Plat continued Page 2 COMPREHENSIVE PLAN INFORMATION Anchorage 2020 Urban/Rural Services: ❑ Urban ❑ Rural Anchorage 2020 West Anchorage Planning Area: ❑ Inside 0 Outside Anchorage 2020 Major Urban Elements: Site is within or abuts: ❑ Major Employment Center ❑ Redevelopment/Mixed Use Area ❑ Town Center ❑ Neighborhood Commercial Center ❑ Industrial Center ❑ Transit - Supportive Development Corridor Floodplain: Eagle River-Chugiak-Peters Creek Land Use Classification: ❑ Commercial ❑ Industrial ❑ Parkslopens space ❑ Public Land Institutions ❑ Marginal land ❑ Alpine/Slope Affected ❑ Special Study ❑ Residential at dwelling units per acre 13'3' 1304' [3 -5- Girdwood• Tumagain Arm ❑ Commercial ❑ Industrial ❑ Parks/opens space ❑ Public Land Institutions ❑ Marginal land ❑ Alpine/Slope Affected ❑ Special Study ❑ Residential at dwelling units per acre ENVIRONMENTAL INFORMATION (m or portion of site affected) Plat: Copies ❑ 42 (long plats) 0 32 (short plats only) Wetland Classification: 0 None ❑'C' ❑'B' ❑'A' Avalanche Zone: 0 None ❑ Blue Zone ❑ Red Zone Floodplain: 0 None ❑ 100 year ❑ 500 year Seismic Zone (Harding/Lawson): 0'1' 0'2' 13'3' 1304' [3 -5- RECENT REGULATORY INFORMATION (Events that nave occurred in last 5 years for an or Portion of site) ❑ Rezoning - Case Number. 0 Preliminary Plat ❑ Final Plat - Case Number(s): 5-11033 ❑ Conditional Use - Case Numbe s : ❑ Zoning variance - Case Number(s): ❑ Land Use Enforcement Action for ❑ Building or Land Use Permit for ❑ Wetlandpermit: ❑ Army Corp of Engineers ❑ Municipality of Anchorage Fee: Plat: Copies ❑ 42 (long plats) 0 32 (short plats only) 0 8%:x11 reduced copy Other maps 0 Aerial photo 0 Housing stock 0 Zoning Mandatory on plat depictions: ❑ Pedestrian walkway ❑ Landscaping required by zoning Property Title: 0 Certificate to Plat Additional required documents unless specifically waived by Platting Officer. 0 Site topography (4 copies minimum) Waived by 0 Soils Investigation and analysis reports (4 copies minimum) Waived by ❑ Subdivision drainage plan Waived b 20-003 (Rev. 011nTack