Loading...
HomeMy WebLinkAboutBASEBALL S-11499-1Baseball 5-11499-1 I 1 I 1 • 1 Itb t �}' I !'i 1TF°,'� -°AI's _=�=,ac i � R 'stssof Short Plat Summary of Action June 5, 2006 Page 2 of 4 b. Landscaping meeting the arterial land ping standards under AMC 21.45.125.C.4 shall be inst along the south property boundary. The landscaping i be maintained by the property _ o er or his/her designe . 11. Making the foil ng dr mg changes: a. Street N Vic 'ty Map: Lakeshore Dr is mislabeled; Wisco n Street has ong street type; Aviation Ave has wrong str tvoe. W Internation Airport Rd is missing b. Title Block Information: Grid shouldb< 1826. S-11499-1 Baseball Subdivision Approval of the plat for 18 months subject to the following conditions: 1. Resolving Utility Easements. 2. Resolving with Land Use Enforcement, the need to submit parking calculations and a parking layout verifying compliance with AMC 21.45.080. 3. Resolving with Land Use Enforcement, the need to execute a shared parking agreement between Tracts Al and A2. 7 4. Resolving with Land Use Enforcement, the need to submit a landscaping plan showing details of refuse screening and the location and type of plant materials used to satisfy the landscaping requirements of AMC 21.40.180.N and 21.45.080.X. �K 5. Resolving with On-site Water and Wastewater and Alaska DEC, the need to have certificates to construct issued, and to obtain operating 3a" 06 permits for on-site wastewater disposal systems and water systems QI 6 that will serve any structures on these properties. Resolving with the Municipal Traffic Department, the need to provide a Traffic Impact Analysis to be approved by the Municipal Traffic Engineer as per Note 4 on underlying Plat 98-53. STATE OF ALASKA DCOTRRUUCCTION AND OPERATIONOF ENVIRONMENTAL CERTIFICATENST FOR PUBLIC NATER SYSTEMS A. APPROVAL TO CONSTRUCT «public Water plans for the construction or modification of South Am IAU¢eenrts Park Rl WSTp 2jai442. a.janjf System, located in Anchorute Alaska, submitted in accordance with ISAAC 80.205 by D ir• David Arebart P.E. have been reviewed and are ❑ approved as submitted ® conditionally approved (See ADEC letter Baled June 19, 2006) Environmental EnSiaeer June 19 2006 (Tide) (Date o[ Approval) ( vnog Eogmeer) . If applicant fails to construct, alter, install, or modify the system within two Yearn of the date of approval to construct approval is void, and plans must be resubmitted for Department review and approval. B. APPROVED CIIANGE ORDERS Change (contract order number or descriptive reference) (Tide) (tate of Approval) (Reviewing Engineer) C. APPROVAL TO OPERATE completed end signed by the Department before any water is made The "Interim Approval to Operate" section must be available for public use. Interim Approval to Operate: The construction of So nth Anchoraee Soorts Yark (pyVSID 2187491, a ala s� "R" Public Water System has System hereby granted INTERIM ID) TOis 218749• eThis interim approvaldatede ADEC letter Th expires on Identification Number (PWSID) for this system It is illegal to operate a public water system beyond the expiration date without Final Approval to Operate from the Department (fide) (Date of pppmvul) (Reviewing Engineer) Final Approval to Operate: Record drawings and other documents submitted to the Departmem, or an inspection plan the system is hereby granted FIN L by the Department, has confirmed that the public water system was constructed in substantial conformance with the approved p APPROVAL TO OPERATE. See ADEC letter dated (Dam of App ova4 (Reviewing Eaaineer) (fide)