Loading...
HomeMy WebLinkAboutCAMPBELL CANYON S-11277Campbell Canyon 5-11277 04/03/05 09:94 FAX 9072197650 DEC Dtt&WW Q1002 S HE OF R SKQ DEPT. OF ENVIRONMENTAL CONSERVATION DIVISION OF ENVIRONMENTAL. HEALTH DRINIaNG WATER PROGRAM LttP•//www state.ak.us/dco/deh/ April 4, 2005 /?FMba3i1toGVane$ss RANK H. NURKOWSKI, GOVERNOR S CORDOVA NCHORAGE, AK'99501 onc:(907)269-7696 x: (907)269-7650 Blvinsrdcc.state.ak.ag File: Near Point Knoll Water System PWSID: 218642 Michael Anderson, P.E. -5—//2-77 Anderson Engineering PO Box 240773 Anchorage, AK 99524 Re: Letter of Non -Objection Preliminary Proposal to Extend Near Point Knoll Water Sysum Dear Mr. Anderson: On February 3, 2005 this office received your submittal requesting preliminary approval of the extension of the water distribution system for the "Near Point Knoll Water System". This system was reviewed and approved for construction by this office as a Class A water system. however, since the homes utilizing this facility were going to be built in phases, it was approved for operation as a Class C system on September 7, 2001. This operational approval was based on serving less than 25 people on a daily basis. You have indicated that this system is now planning on adding additional service connections. This falls within the original construction approval. If the total number of bedroom serves exceeds 12, then the system will need to fulfill the operational and compliance requirements of a Class A system. Therefore, usurping that the newly proposed extension meets minimum, regulatory standards, the minimum pressure in all parts of the distribution system will be at least 20 psi, and the existing water source is not adversely impacted, then the ADEC drinking water program has no objections to this preliminary proposal to extend the system. This non -objection does not imply or grant any new construction or operational approval of any portions of this system. It is my understanding that you will be submitting an engineering submittal with a request for departmental construction and operational approval of the new system. , If you have any questions regarding this plan review, please contact me at the above number. Thank you, Vanessa Blevins, P.E. Environmental Engineer cr. ramic Stara , ADEC/Ml/Dw Pmerata :0 Printed on ANDERSON ENGINEERING P.O. BOX 240773 ANCHORAGE, AK 99524 522-7773 522.6779 (FAX) April 4, 2005 Municipality of Anchorage Building Safety Division On -Site Water and Wastewater Program 4700 S. Bragaw Street Anchorage, AK 99507 Attention: Dan Roth Subject: Proposed Campbell Canyon Subdivision, Lots 1 though 6 Septic System Feasibility Study S-11277 Dear Dan: Test holes were placed on Lots 1 through 6 of the proposed Campbell Canyon Subdivision on Sunday, May 9, 2004. The purpose of the test holes was to assess the underlying soil conditions and to determine whether septic systems could be placed on the lots to serve single-family homes. The test holes were placed to depths of 19' utilizing a tracked backhoe. An experienced soils technician under my supervision was onsite during the excavation to log the soils encountered and to perform percolation tests to determine the absorption characteristics of the materials encountered. A monitor tube was placed in each hole to determine the groundwater elevation over a period of time. No groundwater was found in any of the holes during excavation and none has been noted to date. The surface of the proposed subdivision slopes from north to south at varying grades. None of the grades in the subdivision exceeds 15% in the area of the proposed septic systems and is usually much flatter. The slopes to the north on Lots 1, 2 and 3 exceed 25% and the systems must be a minimum of 50' from the edge of the slope. The subdivision is scheduled to be served by the existing Class A well and water system located on Lot 17 immediately west of Lot 6. A 200' protective radius from the well is shown on the Test Hole Location Plan attached to this report. The property is currently heavily treed with both spruce and birch and some areas are thick with underbrush. During the exploration period the ground was covered with up to 3' of snow. A total of 10 test holes were placed throughout the 6 lots. Soils encountered were similar in all the holes with the upper 1' to 3' composed of organics with some peat and organic silt. This layer was underlain by poorly graded to well graded gravel with varying degrees of sand and silt. The majority of the material was found to be clean and fairly dry. Percolation rates were usually less than 2 minutes per inch. These Proposed Campbell Canyon Subdivision April 4, 2005 Page 2 of 2 findings compare closely with soils found in Near Point Knoll Subdivision immediately to the west. This type of material is excellent for the treatment and disposal of septic effluent. As mentioned earlier, no groundwater was found in any of the holes during excavation and none is expected to accumulate during the ensuing heavy runoff period. Further monitoring will be required to determine if any groundwater accumulates in any of the monitor tubes. The Municipal ordinance governing septic systems requires either a reserve area on each lot for septic systems or a minimum of three septic system sites designated on the final plat. Based on our field exploration it appears a minimum of 10,000 square feet of reserve area cannot be found on each lot for septic system development. Since the lots will be served by a community water system no wells with their respective 100' protective radii will be required for each lot. Copies of the test hole logs and percolation test along with a Test Hole Location Plan with the locations for the septic system absorption trenches are attached for your review. Sincerely, B Michael E. Anderson, P.E. Attachments , MUNICIPALITY OF ANCHORAGE DEVELOPMENT SERVICES DEPARTMENT/BUILDING SAFETY DIVISION ON-SITE WATER AND WASTEWATER PROGRAM 4700 SOUTH BRAGAW ANCHORAGE, AK 99519 SOILS LOG — PERCOLATION TEST PROJECT #: PERFORMED FOR: Southcentral Timber Development DATE PERFORMED: 5/8/2004 LEGAL DESCRIPTION: Lot 6. Campbell Canyon TEST HOLE # jOG/OL/PT DATE GROSS TIME GM DEPTH OF WATER NET DROP Start 5/9/04 ,• Silty Gravel 8" GM 1 Bedrock WAS GROUNDWATER ENCOUNTERED? IF YES, WHAT DEPTH? SGP DEPTH OF WATER asional Boulders AFTER MONITORING: - 20 DATE: SLOPE NO S L 0 /Joair P E S-cr-oY, SITE PLAN N See Site Plan See Site Plan READING DATE GROSS TIME NET TIME DEPTH OF WATER NET DROP Start 5/9/04 8:36 8" 1 9:06 30 5.5" 2.S' Recharge 9:07 8" 2 9:37 30 5.75" 2.25" Recharge 9:38 8" 3 10:08 30 PERC RATE: 13.3 MIN./INCH PERC. HOLE DIAMETER: 6" TEST RUN BETWEEN 5.0 FT. AND 6.0 T. COMMENTS: Test Hale Pre Soaked Prior to Percolation Test. TEST PERFORMED BY: AH I, MICHAEL E. ANDERSON, CERTIFY THAT THIS TEST WAS PERFORMED IN ACCORDANCE WITH ALL STATE AND MUNICIPAL GUIDELINES ON THIS DATE: 5/13/2004 2 3 4 5 6 7 8 9 15 17 MUNICIPALITY OF ANCHORAGE DEVELOPMENT SERVICES DEPARTMENT/BUILDING SAFETY DIVISION ON-SITE WATER AND WASTEWATER PROGRAM 4700 SOUTH BRAGAW ANCHORAGE, AK 99519 PROJECT #: SOILS LOG - PERCOLATION TEST PERFORMED FOR: Southcentral Timber Development DATE PERFORMED: 5/8/2004 LEGAL DESCRIPTION: Lot 6. Campbell Canvon TEST HOLE # 2 OG/OL/PT Bedrock WAS GROUNDWATER SLOPE ENCOUNTERED? NO S L IF YES, WHAT DEPTH? 0 DEPTH OF WATER �C Lr P AFTER MONITORING: E DATE: SITE PLAN N See Site Plan See Site Plan READING DATE GM NET TIME DEPTH OF WATER NET DROP Start 5/9/04 8:45 Silty Gravel GM 9:15 30 5.5" 2.5" Recharge Olive 8" 2 9:46 30 5.75" 2.25" Recharge 1 1 9:47 1 8^ 3 10:17 30 5.75" GM/GP Bedrock WAS GROUNDWATER SLOPE ENCOUNTERED? NO S L IF YES, WHAT DEPTH? 0 DEPTH OF WATER �C Lr P AFTER MONITORING: E DATE: SITE PLAN N See Site Plan See Site Plan READING DATE GROSS TIME NET TIME DEPTH OF WATER NET DROP Start 5/9/04 8:45 8" 1 9:15 30 5.5" 2.5" Recharge 9:16 8" 2 9:46 30 5.75" 2.25" Recharge 1 1 9:47 1 8^ 3 10:17 30 5.75" PERC RATE: 13.3 MIN./INCH PERC. HOLE DIAMETER: 6" TEST RUN BETWEEN 5.0 FT. AND 6.0 T. COMMENTS: Test Hole Pre Soaked Prior to Percolation Test. TEST PERFORMED BY: AH I, MICHAEL E. ANDERSON, CERTIFY THAT THIS TEST WAS PERFORMED IN ACCORDANCE WITH ALL STATE AND MUNICIPAL GUIDELINES ON THIS DATE: 5/13/2004 2 3 4 5 6 7 8 9 17 MUNICIPALITY OF ANCHORAGE DEVELOPMENT SERVICES DEPARTMENT/BUILDING SAFETY DIVISION ON-SITE WATER AND WASTEWATER PROGRAM 4700 SOUTH BRAGAW ANCHORAGE, AK 99519 PROJECT #: SOILS LOG - PERCOLATION TEST PERFORMED FOR: Southcentral Timber Development DATE PERFORMED: 5/8/2004 LEGAL DESCRIPTION: Lot 6. Campbell Canyon � I TEST HOLE # 3 SLOPE SITE PLAN Bedrock OG/OL/PT GP a d Poorly Graded Gravel d Medium to Dark Gray in 2.5" - 4" Rocks GM with ML Clusters Intermittent WAS GROUNDWATER ENCOUNTERED? HD S L IF YES, WHAT DEPTH? 0 DEPTH OF WATER A64 Le P AFTER MONITORING: E DATE: N See Site Plan See Site Plan READING DATE GROSS TIME NET TIME DEPTH OF WATER NET DROP Start 5/9/04 10:33 8" 1 10:43 10 Dr 8" Recharge 10:44 8" 2 10:54 10 Dry 8" Recharge 10:55 8" 3 11:05 10 Dry PERC RATE: 1.25 MIN./INCH PERC. HOLE DIAMETER:," TEST RUN BETWEEN 5.0 FT. AND 6.0 T. COMMENTS: Test Hole Pre Soaked Prior to Percolation Test. TEST PERFORMED BY: AH I, MICHAEL E. ANDERSON, CERTIFY THAT THIS TEST WAS PERFORMED IN ACCORDANCE WITH ALL STATE AND MUNICIPAL GUIDELINES ON THIS DATE: 5/13/2004 MUNICIPALITY OF ANCHORAGE DEVELOPMENT SERVICES DEPARTMENT/BUILDING SAFETY DIVISION ON-SITE WATER AND WASTEWATER PROGRAM 4700 SOUTH BRAGAW ANCHORAGE, AK 99519 SOILS LOG PERCOLATION TEST PROJECT #: PERFORMED FOR: Southcentral Timber Development DATE PERFORMED: 5/8/2004 LEGAL DESCRIPTION: Lot S. Campbell Canyon 2 12 13 14 15 ''•' 17 TEST HOLE # 4 OG/OL/PT u. m V) N GM/GP with Very Coarse Sand 80H 18' SITE PLAN N See Site Plan See Site Plan READING DATE WAS GROUNDWATER NET TIME DEPTH OF WATER NET DROP ENCOUNTERED? NO S GP/GM 1 L 10 IF YES, WHAT DEPTH? 8" 0 1" Nominal Rack Size 8" P Silt DEPTH OF WATER Dry 8" AFTER MONITORING: '-""- E GP/GM DATE: 3 12:34 1" - 3" Cobbles Dry 10% - 12% Silt 80H 18' SITE PLAN N See Site Plan See Site Plan READING DATE GROSS TIME NET TIME DEPTH OF WATER NET DROP Start 5/9/04 12:02 8" 1 12:12 10 Dry 8" Recharge 12:13 8" 2 12:23 10 Dry 8" Recharge 12:24 8" 3 12:34 10 Dry PERC RATE: 1.25 MIN./INCH PERC. HOLE DIAMETER: 6" TEST RUN BETWEEN 5.0 FT. AND 6.0 T. COMMENTS: Test Hole Pre Soaked Prior to Percolation Test. TEST PERFORMED BY: AH I, MICHAEL E. ANDERSON, CERTIFY THAT THIS TEST WAS PERFORMED IN ACCORDANCE WITH ALL STATE AND MUNICIPAL GUIDELINES ON THIS DATE: 5/13/2004 2 3 4 5 6 7 8 9 15 17 MUNICIPALITY OF ANCHORAGE DEVELOPMENT SERVICES DEPARTMENT/BUILDING SAFETY DIVISION ON-SITE WATER AND WASTEWATER PROGRAM 4700 SOUTH BRAGAW ANCHORAGE, AK 99519 PROJECT #: SOILS LOG - PERCOLATION TEST PERFORMED FOR: Southcentral Timber Development DATE PERFORMED: 5/8/2004 LEGAL DESCRIPTION: TEST HOLE # OG/OL/PT GP/GW Golden to Golden Rust GP/GW BOH 18.5' G WAS GROUNDWATER SLOPE c a a, Ln N ENCOUNTERED? NO S DEPTH OF WATER NET DROP L IF YES, WHAT DEPTH? 0 `' '• GM DEPTH OF WATER Dr 8' 15% to 20% Silt DATE: S lS-01/ GP/GW BOH 18.5' G WAS GROUNDWATER SLOPE c a a, Ln N ENCOUNTERED? NO S DEPTH OF WATER NET DROP L IF YES, WHAT DEPTH? 0 1 P DEPTH OF WATER Dr 8' AFTER MONITORING: E DATE: S lS-01/ 2 HMO, c umisw No. 0:418: SITE PLAN N See Site Plan See Site Plan READING DATE GROSS TIME NET TIME DEPTH OF WATER NET DROP Start 5/9/04 11:22 8' 1 11:32 10 Dr 8' Recharge 11:33 8' 2 11:43 10 Or 8" Recharge 11:44 8" 3 11:54 10 Dry PERC RATE: 1.25 MIN./INCH PERC. HOLE DIAMETER: TEST RUN BETWEEN 5.0 FT. AND 6.0 T. COMMENTS: Test Hole Pre Soaked Prior to Percolation Test. TEST PERFORMED BY: AH I, MICHAEL E. ANDERSON, CERTIFY THAT THIS TEST WAS PERFORMED IN ACCORDANCE WITH ALL STATE AND MUNICIPAL GUIDELINES ON THIS DATE: 5/13/2004 � J, 2 3 4 5 6 7 8 9 17 MUNICIPALITY OF ANCHORAGE DEVELOPMENT SERVICES DEPARTMENT/BUILDING SAFETY DIVISION ON-SITE WATER AND WASTEWATER PROGRAM 4700 SOUTH BRAGAW ANCHORAGE, AK 99519 SOILS LOG PERCOLATION PROJECT #: TEST PERFORMED FOR: Southcentral Timber Development DATE PERFORMED: 5/8/2004 LEGAL DESCRIPTION: lot 4. Campbell Canyon TEST HOLE # 6 OG/OL/PT GP GP/GW Silt to 8% WAS GROUNDWATER SLOPE ENCOUNTERED? NO S DEPTH OF WATER NET DROP L IF YES, WHAT DEPTH? 0 DEPTH OF WATER �� N L. P AFTER MONITORING: Dry 8" DATE: rE S-I5—O f/ BOH 18' SITE PLAN N See Site Plan See Site Plan READING DATE GROSS TIME NET TIME DEPTH OF WATER NET DROP Start 5/9/04 1:15 8" 1 1:25 10 Dry 8" Recharge 1:26 8" 2 1:36 10 Dr 8" Recharge 1 1:37 1 1 8" 3 1:47 10 Dry FERC RATE: 1.25 MIN./INCH FERC. HOLE DIAMETER: 6„ TEST RUN BETWEEN 5.0 FT. AND 6.0 T. COMMENTS: Test Hole Pre Soaked Prior to Percolation Test. TEST PERFORMED BY: AH I, MICHAEL E. ANDERSON, CERTIFY THAT THIS TEST WAS PERFORMED IN ACCORDANCE WITH ALL STATE AND MUNICIPAL GUIDELINES ON THIS DATE: 5/13/2004 MUNICIPALITY OF ANCHORAGE DEVELOPMENT SERVICES DEPARTMENT/BUILDING SAFETY DIVISION ON-SITE WATER AND WASTEWATER PROGRAM 4700 SOUTH BRAGAW ANCHORAGE, AK 99519 PROJECT #: SOILS LOG - PERCOLATION TEST PERFORMED FOR: Southcentral Timber Develooment DATE PERFORMED: 5/8/2004 LEGAL DESCRIPTION: Lot 4. Campbell Canyon TEST HOLE # 7 OG/OL/PT Fi 3 4 ' :; GP Rust `,,. w d • 2:06 5 :.,. GP 1 Ln N 10 :: 49th .. • •-: < Dark Gray 2:17 8^ 6 2 i �• Hpu[l C ANDERSON� • •. Dr �1 f° No. a*:�? Recharge I 1 2:Y8 81• 3 2:38 10 r 7 :. 4•.: 8 • WAS GROUNDWATER 9 GM Lenses ENCOUNTERED? NO S :'. •; •, L 10 IF YES, WHAT DEPTH? O .i. • DEPTH OF WATER ���` P 11 AFTER MONITORING: E 12 Clean, Sloughing DATE: .`. �1 _ 17 BOH 16.5' SITE PLAN N See Site Plan See Site Plan READING DATE GROSS TIME NET TIME `,,. NET DROP • 2:06 �•,. 8' 1 2:16 10 :: 49th .�} Recharge 2:17 8^ ' ' �• • 2 i �• Hpu[l C ANDERSON� • •. Dr �1 f° No. a*:�? Recharge I 1 2:Y8 81• BOH 16.5' SITE PLAN N See Site Plan See Site Plan READING DATE GROSS TIME NET TIME DEPTH OF WATER NET DROP Start 5/9/04 2:06 8' 1 2:16 10 Dry 8" Recharge 2:17 8^ 2 2:27 10 Dr 8' Recharge I 1 2:Y8 81• 3 2:38 10 r PERC RATE: 1.25 MIN./INCH PERC. HOLE DIAMETER: TEST RUN BETWEEN 5.0 FT. AND 6.0 T. COMMENTS: Test Hole Pre Soaked Prior to Percolation Test. TEST PERFORMED BY: AH I, MICHAEL E. ANDERSON, CERTIFY THAT THIS TEST WAS PERFORMED IN ACCORDANCE WITH ALL STATE AND MUNICIPAL GUIDELINES ON THIS DATE: 5/13/2004 MUNICIPALITY OF ANCHORAGE DEVELOPMENT SERVICES DEPARTMENT/BUILDING SAFETY DIVISION ON-SITE WATER AND WASTEWATER PROGRAM 4700 SOUTH BRAGAW ANCHORAGE, AK 99519 PROJECT #: SOILS LOG — PERCOLATION TEST PERFORMED FOR: Southcentral Timber Development DATE PERFORMED: 5/8/2004 LEGAL DESCRIPTION: lot 3. Campbell Canyon TEST HOLE # B SLOPE CITF PI ANI 2 GROSS TIME OG/OL/PT 13 .,:. ........ ���OF ;. 8" GP 1 10 3 8" Recharge 2:16 49 8" • 2 2:26 `"w . s I6 ' W ♦I��jf., Na. tttm �, i .` : d 3 4 :=.. 17 n I8 5 BOH 18' GP/GW N .., . • "• Silt to 10% 6 .;.: �•: 8 • WAS GROUNDWATER 9 ENCOUNTERED? NO S L 10 IF YES, WHAT DEPTH? O �• • DEPTH OF WATER ,. P II AFTER MONITORING: E DATE: 12—Clean, Sloughing GROSS TIME NET TIME 13 .,:. ........ ���OF 2:05 8" 14- 4 1 10 Dr 8" Recharge 2:16 49 8" • 2 2:26 `"w . .. ... ...�. I6 ' W ♦I��jf., Na. tttm �, i .` : ♦� `°9�'••............... •••• E�Q� 3 2:37 NarIPROFESS16 0- 17 I8 BOH 18' N See Site Plan See Site Plan READING DATE GROSS TIME NET TIME DEPTH OF WATER NET DROP Start 5/9/04 2:05 8" 1 2:15 10 Dr 8" Recharge 2:16 8" 2 2:26 10 Dry 8" Recharge 1 2,27 18» 3 2:37 10 Dry PERC RATE: 1.25 MIN./INCH PERC. HOLE DIAMETER: TEST RUN BETWEEN 5.0 FT. AND 6.0 T. COMMENTS: Test Hole Pre Soaked Prior to Percolation Test TEST PERFORMED BY: AH I, MICHAEL E. ANDERSON, CERTIFY THAT THIS TEST WAS PERFORMED IN ACCORDANCE WITH Al I STATF ANn MIINIrIPAI CIIInFI INFR ON THIS DATF: 5/13/2004 2 3 4 5 6 7 8 9 17 MUNICIPALITY OF ANCHORAGE DEVELOPMENT SERVICES DEPARTMENT/BUILDING SAFETY DIVISION ON-SITE WATER AND WASTEWATER PROGRAM 4700 SOUTH BRAGAW ANCHORAGE, AK 99519 PROJECT #: SOILS LOG — PERCOLATION TEST PERFORMED FOR: Southcentral Timber Development DATE PERFORMED: 5/8/2004 LEGAL DESCRIPTION: Lot 1. Campbell Canyon TEST HOLE # 9 OG/OL/PT ,• '• GP S Rust NET DROP L IF YES, WHAT DEPTH? O GP/GM 1 P AFTER MONITORING: Silt 10% to 20% E DATE: 3:12 8" 2 3:22 10 Dr 8" Recharge 1 3:23 8" 3 3:33 10 Dry •i ` Clean, Sloughing WAS GROUNDWATER SL ENCOUNTERED? HD S DEPTH OF WATER NET DROP L IF YES, WHAT DEPTH? O DEPTH OF WATER 1 P AFTER MONITORING: Dr E DATE: 3:12 BOH 15' SITE PLAN N See Site Plan See Site Plan READING DATE GROSS TIME NET TIME DEPTH OF WATER NET DROP Start 5/9/04 3:01 8" 1 3:11 10 Dr 8" Recharge 3:12 8" 2 3:22 10 Dr 8" Recharge 1 3:23 8" 3 3:33 10 Dry PERC RATE: 1.25 MIN./INCH FERC. HOLE DIAMETER:_ TEST RUN BETWEEN 5.0 FT. AND 6.0 FT• COMMENTS: Test Hole Pre Soaked Prior to Percolation Test. TEST PERFORMED BY: AH I, MICHAEL E. ANDERSON, CERTIFY THAT THIS TEST WAS PERFORMED IN ACCORDANCE WITH ALL STATE AND MUNICIPAI GIIIDFI INFS ON Tmm 1)ATF• 5/13/2004 MUNICIPALITY OF ANCHORAGE DEVELOPMENT SERVICES DEPARTMENT/BUILDING SAFETY DIVISION ON-SITE WATER AND WASTEWATER PROGRAM 4700 SOUTH BRAGAW ANCHORAGE, AK 99519 PROJECT: SOILS LOG - PERCOLATION TEST PERFORMED FOR: Southcentral Timber Develaoment DATE PERFORMED: 3/6/2005 LEGAL DESCRIPTION: lot 2. Campbell Canyon TEST HOLE # 10 SLOPE SITE PLAN 1-0 OG/OL/PT 2 3 4 . a . •': • GP Rust a: 5 `• •'`" GP/GM '• Silt 10% to 20% 6 �" AFTER MONITORING: .1O'jC E DATE: 7, :� •. 8.38' 2 2:32 8- Dry 8.38' Recharge 2:33 9- 910 3 2:43 10 Dr. 10— y q.• Clean, Dense I I • .: 12- 2 13 13 ,gyp.•,.... .y�i.. 14, •..7 49th 17 BOH 15' WAS GROUNDWATER ENCOUNTERED? NO S DEPTH OF WATER NET DROP L IF YES, WHAT DEPTH? 0 DEPTH OF WATER 1 P AFTER MONITORING: .1O'jC E DATE: � gnuR C AXERS No. aim N See Site Plan See Site Plan READING DATE GROSS TIME NET TIME DEPTH OF WATER NET DROP Start 3/6/05 2:11 8.25' 1 2:21 10 Dry 8.25" Recharge 2:22 8.38' 2 2:32 10 Dry 8.38' Recharge 2:33 8.25' 3 2:43 10 Dr. PERC RATE: 1.25 MIN./INCH PERC. HOLE DIAMETER: 6= TEST RUN BETWEEN0FT. AND 6.0 T. COMMENTS: Test Hole Pre Soaked Prior to Percolation Test. TEST PERFORMED BY: AH I, MICHAEL E. ANDERSON, CERTIFY THAT THIS TEST WAS PERFORMED IN ACCORDANCE WITH ALL STATE AND MUNICIPAL GUIDELINES ON THIS DATE: 3/06/2005 SEP -07-2005 WED 02:06 PH LANTECH FAX NO. 5616626. ,)sv. r. cvv7 I:Ylrm anoerson engineering ,.,. : no. U417 USK SME 0 ed. DEPT: OF )ENVIRONMENTAL CONSERVATION DMSION OF ENVIRONMEN''TAL HEALTH DRINKING WATER PROGRAM Il w 4t et n rah/ tn://ww May 17,200S P. 02 r. 'I IMANVE r4Uwwsart ra0VENMR 555 CORDOVA ANCHORAGE, AK 99501 Phone; (907)269-7696 Fax: (907) 269.7650 tnai t2;Vanessa Slav n�(1A.� ,•t. k +o File: Near Point Knoll PWSW: 219642 Michael Anderson, PE Anderson Engineering PO Box 240773 Anchorage, AK 99524 Re: Cond'uionalConstruction Approval Wear Point Knoll, Water Distribution Extension of Class A water sourco Dear Mr. Anderson: Oa April l3, 2005 this office received your submittal requesting construction approval of the distribution line servIdt the "Near Point Knopf water system. This system was originally torsstructed as a Class A system and has been oponting as a Class C system, because the system has been serving less than 25 people per day. The submitted plans address a 500 fact water distribution extension of s Inch ductile iron pipe to serve newly Combuctcd homes. Based on the following this system U granted construction approval: 1. Calculations are submitted which Show that the "am is Capable of meeting a minimnnt of 20 psi in oil parts of the water system (existing and new), at the new peak flow. 2. The end of the water lines in the cud -de -Sae and along Athena's Way (STA 5_S8.63 WL and STA 1+60.0 WL) must pmlde access for be Rushing and sampling. 3. If the existing distribution system will be Impacted during the construction of this now extension, plans must be submitted for any needed temporary water distribution Services. 4. Following construction, the system must be disinfected as per the current AW WA standard (C-651-99). The locatiationassociated total eolifomt bacteria sample results, including sampling s and dates, should be submitted with the system u -bunts, in order to receive ftnol operstional approval. S. The new system will have to meet all monitoring and compliance requirements for a Class A System. Jamie Stan), of this office (269-7624), will be able to assist you in this matter. CAMpBFZ[, Cps YvN �.�j NiadonR�yc4J r5per SEP -07-2005 WED 02:06 PM LANTECH FAX NO.: 5616626: P. 03 ,.. o■v.. r. cvvj r:virm. aneerson engineering: i i E Near Point Knoll 5/17101 Based on the above, this system is conditionally approved for construction. I have attached the associated Tonstructlon and Operation% certificate. If you have any questions regarding this Plan review, please contact me at the above number. Bank you, Vanessa Blevins, P.E. Environmental Engineer eoc: Construction end Opererion CettiFKrte for publlC Werer Systetnc eC: Iende Stant, ADX0rWDW program II;q ReIA, ADMW&wf0SDs Prop= ANDERSON ENGINEERING P.O. BOX 240773 ANCHORAGE, AK 99524 522-7773 522-6779 (FAX) MEMO DATE: 2/3/2005 TO: Dan Roth WITH: MoA/On-Site Water and Wastewater FROM: Mike Anderson vtza SUBJECT: Campbell Canyon Subdivision S11277-1 Attached is a letter recently submitted to ADEC concerning the Near Point Knoll Water System which will serve the six lots in the proposed Campbell Canyon Subdivision. The water system has sufficient capacity to serve the additional six lots without additional storage. Condition to Plat No. 5a (attached) requires submission of a copy of the Certificate to Operate a Community Well. We are unsure as to what this requirement actually means. The attached documentation includes the Certificate to Operate the Near Point Knoll well and water system, which will hopefully resolve this requirement. Please review the attached documentation and advise if further information is required prior to the resolution of this requirement. ANDERSON ENGINEERING P.O. BOX 240773 ANCHORAGE, AK 99524 February 3, 2005 State of Alaska Dept. of Environmental Conservation 555 Cordova Street Anchorage, AK 99515 Attention: Vanessa Blevins, P.E. Subject: Near Point Knoll Water System Expansion PWSID No. 218642 Preliminary Certificate to Construct Dear Ms. Blevins: The developer of Near Point Knoll Subdivision is currently developing Campbell Canyon Subdivision immediately to the east of Near Point Knoll. Campbell Canyon consists of 6 single family home lots which are proposed for water service from the Near Point Knoll Class A Water System. A new 8" DIP water main will be extended from the existing water main near the pump house approximately 500'. Six 1" water services will be extended from the main to serve the individual lots. The addition of the new lots will increase the peak demand on the water system by 54 gallons per minute for 20 minutes or 1,080 gallons. The total demand on the water system then becomes 4,500 gallons as it will eventually serve 25 households. The water system currently has a capacity of 10,000 gallons of static storage in the well house in the form of 2 — 5,000 gallon tanks. In addition, the 8" water main provides approximately 6,000 gallons of storage. The total storage is far in excess of that demanded by the water system. The well charging the system has a rated capacity of 50 gallons per minute. A complete design of the water main expansion will be provided in the near future. The attached drawings show the alignment of the new main and the location of the new services. We hereby request confirmation from you that based on the aforementioned information it is possible to expand the Near Point Knoll Water System to serve the additional six lots. Sincerely, Michael E. Anderson, P.E. Attachments xc: Dan Roth, Municipality of Anchorage Joe Henri, South -Central Timber Development STATE OF ALASKA DEPARTMENT OF ENVIRONMENTAL CONSERVATION CONSTRUCTION AT%D OPERATION CERTIFICATE FOR A- APPROVAL TO CONSTRUCT PUBLIC WATER SYSTEMS ADEz- 9921-Dw-172-58-5 Pws1D ,7a- 2186¢2 Plan for the construction ormodtscation of fjp't"t'� P^' -"t X� public ,water system located in Alaska, submitted in accordance with IS AAC 80.300 by Chave been reviewed lmd We i ❑ appmvcd. conditionally approved (see attached conditions). ttzta _ a If construction has not started within two years of the approval dzte, this eettifi=te is void and new plans and specifications must be submitted for review and approval before construction. B- APPROVED CHANCE OrDERS Change (contract order number or descriptive reference): Approved by: Date: C. APPROVAL TO OPERATE The -APPROVAL TO OPERATE" section mast be completed and signed by the Department before this system is made avallable for use. 1 The construction of the 20 Iii Pp Lvtj� K ZrC-f public water system was completed On f i l2 Zo0(date). The system is hercbyg=t;.cl interim approval to operate for 90 days following the completion date. By Trrm VVM As-built/record drawings, submitted to the Depamamt, or an inspection by the Deparnnemt have confirmed that the system was eon=cted according to the approved pJzYs.. The system is herby granted fmal approval to operate. Received Time Jul .23.. 2:46PM �/vU'2�r:7rG'it 7zoo TME 'DATt Distribution: I. Retain original forproj= fde 2. Mske copies for distribution tajin.n Irmo .t i. rani Z O -i m Inx� N� O CCD 0 N n� O x NO 3 +t-a tm o' o N CD 3 <' m 0 vN N n ,rJ C N CD D CD m 0 r � r O o u \ O5 r Oy'o O ® Ol r to a O N s m '0 r C7 w Cn C7 C) 0 m m C) r0 D P o C) D � -� o0 m O CA r- � O -oNDCj z 4-< O z cnC 1,5 x••, ...... 's . � O ; h Q0 '^ r ri " S : TI r V J r13[ r O .'• • ♦r♦♦ z