Loading...
HomeMy WebLinkAboutSUNDI LAKE BLK 1 LT 8 ,. · ' Municipality of Anchorage Page / of DEPARTMENT OF HEALTH AND HUMAN SERVICES ENVIRONMENTAL SERVICES DIVISION P.O. Box 196650 · Anchorage, Alaska 99519-6650 · Telephone: 343-4744 On-Site Wastewater Disposal System and/or Well Inspection Report Permit Number: ~6J~7~9~/-~_~ PID Number: (~/!- .a,~e: ~ ~5~/~M Wastewater System: D New ~Upgrade ~ Address: ~ ~[ ~. ~ ~ ~ ABSORPTION FIELD Phone: ~~ No. of Bed~ms: ~eepTrench ~ShailowTrench ~Bed ~Mound ~Other Total Depth from original grade: LEGAL DESCRIPTION SoilRating: ~ ~ GPD/Sq. Ft. /~.5 Lot: ~ IBr°Che/Rang: ~;;;~: ~ Depth Io pipe bof~original grade: Ft. Gravel depth beneat~p~e Township: ~ ] ~ction: ~ Fill added above ori ina[ grade: FL Ft. /,:~, ~, Gravel length: ~' ~ ' Number~f lines: I D,stance be~een I,nes: WELL: ~ New ~ Upg G,ave~ wid,h: ~ Ft. ~' F,. Pi e material: Oiassification(Private, A,B,O):~. ~t.T°talD. OasedTo: Ft. Totalabsorption~ ~ SO. Ft. ~J~ Driller: ~ Date Drilled: S,atic Water Level:Ft. installer: O~ Date instaged:~./~_~ 7 Yield: Pump Set at: SEPARATION DISTANCES ~Septic ~ Holding ~ S.T.E.P. To Septic Absorption Lilt Holding ~ublic/Prlw~e Manufa~ ~ ~Cap~cty n a ~: From Tank FielG Station Tank Sewer Lines . ~  Manufacturer: Linek 'Pump on" ,eve, a~ off" level at: I High water alarm at: Remarks: ~Y,~C ~ ~'~,~,~ BENCH MARK Location and Description: I Assumed Elevation: /~ ENGINEER'S SEAL Inspections pedormed by: ~ ~ = =:;=;~====~ Dates: 1st ¢'//~ · % :34 Eagle R,veF [~ E~ 2nd ~-/~' q? ie ~iver, Alaska ~5~ %~ ~ ~ ~ ROBERT C. COWAN Department of Henl~ and Human ~ervices a~proval ~. c~-es01 Reviewed and approved by: ate:/~-~ .,,~.,. 794313 (Rev. 9/91) MOA 25 PERMIT NO. SW970245 PAGg 2 Or 2 Municip. ~Lil oF Anchor~ae DEPARTMENT OF HEA~_TI-I AND HUMAN SERVICES ENVIRONMENTAL SERVICES DIVISION P.13. Box 196650 eAnchor'oge, Ato. sko, 99519-6650eTetephome: 343-4744 ON-SITE WASTEWATER DISPOSAL SYSTEM AND/OR WELL INSPECTION REPORT LBC-AL LOT 8, BLOCK 1, SUNDI LAKE S/D P.I.D. NO. 011--131--08 NOTE: LINE WAS BURIED 7'+BELOW GRADE UNDER DRIVEWAY \ C02 \ . ALT. SITE~ \ TRENCH / 1250 GAl_. SEPTIC TANK NOTE STI ~ ST2 - MT1 COg CO1 = 102.3' · ~ NEW ~ ~ /co~ = ~o4.z 9t.3'/ J l250 aAL J%m.~' / S.T. I ~"  CO1 = 91.0' · NO WATER FOUND 80.9' B.O.H. A FCO 65.5' ¢- 57.0' ST1 35.0' 19.5' ST2 .38.0' 26.5' DBL1 59.5' 29.0' DBL2 40.0' ,30.0' C01 56.5' 58.5' MT1 54.0' 56.0' C02 41.0' 46.0' EXST. WELL PAGE MUNICIPALITY OF ANCHOP~AGE DEPARTMENT OF HEALTH AND HUPiAN SERVICES P.O. BOX 196650, 825 "L" STREET, ROOM 502 ANCHORAGE, ALASKA 99519-6650 ON-SITE WASTEWATER DISPOSAL SYSTEM (UPGRADE) PERMIT PERMIT NUMBER:SW970245 DESIGN ENGINEER:S & S ENGINEERING OWNER NAME:CHRISTIANSON MARLINE A OWNER ADDRESS:8235 SUNDI DR ANCHORAGE, AK 99502 DATE ISSUED: 8/07/97 EXPIRATION DATE: PARCEL ID:01113108 LEGAL DESCRIPTION: iSUNDI LAKE BLK 1 LT 8 i LOT SIZE: 26500 (SQ. FT.) NUMBER OF BEDROOMS: 4 THIS PERMIT: 4 THIS PERMIT IS FOR THE CONSTRUCTION OF: DISPOSAL FIELD /SEPTIC TANK SYSTEM ALL CONSTRUCTION MUST BE IN ACCORDANCE WITH: 1. THE ATTACHED APPROVED DESIGN. 2. ALL REQUIREMENTS SPECIFIED IN ANCHORAGE MUNICIPAL CODE CHAPTERS 15.55 AND 15.65 AND THE STATE OF ALASKA WASTEWATER DISPOSAL REGULATIONS (18AAC72) AND DRINKING WATER REGULATIONS (18~AC80). THE ENGINEER MUST NOTIFY DHHS AT LEAST 2 HOURS PRIOR TO EACH INSPECTION. PROVIDE NOTIFICATION BY CALLING 343-4744 ( 24 HOURS ) (NOT REQUIRED FOR WELL ONLY PERMIT) 4. FROM OCTOBER 15 TO APRIL 15 A SUBSURFACE SOIL ABSORPTION SYSTEM UNDER CONSTRUCTION DURING FREEZING WEATHER MUST BE EITHER: A. OPENED AND CLOSED ON THE SAME DAY B. COVERED, SEALED AND HEATED TO PREVENT FREEZING 5. THE FOLLOWING SPECIAL PROVISIONS. 1 OF 8/07/98 ) SPECIAL PROVISIONS: AMC 15.65. INSTALL ALL NECESSARY CLEANOUTS AS SPECIFIED BY THE RECEIVED BY: ISSUED BY: DATE: ~/~./~ DATE: SEWER&WATER INSPECTION ENGINEERING STUDIES AND REPORTS WELL INSPECTION & FLOWTEST SITE PLANS ROAD DESIGN SOILTEST PERCOLATION TEST ONSITE WASTEWATER DISPOSAL SYSTEM DESIGN ROBERTC. COWAN, RE. ROBERTA, SHAFER, RE. J~y29, 1997 CIVIL ENGINEERS (907) 694-2979 FAX (907) 694-1211 MUNICIPALITY OF ANCHORAGE Department of Health and Human Services P.O. Box 196650 Anchorage, AI<. 99519 REFERENCE: Lot 8, Block 1, Sundi Lake Subdivision MUNICIPALITY OF ANCHORAG~ ENVIRONMENTAL SERVICEs DIVISION JUL 3 0 19~)? RECEIVED Request you issue a permit to upgrade the septic system serving the existing four bedroom house on the referenced property. A test hole was excavated and percolation test performed. The approximate location of the test hole is located on the attached site plan. The monitoring tube within the test hole has been checked and found to be dry. Attached is the proposed upgrade design. We do not anticipate any adverse effects on neighboring wells, septic systemz or drainage patterns by the installation of the proposed septic system. If you require additional information, please contact us. Sincerely, Robert C. Cowan, P.E. RCC/mg Enclosure 17034 NORTH EAGLE RIVER LOOP · SUITE 204 · EAGLE RIVER, ALASKA 99577 3SflOH 9NIISIX3 '-~>C ~Z m~ 0 Z SOILS LOG -- PERCOLATION TEST 5¢~al &~& Township, Range, Section: PERFORMED FOR: LEGAL DESCRIPTION:j'OT' ~ ~S( I 1 2 3 4 5 6 7 8 9 10- 11 13- 14- 15- 16- 17 18 19 2O COMMENTS SLOPE SITE PLAN WAS GROUND WATER ENCOUNTERED? IF YES, AT WHAT DEPTH? Depth lo Water After ~7/30/~' ~ Monilorino? D~ _YOale: I N Reading Date Gross Net Depth to Net Time Time Water Drop ,~ 0 AdS - [~lc ...~1r¢1A~ ~J PERCOLATION RATE ~ / (minutes/inch) PERC HOLE DIAMETER __ TEST RUN BETWEEN ~ ~- ~ FT AND ~ FT PERFORMED BY: 17U;~4 i;agie Aiver L~p koad No.12 ACCORDANCE WtTH AL~el~¥~I~NImI~I~IP~I~IIDBLINES IN EFFECT ON THIS DATE. DATE: 72-008 (Rev. 4/85) WAS PERFORMED IN P Percent Passing by Weight No. 10 #16 No, 20 #30 'a~'q£9~,L V)~gVqV! ~ 90:II L6-~I-L ROBERTC. COWAN, RE. ROBERT A. SHAFER, P.E. SEWER & WATER MAIN EXTENSIONS SEWER&WATER INSPECTION ENGINEERING STUD]ES AND REPORTS WELL INSPECTION & FLOW TEST ROADDESIGN SOILTEST PERCOLATION TEST STRUCTURAL& MECHANICAL INSPECTIONS ON-SITE WASTEWATER DISPOSAL SYSTEM CONSTRUCTION PRACTICES and MATERIAL SPECH~ICATIONS CIVIL ENGINEERS (907) 694-2979 FAX (907) 694-1211 REFERENCE: Lot 4, Block 3, Sundi Lake Subdivision July 29, 1997 GENERAL: The scope of this project includes the installation ora 1250 gallon septic tank and a five foot wide dralnfield to serve the existing four bedroom residence on the referenced properS. The existing septic system is to be abandoned completely. Construction shall be in accordance with the approved site plan and design drawings, Municipal pemait with any special provisions or conditions, and all applicable State and Municipal Wastewater Disposal Regulations. The contractor shall be responsible for obtaining any necessary m~derground utility locates. Unless specifically agreed othenvise, the prope~y owner shall be responsible for final grading areas subsequently depressed from soil settling. On all leachfield mound systems, the property owner shall be responsible for ensuring a satisfactory vegetation growth over the mounded area. Contractors installing wastewater disposal systems must be certified by the Municipal Health Department for system installations. Owners installing their own systems must also receive prior approval from the Municipal Health Department. gEPTIC TANK INSTAIJ,ATION: A septic tank is to be constructed by a certified septic tank manufacturer. Construction shall include two 4" cleanouts for pumping access. The septic tm~k shall be sufficiently bedded to prevent settling or shifting of the tank. All standpipes on the septic tank shall extend a minimum of 12 inches above final grade. 4. Septic tanks installed with less than 4 fi. of cover shall be insulated. 17034 NORTH EAGLE RIVER LOOP · SUITE 204 ° EAGLE RIVER, ALASKA 99577 Page Two Lot 4, Block 3, Sundi Lake Subdivision July 29, 1997 A foundation cleanout shall be installed one to four feet fi.om the building foundation. In the line between the tank and the leachfield there shall be two adjacent cleanouts (unless an effluent pumping system exists within the septic tank). These cleanouts shall be located on undisturbed soil not more than 10 ft. fi.om the tank. The first cleanout, in line, shall be to clean toward the leachfield. The second cleanout shall be to clean toward the septic tank. Final grading over the septic tank shall be such that a positive slope exists away t~om the septic tank. ABSORPTION TRENCH/DRAINFIELD INSTALLATION: Excavate the proposed trench to the dimensions shown on the design. The bottom of the excavation shall be within 2 inches of level. If the sidewalls of the excavation become smeared, they must be raked or scratched (roughed-up) before gravel (sewer rock) placement. Once the gravel is installed, the distribution pipe is to be installed level with the perforations faced downward. Gravel is then to be placed over the distribution pipe to provide a minimum of 2 inches of cover over the pipe. A silt barrier must be installed between the final gravel layer and the native soil backfill. Ensure the silt barrier covers the entire gravel surface before placing backfill. Monitor tubes shall be of four (4) inch diameter, installed approximately in the locations shown on the design, and extend a minimum of 12 inches above final grade. The portion of the monitoring tube extending through the gravel shall be perforated from the bottom of the trench to the invert of the distribution pipe. This is equivalent to the effective depth of the gravel as noted on the design. Backftil over the final gravel layer must not be less than twenty-four (24) inches. Insulation must be installed when the backfill depth is less than thirty-six (36) inches. The finish grade over the trench must be mounded to prevent the formation of a depression after settling. MINIMUM MATERIAL SPECIFICATIONS: I. Any septic tank proposed for installation must be constructed by a Municipally approved septic tank manufacturer. 2. The following pipe materials are approved for use in septic system installations in the Municipality of Anchorage: Page Three Lot 4, Block 3, Sundi Lake Subdivision July 29, 1997 Type of Pipe Perforated Solid Cast Iron Yes ASTM D3034 (PVC) Sl0 (HI)P ) ASTM D2662 (ABS) Yes Yes Yes Yes No Yes Yes Use of a type of pipe other than listed above must be approved by the inspecting engineer. Insulation shall be at least 2" thick extruded dkect burial polystyrene (Dow Chemical Company Styrofoam HI or equal). Septic tank inlets and outlets shall be fitted with watertight couplings (Caulder, Femco, or equal). A permeable nontoxic silt barrier (Typar 3401, 1Vfiratl 140N, or equal) must be installed between the final leachfield gravel layer and the native soil backfill. All leachfield gravel (sewer rock) shall be 0.5"-2.5" screened gravel with less than 3% passing the #200 sieve. When sand is being used as a filter material, its gradation specifications must conform to current M.O.A. or D.E.C. requirements. INSPECTIONS: Typically there will be a nfinimum of three (3) inspections required during the installation of the wastewater disposal system. These inspections will occur as follows: The first inspection must be conducted at, er the excavation of ditches, pits, trenches, or beds and before the installation of any gravel. A septic tank may be set in place, but may not be backfilled before this inspection. The second inspection must.be conducted after the placement of the silt barrier, gravel, distribution lines, standpipes, cleanouts, and insulation, but before the placement of any other backfill. 3. The final inspection is to occur upon final grading of the property. Page Four Lot 4, Block 3, Sundi Lake Subdivision July 29, 1997 Often there will be more than these 3 inspections required. Especially with the installation of multiple trenches, sand filters, pressurized distribution systems, etcl Thus, the inspecting engineer is to be contacted at least 24 hours prior to the start of construction. If necessary, a pre- construction meeting will take place on-site. The inspecting engineer will not coordinate, direct or control in any way the contractors activities. The owner shall contract with the contractor to perform the work outlined in these specifications and plans and in accordance with the attached M.O.A. permit. There will be no contractual arrangement existing between the contractor and S & S Engineering. S & S Engineering shall be the owner's representative and will inspect the work as stated above to document the contractors activities. Final acceptance of the contractors work rests with the owner and the M.O.A. S & S Engineering shall have no liability to the owner or to others for acts or omissions of the contractor or any other persons performing work on this project or the fa'dure of the contractor to carry out the work in accordance with these construction documents. S & S Engineering's inspecting engineer will not be responsible for the construction means, methods, techniques, sequence, procedures or the safety precautions incident to this project. CONTRACTO1VINSTALLER